单选题Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()AShut down all client partitions before updating the VIO server.BDisconnect the client partitions from any IP networks before updating the VIO server.CUpdate the client partitions to the latest OS maintenance level before updating the VIO Server.DUpdate the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
单选题
Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()
A
Shut down all client partitions before updating the VIO server.
B
Disconnect the client partitions from any IP networks before updating the VIO server.
C
Update the client partitions to the latest OS maintenance level before updating the VIO Server.
D
Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
参考解析
解析:
暂无解析
相关考题:
An administrator is planning an upgrade of a major software package on an application server. The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A、 Identify necessary operating system updatesB、 Implement the changeC、 Document the changeD、 Schedule system down time
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()A、Design the solution and present it confidently so the customer does not question it.B、Design the solution and ensure the customer understands the unknowns with the new technology.C、Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.D、Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()A、Allocate the HBA to a client partition.B、Restart the Virtual I/O Server to detect the changes.C、Install the device driver for the DS8000 in each of the four AIX partitions.D、Allocate the HBA to the VIO server partition and install necessary drivers.
A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A、Etherchannel and trunkingB、Network Interface Backup and EtherchannelC、Shared Ethernet Adapter (SEA) Failover and EtherchannelD、Network Interface Backup and Shared Ethernet Adapter failover
A technician works for a company that has recently been affected by a virus. The virus entered the network by using port 6000. Port 6000 is used by an application located on a server. The technician has been asked to block this port on all servers and computers except for the one server which uses this port. Which of the following should the technician do?()A、Update the antivirus applicationB、Install critical update security patchesC、Adjust the software firewall settingsD、Replace the current antivirus program
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()A、Create all the partitions as AIX 5.2, each having two dedicated processors.B、Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.C、Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.D、Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
An administrator has a requirement to mirror the operating system on a VIO server. Which of the following IOS commands will achieve this?()A、 mirrorvgB、 iosmirrorC、 mirroriosD、 mkiosmirror
ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()A、Remove one application server partition and apply its CPU resources to the Web server.B、Reassign the CPU from one of the VIO servers and create the new partition.C、Add 0.6 CPU to one of the application servers and run the Web service with the application. D、Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()A、Create a VLAN between the web server and database server.B、Purchase APV and install the VIOS.C、Increase the priority of the Web server.D、Create separate LPARs for Web and database workloads.
Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()A、Shut down all client partitions before updating the VIO server.B、Disconnect the client partitions from any IP networks before updating the VIO server.C、Update the client partitions to the latest OS maintenance level before updating the VIO Server.D、Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()A、Configure the IP address through the first client partition.B、Configure the IP address through the ASMI menus.C、Configure the POWER5 service processor for DHCP from the HMC DHCP server.D、Configure the HMC to use the default IP address on the service processor when acquiring the managed server.
An administrator is trying to diagnose as to why a new VIO client (vio_client1) cannot see an allocated disk (hdisk4) from a VIO server (VIOS-A). The client virtual SCSI adapter has a slot ID of 5 and the corresponding VIO server virtual SCSI adapter has a slot ID of 3. The administrator checks the virtual SCSI configuration from the HMC using the following lshwres command. lshwres –r virtualio --rsubtype scsi -m 9117-570*65ABCDE --level lpar -F / lpar_name,slot_num,remote_lpar_name,remote_slot_num,backing_device VIOS A,5,vio_client2,2,hdisk3 VIOS-A,4,vio_client1,4,hdisk4 VIOS-A,3,vio_client1,6,hdisk5 VIOS-A,2,vio_client3,2,hdisk6 vio_client2,2,VIOS-A,5,hdisk0 vio_client1,4,VIOS-A,4,hdisk0 vio_client1,5,VIOS-A,3,null vio_client3,2,VIOS-A,2,hdisk0 From the output above, what is the most likely reason why the client cannot see the mapped storage?()A、 The hard disk has been inccorectly mapped on the VIO server.B、 The hard disk has been incorrectly addressed on the VIO client.C、 The client SCSI adapter has been mapped to the incorrect server SCSI adapter.D、 The server SCSI adapter has been mapped to the incorrect client server adapter.
