单选题A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()ACoD and PCI hot-plugBDLPAR and Active Memory SharingCHot node add and hot node repairDD.ynamic processor failure and processor instruction retry
单选题
A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()
A
CoD and PCI hot-plug
B
DLPAR and Active Memory Sharing
C
Hot node add and hot node repair
D
D.ynamic processor failure and processor instruction retry
参考解析
解析:
暂无解析
相关考题:
In order to link data centers, a customer is evaluating the installation of fiber optic cable between buildings that are 400 meters apart. The installation will require multiple patch panels and cables.Which of the following is the most critical factor to consider for this installation?()A. I/O rateB. bandwidthC. signal lossD. Dense Wavelength Division Multiplexing (DWDM)
A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC, HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems. Which tool compares performance()A、Capacity MagicB、eConfigC、TPC for DiskD、Disk Magic
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A、A second IVE adapterB、A second processor cardC、PowerVM Enterprise EditionD、An additional cable-management arm
The advantages of () include better accuracy, customer service, precise control of transportation and data analysis capabilities to anyone capable of using the virtual database.A、GPSB、Information systemC、Virtual warehousingD、Communication system
Enterprise Asset Management packages offer a wide range of capabilities. Which three areas of capability are covered by IBM Maximo Asset Management solutions?()A、work ordersB、human resourcesC、inventory controlD、preventive maintenanceE、facilities schedule managementF、customer relationship management
During Company.com planning session,Company.com presents the details of the current Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required. Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A、 4B、 5C、 6D、 8
A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility. What other product is required to accomplish this objective? ()A、 HACMP for AIXB、 PowerVM Enterprise EditionC、 IBM Management Edition for AIXD、 Workload Partition Manager for AIX
A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A、IBM i EditionB、Express EditionC、Standard EditionD、Enterprise Edition
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()A、PowerVM offers partition mobility.B、PowerVM can virtualize network and SAN resources.C、PowerVM supports multiple operating systems running concurrently.D、PowerVM allows an LPAR to use activated cores and memory without limitation.
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()A、TSMB、PSSPC、WebSMD、LoadLeveler
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A、Configure the PCIe SSD adapter and drive modules as a JBODB、Configure a pair of mirrored PCIe SSD adapters and drive modulesC、Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD、Configure the PCIe SSD adapter and drive modules in a RAID-5 array
A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools. What is the minimum PowerVM Edition which provides this feature?()A、BasicB、ExpressC、StandardD、Enterprise
Which of the following virtualization options are unique to AIX and PowerVM compared to other UNIX based offerings?()A、Software virtualization through PowerVM and hardware virtualization through IBM Systems Director.B、Hardware virtualization through Workload Partitions (WPARS) and software virtualization through PowerVM.C、Software virtualization through Workload Partitions (WPARS) and hardware virtualization through PowerVM.D、Hardware virtualization through Workload Partitions (WPARS) and software virtualization through IBM Systems Director.
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A、PowerVM Standard EditionB、VMControl Standard EditionC、Hardware Management ConsoleD、IBM Systems Director Standard Edition
A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()A、Active Energy ManagerB、PowerVM Energy ManagerC、Power and Energy ManagerD、Thermal and Energy Manager
A customer is considering procuring HP servers with Virtual Server Environment (VSE) to consolidate servers and dynamically move resources between partitions. How can the technical sales representative position PowerVM as the solution to virtualize this server environment?()A、PowerVM supports shared servers compared to VSEB、PowerVM supports shared processors and memory compared to VSEC、PowerVM supports shared processors, memory and I/O compared to VSED、PowerVM supports DLPAR without a reboot and supports dedicated I/O compared to VSE
A customer needs to test the failover capabilities of their cluster. Which of the following AIX commands, whenissued from the command line, will simulate a node crash and cause the cluster resource group running onthat server to fail over to another node?()A、clstopB、halt -qC、shutdown -FD、stopsrc -s cluster
单选题A customer recently acquired two Power servers and plans to implement AIX 6.1 and Live Application Mobility. What other product is required to accomplish this objective? ()A HACMP for AIXB PowerVM Enterprise EditionC IBM Management Edition for AIXD Workload Partition Manager for AIX
单选题A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()AEtherchannel and trunkingBNetwork Interface Backup and EtherchannelCShared Ethernet Adapter (SEA) Failover and EtherchannelDNetwork Interface Backup and Shared Ethernet Adapter failover
单选题During Company.com planning session,Company.com presents the details of the current Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required. Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A 4B 5C 6D 8
单选题A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()ACoD and PCI hot-plugBDLPAR and Active Memory SharingCHot node add and hot node repairDD.ynamic processor failure and processor instruction retry
单选题In order to link data centers, a customer is evaluating the installation of fiber optic cable between buildings that are 400 meters apart. The installation will require multiple patch panels and cables. Which of the following is the most critical factor to consider for this installation?()AI/O rateBbandwidthCsignal lossDDense Wavelength Division Multiplexing (DWDM)
问答题The high performance innovators depended on different models and approaches to outperform their competitors. In many cases, the company’s success is attributed to a distinctive skill. Google, for example, is known for generating new ideas with blistering speed. Toyota excels at developing its products and processes far more efficiency and effectively than most other companies. And Apple is noted for its well-honed capabilities in project selection and customer understanding. The most successful companies exhibited strong capabilities across four key areas: ideation, project selection, product development, and commercialization.
单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provisioning system. Which of the following methods can achieve this?()AUseServerGuide to install Windows 2003rchase PowerVM Standard Edition for the entire systemBInstall Windows 2003 using the F6 supply Mass Storage Controller optionCReplace Customer’s deployment solution with Tivoli Provisioning Manager for OS Deployment Director EditionDDeploy Customer’s existing image and useUXSPi to update IBM specific drivers
单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A PowerVM Lx86B PowerVM Express EditionC PowerVM Standard EditionD PowerVM Enterprise Edition
单选题A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()APowerVM offers partition mobility.BPowerVM can virtualize network and SAN resources.CPowerVM supports multiple operating systems running concurrently.DPowerVM allows an LPAR to use activated cores and memory without limitation.