名词解释题供水性 water supplying capability

名词解释题
供水性 water supplying capability

参考解析

解析: 暂无解析

相关考题:

WhichoneisNOTincludedinnursingjobsforpatients’health?() A.Supplying3mealsB.GivingmedicationsC.MouthtoiletD.X-raycheck

Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?A.Baffle plates that have been bent during prior removalB.Leaks m the cooler tube nestC.Operating the engine while maintaining a high sea water outlet temperatureD.A punctured sea water strainer supplying cooling water to the heat exchanger

The visitors are impressed by the hospitality of the local people.A.friendlinessB.banquetC.presentD.capability

The most serious effect of air trapped in a diesel engine jacket water cooling system is that it ______.A.Causes colloid suspension in the cooling waterB.Reduces the capability of the lubrication systemC.Can form pockets which block the flow of coolant through the systemD.Leads to the scuffing of cylinder walls

A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.A.Fire hose might be damaged by cargo operationsB.Vessel is in portC.Fire-main system is not chargedD.Fire pumps are used for purposes other than supplying water to the fire main

用户变更是指供水公司与用户在签订()履约过程中,或虽未与用户签订合同,但已经发生的供用水关系中,因用水一方的名称、用水性质、用户水表、销户等原因导致的供用水关系具体内容发生了变更。A、《用水性质变更申请表》B、《供用水合同》C、《新增用户申请表》D、《用水性质变更审批表》

供水性 water supplying capability

CID是()的缩写。A、Capability IED DescriptionB、Current IED DescriptionC、Capability Intelligen tDeviceD、configured IED Description

ICD是()的缩写。A、lED Capability DescriptionB、IED Current DescriptionC、Intelligent Capability DeviceD、IED Capability Device

单选题Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?()ABaffle plates that have been bent during prior removalBLeaks in the cooler tube nestCOperating the engine while maintaining a high sea water outlet temperatureDA punctured sea water strainer supplying cooling water to the heat exchanger

单选题Which option best describes the features of the Personal Worklist page, as compared with AdvancedWorklist?()Aprovides an overview of notificationsBprovides the capability to administer notificationsCprovides the most detailed options for searching workflowDprovides the most detailed options for searching workflow, and provides the capability to administer notifications

单选题Why the cooling water of the diesel engine should be treated? Because the()ACooling water is alkalescenceBcooling water is acidityCcooling water has salinityDcooling water has impurity

单选题The straight stream capability of an all-purpose nozzle is used in fighting a class A fire to().Ashield fire fighters from radiant heatBbreak up burning materialCget the most water possible on the fireDdrive heat and smoke ahead of the fire fighters

单选题用户变更是指供水公司与用户在签订()履约过程中,或虽未与用户签订合同,但已经发生的供用水关系中,因用水一方的名称、用水性质、用户水表、销户等原因导致的供用水关系具体内容发生了变更。A《用水性质变更申请表》B《供用水合同》C《新增用户申请表》D《用水性质变更审批表》

单选题The most serious effect of air trapped in a diesel engine jacket water cooling system is that it().Acauses colloid suspension in the cooling waterBreduces the capability of the lubrication systemCcan form pockets which block the flow of coolant through the systemDleads to the scuffing of cylinder walls

单选题()belongs to emergency power supplying equipments.ANavigation lampBWindlassCMain sea water pumpDCompressor

单选题Supposing there is a water container. The taller the container, _____at the bottom.Agreater will the water pressure beBthe water pressure will be greaterCthe greater will be the water pressureDgreater the water pressure will be

单选题Which of the following statements is correct concerning diesel engine cooling water systems?()AEach engine must have its own engine driven cooling water pump capable of providing cooling for all ranges of operationBpropulsion engines with bores exceeding 200 mm are to be fitted with a means to display the cooling water temperature of each cylinderCAt least two independent sea suctions are to be provided for supplying water to the engine jackets or to the heat exchangersDSuitable strain are to be fitted between the circulating pumps and heat exchangers when sea water is used for direct cooling

单选题()belongs to emergency power supplying equipments.AEmergency fire pumpBWindlassCMain sea water pumpDFresh water pump

单选题A () boiler is an auxiliary boiler sometimes included in a steamships installation for supplying steam to auxiliaries in port.AmonkeyBdonkeyCwaste heatDmain

单选题When sailing in cold zones, the() should be drained of water.Athe ventilation pipeBthe water line for fire fighting on the deckCthe fuel oil lineDthe water supplying line in bath room

单选题A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the().Afire hose might be damaged by cargo operationsBvessel is in portCfire-main system is not chargedDfire pumps are used for purposes other than supplying water to the fire main

单选题Diesel engine automated control systems may utilize sensing devices of dual function, with sensing ranges providing both alarm and engine shut down capability.Which of the key points would only require an alarm sensor?()ALube oil pressure and temperatureBjacket water pressure and temperatureCEngine over-speedDLube oil sump level

单选题The deep-sea listening system makes use of ______.Athe sophisticated technology of focusing sounds under waterBthe capability of sound to travel at high speedCthe unique property of layers of ocean water in transmitting soundDlow-frequency sounds traveling across different layers of water

单选题()belongs to emergency power supplying equipments.Aargo winchBWindlassCSteering gearDAir compressor

单选题Diesel engines are started by supplying () into the cylinders in the appropriate sequence for the required direction.Afuel oilBdiesel oilCcompressed airDjacket water

单选题When the incinerator is stopped, which of the following is wrong?()AAfter stopping supplying sludge oil, the value and pipe should be flushed by flushed by diesel oil and the incinerator continue burning for 10 minutesBClose auxiliary burner firstly and then close main burnerCAfter stopping fuel, restoring the position of main fuel supply valveDStop blower as soon as stopping supplying fuel oil

名词解释题供水性 water supplying capability