单选题A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()AAllocate the HBA to a client partition.BRestart the Virtual I/O Server to detect the changes.CInstall the device driver for the DS8000 in each of the four AIX partitions.DAllocate the HBA to the VIO server partition and install necessary drivers.
单选题Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()ACreate a VLAN between the web server and database server.BPurchase APV and install the VIOS.CIncrease the priority of the Web server.DCreate separate LPARs for Web and database workloads.
单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()AOrder a POWER5 HMCBConnect to the existing HMCCInstall an 8-port asynchronous card in the managed server to connect to the existing HMCDInstall an additional network card to the existing HMC and connect to the POWER5 service processor
单选题A technician works for a company that has recently been affected by a virus. The virus entered the network by using port 6000. Port 6000 is used by an application located on a server. The technician has been asked to block this port on all servers and computers except for the one server which uses this port. Which of the following should the technician do?()AUpdate the antivirus applicationBInstall critical update security patchesCAdjust the software firewall settingsDReplace the current antivirus program
单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()ADesign the solution and present it confidently so the customer does not question it.BDesign the solution and ensure the customer understands the unknowns with the new technology.CExplain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.DExplain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
单选题Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()AShut down all client partitions before updating the VIO server.BDisconnect the client partitions from any IP networks before updating the VIO server.CUpdate the client partitions to the latest OS maintenance level before updating the VIO Server.DUpdate the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
单选题The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different LPARs. Who should the technical specialist contact to gain a definitive answer?()AIBM BPSOBIBM PartnerlineCIBM DistributorDIBM Supportline
单选题An administrator is planning an upgrade of a major software package on an application server. The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A Identify necessary operating system updatesB Implement the changeC Document the changeD Schedule system down time
单选题ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()AConfigure the IP address through the first client partition.BConfigure the IP address through the ASMI menus.CConfigure the POWER5 service processor for DHCP from the HMC DHCP server.DConfigure the HMC to use the default IP address on the service processor when acquiring the managed server.
单选题Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()ACreate a VLAN between the web server and database server.BPurchase APV and install the VIOS.CIncrease the priority of the Web server.DCreate separate LPARs for Web and database workloads.
单选题An administrator has a requirement to mirror the operating system on a VIO server. Which of the following IOS commands will achieve this?()A mirrorvgB iosmirrorC mirroriosD mkiosmirror
单选题ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()ARemove one application server partition and apply its CPU resources to the Web server.BReassign the CPU from one of the VIO servers and create the new partition.CAdd 0.6 CPU to one of the application servers and run the Web service with the application. DReassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()ACreate all the partitions as AIX 5.2, each having two dedicated processors.BPurchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.CSpecify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.DUse the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
单选题An administrator is trying to diagnose as to why a new VIO client (vio_client1) cannot see an allocated disk (hdisk4) from a VIO server (VIOS-A). The client virtual SCSI adapter has a slot ID of 5 and the corresponding VIO server virtual SCSI adapter has a slot ID of 3. The administrator checks the virtual SCSI configuration from the HMC using the following lshwres command. lshwres –r virtualio --rsubtype scsi -m 9117-570*65ABCDE --level lpar -F / lpar_name,slot_num,remote_lpar_name,remote_slot_num,backing_device VIOS A,5,vio_client2,2,hdisk3 VIOS-A,4,vio_client1,4,hdisk4 VIOS-A,3,vio_client1,6,hdisk5 VIOS-A,2,vio_client3,2,hdisk6 vio_client2,2,VIOS-A,5,hdisk0 vio_client1,4,VIOS-A,4,hdisk0 vio_client1,5,VIOS-A,3,null vio_client3,2,VIOS-A,2,hdisk0 From the output above, what is the most likely reason why the client cannot see the mapped storage?()A The hard disk has been inccorectly mapped on the VIO server.B The hard disk has been incorrectly addressed on the VIO client.C The client SCSI adapter has been mapped to the incorrect server SCSI adapter.D The server SCSI adapter has been mapped to the incorrect client server adapter.
单选题Company.com with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()AUse alt_disk_install to install AIX on all logical partitions.BConfigure the DVD as a desired resource on all partitions.CConfigure all resources as shared resources between all partitions.DCreate a separate NIM server to manage the installation of all partitions.