相关考题:
As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:A.Insignificant.B.Reduced.C.Unchanged.D.Increased.E.Doubled.
122 The profitability and technical data studies are provided in report format to owners and funders for acceptance. This type of report, used to solicit funding, is referred to as a(n) _____.A. Project feasibility study.B. Economic evaluation analysis.C. Risk management manual.D. Prospectus.E. None of the above
17 The behavioral responsibilities of a project manager may also include dealing with:A. The publicB Regulatory personnelC. The legal environmentD. Environmental issuesE. All of the above
170 A variance envelope has been established on a project. The envelope goes from +-30% in RD to +-5% during manufacturing. The reason for the change in thickness of the envelope is because:A. The management reserve has been used up.B. The accuracy of the estimates in manufacturing are worse than the estimates in R D.C. Tighter controls are always needed as a project begins to wind down.D. Of the personal desires of the project sponsor.E. Of none of the above
199 Which of the following is closest to Juran's definition of Quality:A. conformance to requirements.B. fitness for use.C. continuous improvement.D. customer focus.E. All of the above
161 Project alternatives are examined during the _____ phase of the projectA. conceptualB. finishC. developmentD. implementationE. A and C
蒙特卡洛分析可以:A、 暗示项目总存在的风险B、 估算任务的长度C、 模拟任务发生的次序D、 向管理层证明需要增添人手