Due to slow backup response, an administrator installed a new driver for the SCSI card. After a server reboot the device is not working properly. Which of the following is the BEST course of action?()A、Reboot the server and restore files using ASR.B、In Device Manager, locate the device, and click Roll Back Driver at the driver tab.C、Restore the driver from the previous backup tape.D、Go to Device Manager, locate the device, and click Restore Previous Driver at the driver tab.
Due to slow backup response, an administrator installed a new driver for the SCSI card. After a server reboot the device is not working properly. Which of the following is the BEST course of action?()
- A、Reboot the server and restore files using ASR.
- B、In Device Manager, locate the device, and click Roll Back Driver at the driver tab.
- C、Restore the driver from the previous backup tape.
- D、Go to Device Manager, locate the device, and click Restore Previous Driver at the driver tab.
相关考题:
他的不合作态度使这个项目进展十分缓慢。() A.His incooperation makes the project progress very slowly.B.The project is making slow progress due to his lack of cooperation.C.The project makes less progress because of his uncooperation.D.The slowdown of the project is caused by his uncooprativeness.
---Dead slow ahead! ----Dead slow ahead! _______________A.Engine dead slow ahead!B.Engine dead ahead slow!C.Engine slow dead ahead!D.I do it right now
---Slow ahead! ---Slow ahead! _______________!A.Engine ahead slow!B.Engine slow ahead!C.Ahead engine slow!D.Yes, sir
---Slow ahead both engines! ---Slow ahead both engines! ___________________!A.Both engines slow aheadB.Engine slow ahead portC.Engine slow ahead starboardD.Engine both ahead
---_______________! ---Engine dead slow astern!A.Dead slow asternB.Engine slow asternC.Engine half asternD.Ready
The pilot needs the ship to go forward very slowly. The order should be _____.A.“Slow ahead”B.“Dead slow ahead”C.“Astern”D.“Dead slow astern”
Current liabilities are( )A. due, but not receivable for more than one yearB. due, but not payable for more than one yearC. due and receivable within one yearD. due and payable within one year
The ______ is used when a ship is moving forward at very slow speed due to minimal water flow over the rudder and the ship is not responding to helm.A.approach speedB.bow thrustC.transverse thrustD.kick ahead
---Dead slow ahead! ----Dead slow ahead! ()A、Engine dead slow ahead!B、Engine dead ahead slow!C、Engine slow dead ahead!D、I do it right now
The pilot needs the ship to go forward very slowly. The order should be ().A、“Slow ahead”B、“Dead slow ahead”C、“Astern”D、“Dead slow astern”
---Dead slow ahead! ---Reply: (). ---Report: Engine dead slow ahead.A、No problemB、OKC、Dead slow aheadD、Yes
Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?()A、Server forms condensationB、Server will not POSTC、Server’s services will not startD、Server response times are slow due to temperature change
A customer’s server is experiencing slow application response due to lack of processor power. In which one of the following systems would the addition of the Expand On Demand processor upgrade feature benefit future expansion?()A、An x255 with 4 processorsB、An x365 with 4 processorsC、An x445 with 4 processorsD、An x445 with 32 processors
单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()AThe slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaBThe vessel can probably be saved if further flooding can be stoppedCThe vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectDThe vessel will suddenly flop to the same or greater angle of list on the other side and may capsize
单选题---Dead slow ahead! ---Reply: (). ---Report: Engine dead slow ahead.ANo problemBOKCDead slow aheadDYes
单选题The pilot needs the ship to go forward very slowly. The order should be ().A“Slow ahead”B“Dead slow ahead”C“Astern”D“Dead slow astern”
单选题Medium speed engines have a () power to weight ratio than the slow speed two strokes, but due to the higher speeds tend to have () maintenance intervals.Ahigher;reducedBhigher;increasedClower;reducedDlower;increased
单选题---Slow ahead! ---Slow ahead! ()!AEngine ahead slow!BEngine slow ahead!CAhead engine slow!DYes, sir
单选题---()! ---Engine dead slow astern!ADead slow asternBEngine slow asternCEngine half asternDReady
单选题---Slow ahead both engines! ---Slow ahead both engines! ()!ABoth engines slow aheadBEngine slow ahead portCEngine slow ahead starboardDEngine both ahead
单选题NEWS BROADCAST 3 Questions 9 and 10 are based on the following news. At the end of the news item, you will be given 20 seconds to answer the questions. Now listen to the news.The process of rescuing trapped miners is slow due toAthe difficulties of getting down into the coal mine.Bthe great casualties of the mining accident.Cthe risk of catching infectious disease.Dthe continuous blasts inside the coal mine.
单选题A possible cause for an individual piston to knock when at TDC on a slow-speed, two-stroke/cycle main propulsion diesel engine could be due to ()Aearly fuel injectionBexcessive bearing play within the running gearCoverloading of the cylinderDall of the above
单选题“One or two free admission days at slow times.”“Slow times”here means _____.Abusiness is developingBbusiness is badCstrolling is slowDpeople are slow in learning