69 The extent of project management techniques to be used on a project are determined mainly by the _____ and _____ of the project.A. budget, scheduleB. quality requirements, scheduleC. size, type of industryD. nature, sizeE. project manager, sponsor

69 The extent of project management techniques to be used on a project are determined mainly by the _____ and _____ of the project.

A. budget, schedule

B. quality requirements, schedule

C. size, type of industry

D. nature, size

E. project manager, sponsor


相关考题:

The appointment or selection of a project sponsor is often based upon:AThe strategic importance of the projectBWho the customer isCWhether the organization is project or non-project-drivenDThe profitability of the projectEAll of the above

Communication in both project and non-project-driven organizations should occur in directions.A oneB twoC threeD fourE five

在Premiere中如何导入文件。() A.直接拖拽至projeCt窗口B.File-ExportC.双击projeCt窗口D.File-OpenprojeCt

以下关于Openstack租户Project说法错误的是()。 A、一个Project资源集合可供多个用户使用B、Project是Openstack各个服务中的一些可以访问的资源集合C、网络云各Project采用硬件共享,逻辑隔离的方式D、租户是一个有身份验证信息的API实体

Navisworks施工模拟的具体实施步骤是()。 A、给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画B、制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画C、在Animator中制定关键动画并插入到Timeliner中→给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画D、在Animator中制定关键动画并插入到Timeliner中→制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画

Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.A.IntegrationB.ConfigurationC.ScopeD.Requirement

中国青少年发展基金会在网上的主页地址是()。 A.http://project-hopE.cydF.gov.cnB.http://project-hopE.cydF.acC.http://project-hopE.cydF.edu.cnD.http://project-hopE.cydF.com.cn

执行菜单命令(),系统开始对项目进行编译,并生成信息报告A.project/compile PCB projectB.project/project optionC.Design/netlist/protelD.design/make project library

在对原理图进行电气规则检查前,可以()打开规则设置界面。A.design-Document OptionsB.Project-Project OptionsC.Tools-Schematic PreferencesD.Project-Configuration Manager

以下选项中哪个选项是根路径的表达方法?A.D:/Program Files/.Net/Project1B./root/.Net/Project1C../home/.Net/Project1D.file://D:/Program Files/.Net/Project1