167 Scheduling is the process by which decisions are made concerning:A. Tasks to be accomplished.B. Personnel/organization that will be assigned to accomplish the task.C. Time when the tasks are to be completed.D. All of the above.E. A and C only

167 Scheduling is the process by which decisions are made concerning:

A. Tasks to be accomplished.

B. Personnel/organization that will be assigned to accomplish the task.

C. Time when the tasks are to be completed.

D. All of the above.

E. A and C only


相关考题:

A Gantt chart is useful in determining:A.the level of effort for a taskB.when a task starts and stopsC.how tasks are related to each otherD.who is assigned to do a taskE.All of the above.

The critical path is calculated byA.subtracting the end date of task one from the start date of task two.B.determining which tasks have the least amount of total slack.C.totaling the time for all activities.D.determining the shortest path through the network.E.Determining which tasks have the most slack

Scheduling is the process by which decisions are made concerning:A.Tasks to be accomplished.B.Personnel/organization that will be assigned to accomplish the task.C.Time when the tasks are to be completed.D.All of the above.E.A and C only.

85 Scheduling is the process by which decisions are made concerning:A. Tasks to be accomplished.B. Personnel/organization that will be assigned to accomplish the task.C. Time when the tasks are to be completed.D. All of the above.E. A and C only.

139 The scope baseline once established and approved, is used:A. as the basis for making future decisions.B. to accomplish verification measures.C. to evaluate potential changes.D. All of the above.E. A and C only

14 The scope management provides:A. A basis for future decisions about the project.B. A baseline to accomplish verification measures.C. A baseline to evaluate potential scope changes.D. All of the above.E. B and C only

145 Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:A. The project manager and project office personnel.B. The project team and functional managers.C. The project sponsor.D. All of the above.E. A and B only

20 A Gantt chart is useful in determining:A. the level of effort for a taskB when a task starts and stopsC. how tasks are related to each otherD. who is assigned to do a taskE. All of the above

102 A Gantt chart is useful in determining:A. the level of effort for a taskB. when a task starts and stopsC. how tasks are related to each otherD. who is assigned to do a taskE. All of the above

148 Work packages are used to:A. Represent units of work at a level where work is performed.B. Clearly distinguish one work package from all others assigned to a single functional group.C. Limit the work to be performed to relatively short periods of time.D. All of the above.E. A and B only

● A Gantt chart is useful in determining:A the level of effort for a taskB when a task starts and stopsC how tasks are related to each otherD who is assigned to do a taskE All of the above.

● The critical path is calculated byA subtracting the end date of task one from the start date of task two.B determining which tasks have the least amount of total slack.C totaling the time for all activities.D determining the shortest path through the network.E Determining which tasks have the most slack

Which tasks can be accomplished using the DBMS_LOB. SETOPTIONS procedure?() A. only encryption and compression settings for all SecureFile LOBsB. only encryption and deduplication settings for only SecureFile CLOBsC. deduplication, encryption, and compression settings for all SecureFile LOBsD. deduplication, encryption, and compression settings only for SecureFile CLOBs

Which three statements correctly describe the features of the I/O calibration process?() A. Only one I/O calibration process can run at a time.B. It automates the resource allocation for the Automated Maintenance Tasks.C. It improves the performance of the performance-critical sessions while running.D. It can be used to estimate the maximum number of I/Os and maximum latency time for the system.E. The latency time is computed only when the TIMED_STATISTICS initialization parameter is set to TRUE.

Which two are true concerning a multitenant container database with three pluggable database?() A. All administration tasks must be done to a specific pluggable database.B. The pluggable databases increase patching time.C. The pluggable databases reduce administration effort.D. The pluggable databases are patched together.E. Pluggable databases are only used for database consolidation.

People tend to make mistake when ____.A. they perform. several challenging tasks at a time.B. new messages are processed one after anotherC. their relationships with others are affectedD. the tasks require little thought

Concerning the identification signal for a pilot vessel, in fog, which statement is TRUE?___.A.When at anchor, the pilot vessel is only required to sound anchor signalsB.The identification signal must be sounded any time the pilot vessel is underwayC.The pilot vessel may only sound the identity signal when making wayD.All of the above

Which three statements correctly describe the features of the I/O calibration process?()A、Only one I/O calibration process can run at a time.B、It automates the resource allocation for the Automated Maintenance Tasks.C、It improves the performance of the performance-critical sessions while running.D、It can be used to estimate the maximum number of I/Os and maximum latency time for the system.E、The latency time is computed only when the TIMED_STATISTICS initialization parameter is set to TRUE.

