单选题A 15-ton bulldozer employed caused the bilge limber boards on both sides().Aserious damagedBseriously damageCserious damageDseriously damaged
单选题
A 15-ton bulldozer employed caused the bilge limber boards on both sides().
A
serious damaged
B
seriously damage
C
serious damage
D
seriously damaged
参考解析
解析:
暂无解析
相关考题:
The physical components of a computer are collectively called () . A、hardwareB、softwareC、memoryD、boards
It is the management and boards of the banks that must recreate customer and ________value. A、shareholderB、stakeholderC、goodsD、seller
()must be familiar with these requirements of bilge water management, particularly those directly involved with such operations involving bilge water. A.All responsible personnelB.All the crew served in engine roomC.The masterD.The chief engineer
Accidental flooding of the engine room bilges by the bilge main is prevented by( ).A.stop-check valves installed in the bilge suction manifoldsB.using a positive displacement reciprocating bilge pumpC.installing educators in all bilge rose boxesD.installing a swing check before each bilge valve
Limber is a term associated with ______.A.Emergency gearB.DrainageC.Deck cargo storageD.Securing gear
When using the term limber system one is referring to a ______.A.Cleaning systemB.Drainage systemC.Strengthening systemD.Weight reduction system
What is the purpose of limber holes ________.A.To allow for air circulationB.To allow for stress and strain in rough watersC.To allow water in the boat to drain overboardD.To allow water in the bilge to get to the boat drain
Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo
There currently seems to be a large____between the number of people employed in service industries, and those employed in the primary sector.A.differentB.differentialC.discriminationD.discrepancy
The () will have a rotating honorary chairman.A、Board of DirectorsB、Boards of DirectorC、boards of directorD、Board Directors
单选题The bilge system has been performing well; however, the aft starboard engine room bilgewell suddenly fails to be pumped outWhich of the following should be done first to determine the cause?()AOpen the bilge pump for inspectionBRemove each of the manifold valvesCRemove only the manifold valve to the affected bilge-wellDAttempt to pump out another bilge well to determine if the entire system is affected
单选题An emergency bilge pumping system is provided and should be () of the main bilge pumping system, according to the SOLAS 74 Convention.AdependentBin dependentCin seriesDin parallel
单选题Before loading bulk grain,bilge wells must be covered to().Aadd strength to the bilge well strainerBpermit rapid flow of water to the bilge wellsCprevent cargo sifting into the bilge wellsDprevent oil,water,or other liquid from reaching the cargo
单选题Accidental flooding of the engine room bilges by the bilge main is prevented by ().Astop-check valves installed in the bilge manifoldsBusing a positive displacement reciprocating bilge pumpCinstalling eductors in all bilge rose boxesDinstalling a swing check before each bilge valve
单选题The emergency bilge suction or bilge () is used to prevent flooding of the ship.Ainjection valveBrelief valveCdischarge valveDinlet filter
单选题The emergency bilge suction or bilge injection valve is used to prevent () of the ship.AproceedingBoverloadingCcollisionDflooding
单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()Afailure of the proper operation of emergency generatorBinsulation of piping including exhaust pipes in engine room contaminated by oilCimproper operation of bilge of bilge of bilge pumping arrangementsDdamaged sanitary pump
单选题When using the term limber system one is referring to a().ACleaning systemBDrainage systemCStrengthening systemDWeight reduction system
单选题An oil water monitor is required in order to measure ().Athe oil content in waterBthe water content in fuel oilCthe water level in bilge wellDthe oil level in bilge well
单选题Limber is a term associated with().Aemergency gearBdrainageCdeck cargo storageDsecuring gear
单选题If one of the bilge system manifold valves does not properly seat, the ()Abilge well connected to that valve, plus the second bilge well being pumped will be completely emptiedBbilge system will lose vacuum and prevent the other bilges from being pumped outCbilge well aft connected to that valve will siphon its contents to the forward bilge wellsDdischarge pressure will be too high
单选题You are unable to pump out the aft starboard engine room bilge well that is fouled, with one foot of water over the top of the bilge well, what actionshould be carried out?()ASend the wiper into the well with only a scoop and pailBRemove the bilge manifold valve and attempt to back flush the lineCSimultaneously operate all available bilge pumpsDIt is only necessary to transfer half the contents of a drum of degreaser into the bilge well
单选题When discharging bilge water, which criteria must be observed?()AThe requirement for the oil content of bilge water discharged is 15 ppmBNo discharge in sensitive watersCAny discharge in sensitive watersDInternational, national or local requirements have to be observed
单选题If water is rising in the bilge of a lifeboat,you should FIRST().Aabandon the survival craftBcheck for cracks in the hullCshift all personnel to the sternDcheck the bilge drain plug