设备闸门 equipment hatch

设备闸门 equipment hatch


相关考题:

X.25协议规定了以【 】工作的用户数据终端设备(Date Terminal Equipment, DTE)与通信子网的数据电路端接设备(Date Circuit-terminal Equipment, DCE)之间的接口标准。

______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

闸门漏水多是由于闸门()破坏、闸门不能落到底、闸门漫溢等所致。A、混凝土B、钢筋C、止水D、启闭设备

2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.

电气设备(electrical equipment)

OEE英文全称是什么?()A、Overall Equipment Efficiency全局设备效率B、Opto-Electronic Element光电元器件C、Overall Equipment Environment全局设备环境D、Operating Equipment Effectivity设备可操作性

燃料处理设备(fuel treatment equipment)

启动设备(starting equipment)

救生设备()A、life-jacketB、lifeboatC、lifebuoyD、life-saving equipment

Close the (), please.A、hatch coamingsB、hatch coversC、hatch beamsD、hatch openings

设备交接单(Equipment-Interchange-Receipt,简称EIR、E/R)

The control of communications test equipment should be clearly addressed by security policy for which of the following reasons?通信测试设备的控制应该通过安全策略明确的原因是什么?()A、Teste quipment can be used to browse information passing on anetwork.测试设备可以用于浏览在网络上传递的信息B、Test equipment is difficult to replace if lost or stolen.测试设备如果丢失或被盗很难替换C、Test equipment is easily damaged.测试设备很容易被损坏D、Test equipment must always be available for the maintenance personnel.测试设备对于维修人员必须是永远可用的

注水井井口设备的结构由套管卡箍、()、套管闸门、()、生产闸门和测试闸门组成。A、总闸门,油套管连通闸门B、总闸门,油嘴C、油管线,油套管连通闸门D、油嘴,油管线

在连接清单中EQUIPMENT表示()A、连接设备的位置号B、连接设备的设备号C、线束号

单选题请把吊杆甩到舱口上方好吗?()AWill you please swing the heavy derrick over the hatch?BWill you please swing the derrick over the hatch?CWill you please lower the derrick over the hatch?DWill you please top the heavy derrick over the hatch?

单选题Tell me(),please.Awhich hatch will be loaded firstBwill which hatch be loaded firstCwill hatch of which be loaded firstDfirst will which hatch be loaded

单选题我船配有自动舱盖。()AOur ship is equipped with automatic hatch covers.BOur ship is equipped with folding-type hatch covers.COur ship is equipped with side-rolling hatch covers.DOur ship is equipped with rolling-type hatch covers.

单选题Tonnage openings must be closed by means of().APress boardBSteel hatch boardsCSteel platesDWooden hatch boards

单选题The()(侧滚式舱盖) runs along the guide rail.Arolling type hatch coverBside-rolling hatch coverCfolding type hatch coverDautomatic hatch cover

单选题装卸货之前,打开舱盖。()AAfter loading and discharging, hatch covers will be opened.BAfter loading and discharging, hatch covers will be closed.CBefore loading and discharging, hatch covers will be opened.DBefore loading and discharging, hatch covers will be closed.

单选题每一个舱盖由两个或更多的盖板组成。()AEach hatch consists of two panels.BEach hatch cover consists of two panels.CEach hatch consists of two or more panels.DEach hatch cover consists of two or more panels.

名词解释题电气设备(electrical equipment)

名词解释题Ⅱ类设备(class Ⅱ equipment)

名词解释题0类设备(class 0 equipment)

单选题()is known as a long hatch during loading operation.AThe largest hatch of a shipBThe hatch that is double riggedCThe hatch where a disproportionate amount of cargo is atowedDThe hatch where the most cargo is stowed

单选题The()(折叠式舱盖) can fold slowly.Arolling type hatch coverBside-rolling hatch coverCfolding type hatch coverDautomatic hatch cover

单选题闸门漏水多是由于闸门()破坏、闸门不能落到底、闸门漫溢等所致。A混凝土B钢筋C止水D启闭设备