单选题Megatronix has conducted a new customer ______ survey.AsatisfiedBsatisfactionCsatisfyingDsatisfactory

单选题
Megatronix has conducted a new customer ______ survey.
A

satisfied

B

satisfaction

C

satisfying

D

satisfactory


参考解析

解析:
句意:Megatronix做了一次新的顾客满意度调查。此处意为“满意”,空格处与前后的名词构成复合名词customer satisfaction survey,意为“顾客满意度调查”。填入形容词与句意不符。conduct进行;做;处理。satisfaction满意。satisfied满意的,满足的。satisfactory令人满意的。

相关考题:

A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?() A. Perform a full system backup.B. Follow up with the customer, verifying satisfaction.C. Ask their manager to contact the customer.D. Perform a complimentary virus scan.

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?() A. capacity above 500 TBB. first in customer locationC. a new model has been releasedD. sold without implementation service

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A、capacity above 500 TBB、first in customer locationC、a new model has been releasedD、sold without implementation service

A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()A、the internal interfaceB、the external interfaceC、the management interfaceD、the console interface

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

A customer has installed a new computer on their network. They can print to the printer but the option for duplex printing is not available. All other computers have the option. Which of the following is the cause of the problem?()A、The new computer is printing to the wrong IP address.B、The new computer is using the wrong protocol.C、The driver port is not setup correctly.D、The option has not been selected on the driver.

A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()A、Suggest a cloud networkB、Direct the customer to redbooks and white papers on FC technologiesC、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transferD、Switch project to iSCSI

A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()A、Add External Storage via EXP3000B、Replace current storage with more dense drivesC、Add External Storage via SAND、Add storage expansion blade

An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

A solution provider has proposed a pSeries solution to a new customer.  The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation.  The solution provider has not been able to get a clear understanding as to how the customer will backup the system.  What would be the most appropriate action to address the risks with this solution?()A、Sell SysbackB、Conduct a SARC、Sell SupportlineD、Provide a project timeline

A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager

A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900.  They have encountered hangs lasting over a minute on their new system during application load testing.  They called the pSeries technical specialist for advice.  Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()A、Are there any errors in the error log? Do they indicate any hardware or software errors?B、Has performance data been collected? What do the results show in terms of I/O statistics?C、Has performance data been collected? What do the results show in terms of CPU utilization? D、What type of SAN switch is the customer using? What are the microcode levels on the switch?

单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()AThe EMC storage specialist has not participated in the TDA meetingBThe FC HBAs are 4 Gbps technologyCThe Technical and Delivery Assessment review actions were not executedDThe customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

单选题A customer has installed a new computer on their network. They can print to the printer but the option for duplex printing is not available. All other computers have the option. Which of the following is the cause of the problem?()AThe new computer is printing to the wrong IP address.BThe new computer is using the wrong protocol.CThe driver port is not setup correctly.DThe option has not been selected on the driver.

单选题A technician has just finished installing a new NIC into a customer’s desktop. Which of thefollowing should the technician do NEXT?()APerform a full system backup.BFollow up with the customer, verifying satisfaction.CAsk their manager to contact the customer.DPerform a complimentary virus scan.

单选题Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server.  Which of the following options would you use? ()ARemote Supervisor Adapter II (RSA II Slimline)BManagement Module, which comes standard on the BladeCenterCAcoustic Attenuation ModuleDEthernet NICs

单选题An International Oil Pollution Prevention Certificate (IOPP) for a "new" vessel ceases to be valid if ().Ait exceeds 3 years from date of issueBan alteration approved by the Captain of the Port is madeCan intermediate survey has not be conducted within 12 months from the date that the IOPP was issuedDthe vessel is transferred to the flag of another country

单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()Acapacity above 500 TBBfirst in customer locationCa new model has been releasedDsold without implementation service

单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()AContact the IBM FTSS to replace the driveBContact the IBM CSR or SSR to replace the driveCOrder a replacement driveDContact IBM Service

问答题Practice 3  Discussion—about 5 minutes  In this part of the test you are given a discussion topic. You have 30 seconds to look at the task promptly, an example of which is below, and then about three minutes to discuss the topic with your partner. After that the examiner will ask you more questions related to the topic.  For two candidates  Satisfaction Survey  The company you work for has conducted a satisfaction survey. We all know customer satisfaction is essential to the survival of our businesses.  You have been asked to find out whether customers are satisfied.  Discuss the situation together, and decide:  ● how to find out whether the customers are satisfied  ● what to ask in a customer satisfaction survey.

单选题A pharmaceutical company has a requirement for 8.5 TB of usable storage for a new data center. The customer has multiple host applications running on Solaris, Windows 2003, HP-U/X, Linux, and IBM System i platforms.  Which IBM System Storage DS8000 volume configuration providesthe best performance and highest availability for this customer()ARAID 3BRAID 5CRAID 6DRAID 10

单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined.  The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()ADesign the solution and present it confidently so the customer does not question it.BDesign the solution and ensure the customer understands the unknowns with the new technology.CExplain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.DExplain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.

单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()AThe customer used their IBM Customer NumberBThe customer has activated their base warrantyCThe customer purchased Remote Technical Support ServicepacDThe customer escalated the issue to the Duty Manager

单选题Ms. Ravi has already conducted market research ______ two new products.AaroundBfromConDnear

单选题The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM.  The customer is planning to implement their first ERP application.  This new application will be critical to running their business.  The customer has only a competitor’s UNIX systemcurrently installed.  They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()AI/T services and education to help with the implementation of the hardware and softwareBA Supportline specialist to work directly with the customer to manage any issues that ariseCThe services required to move the currently installed applications from the competitor’s systems to the IBM systemsDA slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution

单选题Megatronix has conducted a new customer ______ survey.AsatisfiedBsatisfactionCsatisfyingDsatisfactory