Your database operates in ARCHIVELOG mode and all the tablespaces are online. Due to a user error, you decided to perform an incomplete recovery. Which two tasks would you be required to perform in the recovery process?()A、 open the database with the RESTRICTED optionB、 open the database with the RESETLOGS optionC、 recover to the required SCN only that data file in which the error occurredD、 recover all the data files to the same system change number (SCN)

Which two are true concerning a multitenant container database with three pluggable database?()A、All administration tasks must be done to a specific pluggable database.B、The pluggable databases increase patching time.C、The pluggable databases reduce administration effort.D、The pluggable databases are patched together.E、Pluggable databases are only used for database consolidation.

Your database operates in ARCHIVELOG mode and all the tablespaces are online. Due to a user error, you decided to perform an incomplete recovery.  Which two tasks would you be required to perform in the recovery process? ()A、open the database with the RESETLOGS optionB、open the database with the RESTRICTED optionC、recover all the data files to the same system change number (SCN)D、recover to the required SCN only that data file in which the error occurred

Which tasks can be accomplished using the DBMS_LOB. SETOPTIONS procedure?()  A、 only encryption and compression settings for all SecureFile LOBsB、 only encryption and deduplication settings for only SecureFile CLOBsC、 deduplication,encryption,and compression settings for all SecureFile LOBsD、 deduplication,encryption,and compression settings only for SecureFile CLOBs

You are adatabase developer. You develop atask management application that connect stoa SQLServer 2008 database named TaskDB.Users logon to the application by using a SQLServer login. The application contains amodule named Task that assigns tasks tousers. Information about the setasks is stored in the Tasks table of the TaskDB data base. The Tasks table contains multiple columns. These include the Close Dateand Estimated Timecolumns. The application must meet the following security requirements: Users assigned toad atabase role named User 1 canupd ate all task information columns except the Close Date and the Estimated Time columns in the Tasks table. Administrative users assigned toad atabase role named Task_Admin canupd ateall task information in the Tasks table.You needto design a strategy to meet the security requirements. Which two actions should you perform?()A、Add the Task_Admin role to thedb_accessadmin fixed database role.B、Grant Update permissions on the Tasks table to the Task_Admin role.C、Grant Update permissions on the Tasks table to the User 1 role foreach column except the Close Dateand Estimated Time columns.D、Createan INSTEAD OF trigger on the Tasks Table. Use theIs_Member function toprevent the User 1 role from updating the Close Date and Estimated Time columns.

多选题You are adatabase developer. You develop atask management application that connect stoa SQLServer 2008 database named TaskDB.Users logon to the application by using a SQLServer login. The application contains amodule named Task that assigns tasks tousers. Information about the setasks is stored in the Tasks table of the TaskDB data base. The Tasks table contains multiple columns. These include the Close Dateand Estimated Timecolumns. The application must meet the following security requirements: Users assigned toad atabase role named User 1 canupd ate all task information columns except the Close Date and the Estimated Time columns in the Tasks table. Administrative users assigned toad atabase role named Task_Admin canupd ateall task information in the Tasks table.You needto design a strategy to meet the security requirements. Which two actions should you perform?()AAdd the Task_Admin role to thedb_accessadmin fixed database role.BGrant Update permissions on the Tasks table to the Task_Admin role.CGrant Update permissions on the Tasks table to the User 1 role foreach column except the Close Dateand Estimated Time columns.DCreatean INSTEAD OF trigger on the Tasks Table. Use theIs_Member function toprevent the User 1 role from updating the Close Date and Estimated Time columns.

多选题Which two are true concerning a multitenant container database with three pluggable database?()AAll administration tasks must be done to a specific pluggable database.BThe pluggable databases increase patching time.CThe pluggable databases reduce administration effort.DThe pluggable databases are patched together.EPluggable databases are only used for database consolidation.

多选题Which three statements correctly describe the features of the I/O calibration process?()AOnly one I/O calibration process can run at a time.BIt automates the resource allocation for the Automated Maintenance Tasks.CIt improves the performance of the performance-critical sessions while running.DIt can be used to estimate the maximum number of I/Os and maximum latency time for the system.EThe latency time is computed only when the TIMED_STATISTICS initialization parameter is set to TRUE.

单选题Which tasks can be accomplished using the DBMS_LOB. SETOPTIONS procedure?()A only encryption and compression settings for all SecureFile LOBsB only encryption and deduplication settings for only SecureFile CLOBsC deduplication,encryption,and compression settings for all SecureFile LOBsD deduplication,encryption,and compression settings only for SecureFile CLOBs