● Which of the following is indicative of negative float?A The late start date is earlier than the early start date.B The critical path supports the imposed end date.C The early finish date is equal to the late finish date.D When leads are employed in the schedule.E The project is sinking.

● Which of the following is indicative of negative float?

A The late start date is earlier than the early start date.

B The critical path supports the imposed end date.

C The early finish date is equal to the late finish date.

D When leads are employed in the schedule.

E The project is sinking.


相关考题:

Which of the following is indicative of negative float?A.The late start date is earlier than the early start date.B.The critical path supports the imposed end date.C.The early finish date is equal to the late finish date.D.When leads are employed in the schedule.E.The project is sinking.

The most frequently used construct in Precedent Diagramming Method is:A.Start to Start.B.Finish to Finish.C.Start to Finish.D.Finish to Start.E.Dummy activity.

The critical path is calculated byA.subtracting the end date of task one from the start date of task two.B.determining which tasks have the least amount of total slack.C.totaling the time for all activities.D.determining the shortest path through the network.E.Determining which tasks have the most slack

Which may be employed to shorten a schedule without changing the scope of the task?A.Fast tracking.B.CrashingC.Releasing resources earlier from tasks which were scheduled with a late start.D.Alter to task priorities.E.A or B

Free float is the amount of time that an activity may be delayed with out affecting the _____.A.Early start of the succeeding activities.B.Late start of the succeeding activities.C.Project finish.D.Cost of the project.E.None of the above.

The logical relationship that communicates a delay between the start/finish of one activity and the start/finish of another activity is referred to as:A.SlackB.Free float.C.Restricted float.D.Level float.E.Lag

Using the figure in the Special window, Activity "L" has an early start time of _____ weeks and an early finish time of _____ weeks.A . 11, 13B . 12, 14C . 13, 15D . 14, 16E . 15, 17

22 The logical relationship that communicates a delay between the start/finish of one activity and the start/finish of another activity is referred to as:A. SlackB. Free float.C. Restricted float.D. Level float.E. Lag

177 Which may be employed to shorten a schedule without changing the scope of the task?A. Fast tracking.B. CrashingC. Releasing resources earlier from tasks which were scheduled with a late start.D. Alter to task priorities.E. A or B

An activity has an early start date-of the lOth and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, ()what can be concluded about the activity?A.Total float for the activity is 9 days.B.The early finish date ofthe activity is the end ofthe day on the 14th.C.The late finish date is the 25th.D.The activity can be completed in 2 days ifthe resources devoted to it are doubled.

117 Using the figure in the Special window, Activity "L" has an early start time of _____ weeks and an early finish time of _____ weeks.A. 11, 13B. 12, 14C. 13, 15D. 14, 16E. 15, 17

● The most frequently used construct in Precedent Diagramming Method is:A Start to Start.B Finish to Finish.C Start to Finish.D Finish to Start.E Dummy activity.

● The critical path is calculated byA subtracting the end date of task one from the start date of task two.B determining which tasks have the least amount of total slack.C totaling the time for all activities.D determining the shortest path through the network.E Determining which tasks have the most slack

● Which may be employed to shorten a schedule without changing the scope of the task?A Fast tracking.B CrashingC Releasing resources earlier from tasks which were scheduled with a late start.D Alter to task priorities.E A or B

● Free float is the amount of time that an activity may be delayed with out affecting the _____.A Early start of the succeeding activities.B Late start of the succeeding activities.C Project finish.D Cost of the project.E None of the above.

● All of the following are categories of a milestone in a schedule except:A End date.B Contract dates.C Key events scheduled.D Imposed dates.E Task duration.

一旦为一个完整网络计算出活动历时,顺推法(forwardpass)与逆推法(backwardpass)就会提供() A.活动的总时差(float)B.只有最早开始(early start)与最晚开始时间(late Start)C.关键路径(critical path)D.A和C

听力原文:From an early date bankers have made a charge for the services which they provide for their customers.(9)A.From an early date the banker have charged a commission for their services.B.From an early date the banker has an obligation to serve the customers.C.From an early date the customers have charged a commission.D.From an early date the customer has an obligation to serve the banker.

Examine the description of the STUDENTS table:Which two aggregate functions are valid on the START_DATE column?() A. SUM(start_date)B. AVG(start_date)C. COUNT(start_date)D. AVG(start_date, end_date)E. MIN(start_date)F. MAXIMUM(start_date)

Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()A、 elapsed time since the target start date or completion date of previous work generated by PM  B、 difference between completion date of previous work and system date is equal to Lead Time  C、 elapsed time since the target start date or completion date of the latest work orders for the assetD、 metered equipment usage since the target start date or completion date of previous work generated by PME、 metered equipment usage since the target start date or completion date of the latest work order for the asset

一旦为一个完整网络计算出活动历时,顺推法(forwardpass)与逆推法(backwardpass)就会提供()A、活动的总时差(float)B、只有最早开始(early start)与最晚开始时间(late Start)C、关键路径(critical path)D、A和C

Examine the description of the STUDENTS table: STD_ID NUMBER(4) COURSE_ID VARCHARD2(10) START_DATE DATE END_DATE DATE Which two aggregate functions are valid on the START_DATE column?()A、SUM(start_date)B、AVG(start_date)C、COUNT(start_date)D、AVG(start_date, end_date)E、MIN(start_date)F、MAXIMUM(start_date)

如果INMS系统收到如下航行通告:(A0897/99NOTAMCA0896/99A)PAFA错误提示为()。A、Q-CODE Absent.B、Activity start date(field B)substituted with arrival date.C、Activity start date(field B)is missing.

单选题一旦为一个完整网络计算出活动历时,顺推法(forwardpass)与逆推法(backwardpass)就会提供()A活动的总时差(float)B只有最早开始(early start)与最晚开始时间(late Start)C关键路径(critical path)DA和C

单选题An activity has an early start date-of the lOth and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, ()what can be concluded about the activity?ATotal float for the activity is 9 days.BThe early finish date ofthe activity is the end ofthe day on the 14th.CThe late finish date is the 25th.DThe activity can be completed in 2 days ifthe resources devoted to it are doubled.

多选题Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()Aelapsed time since the target start date or completion date of previous work generated by PMBdifference between completion date of previous work and system date is equal to Lead TimeCelapsed time since the target start date or completion date of the latest work orders for the assetDmetered equipment usage since the target start date or completion date of previous work generated by PMEmetered equipment usage since the target start date or completion date of the latest work order for the asset

多选题Examine the description of the STUDENTS table: STD_ID NUMBER(4) COURSE_ID VARCHARD2(10) START_DATE DATE END_DATE DATE Which two aggregate functions are valid on the START_DATE column?()ASUM(start_date)BAVG(start_date)CCOUNT(start_date)DAVG(start_date, end_date)EMIN(start_date)FMAXIMUM(start_date)