17 All of the following statements about acceptance sampling are true except:A. Acceptance sampling plans are beneficial when the cost of inspection is high and the resulting loss of passing nonconforming units is not great.B. Acceptance sampling plans are necessary when destructive inspections are required.C. Acceptance sampling plans are never effective at rejecting nonconforming units as 100 percent inspection, even when the inspection process is very tedious.D. Acceptance sampling plans do not directly control the quality of a series of lots; they instead specify the risk of accepting lots of given quality.E. Acceptance sampling plans are not very effective for inspecting small lots of custom-made products

17 All of the following statements about acceptance sampling are true except:

A. Acceptance sampling plans are beneficial when the cost of inspection is high and the resulting loss of passing nonconforming units is not great.

B. Acceptance sampling plans are necessary when destructive inspections are required.

C. Acceptance sampling plans are never effective at rejecting nonconforming units as 100 percent inspection, even when the inspection process is very tedious.

D. Acceptance sampling plans do not directly control the quality of a series of lots; they instead specify the risk of accepting lots of given quality.

E. Acceptance sampling plans are not very effective for inspecting small lots of custom-made products


相关考题:

Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:A 1.4B 0.8C 0.2D 0.12E None of the above

A contract is legally binding and must comprise all but one of the following:A legal capacityB mutual assentC approved negotiationsD considerationE legality

55 The most precise or accurate estimate for determining project costs is the _____ estimate. A. Definitive.B. AnalogyC. BudgetD. Modified standards.E. Rule of thumb

28 The five major cost categories of quality are _____ .A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returnedC. Staffing, Training, reviews, equipment and rejected goodsD. sampling, design considerations, manufacturing considerations, training and rework.E. None of the above

在短期内租设备以完成特殊的项目工作是常用的方法。设备引起______ 除非出租人______。a. 无风险,滥用设备超出了正常使用b. 无风险,在使用期间对设备假定权利c. 有风险,确保损失或伤害d. 有风险,在使用期间拒绝承担义务e. 有风险,确保出租的成本

未分配的预算属于下列哪一个内容?A、管理储备金B、业绩衡量基准线C、客户和发起人管理总帐目表D、一般管理和行政费用