单选题After successful commissioning, the()will permit the SES access to system.AINMARSATBIMOCMSCDCES

单选题
After successful commissioning, the()will permit the SES access to system.
A

INMARSAT

B

IMO

C

MSC

D

CES


参考解析

解析: 暂无解析

相关考题:

Mike is () Johnson. A、as successful a manager asB、as a successful managerC、as a manager successful asD、as successful manager as

It was three years after the first satellite launching that a (spaceship) containing a man made a successful flight.选择能代替括号里的选项A、a space stationB、a space vehicleC、a space rocketD、a Spacelab

After being launched from a vessel, totally enclosed survival craft which have been afloat over a long period require ______.A.frequent opening of hatches to permit entry of fresh airB.regular checks of bilge levelsC.use of ear plugs to dampen engine noiseD.frequent flushing of the water spray system with fresh water

《船舶电报签收簿》包括对窄带直接印字电报、卫通电传和传真来报。在“ 电报种类”栏中,规定卫通电传和传真分别用_____表示。A.NBDP和N/WB.SES TLX和SES TELC.SES TLX和SES FAXD.CES TLX和CES FAX

如下图所示,在Excel中单击单元格F2,欲求出表中所列6名学生的总成绩排名,应输入的公式是( )A.=RANK(E1,SES1:SES7)B.=RANK(E1,SES2:SES7)C.=RANK(F2,SES1:SES7)D.=RANK(E2,SES2:$ES7)

无线电台日志中,“通信方式”栏,卫通传真应以()字样表示。A、SSBB、SES TLXC、SES TELD、SES FAX

在SDH网管性能管理中,当出现10个SES后,监视的ES、SES等性能计数器停止计数。

《船舶电报签收簿》包括对窄带直接印字电报、卫通电传和传真来报。在“电报种类”栏中,规定卫通电传和传真分别用()表示。A、NBDP和N/WB、SES TLX和SES TELC、SES TLX和SES FAXD、CES TLX和CES FAX

调试 commissioning

()能看出commissioning失败。A、export logs/alarmsB、snapshot

写出完成如下要求的指令,但是不能改变未涉及位的内容。把ACC.3, ACC.4,ACC.5和 ACC.6置“1”。

A Windows OS has failed to load after a successful power on self test. Which of the following steps will help troubleshoot the problem?()A、Change the time and date in the BIOS.B、Replace the keyboard.C、Check for media in the optical drive.D、Add more RAM.

Publishing was successful but the store won’t launch.  Which log should be checked for errors after tracing has been enabled?()A、trace.logB、message.txtC、activity.logD、trace.txtE、SystemOut.log

An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()A、Use the clstat command and verify the cluster is in a stable stateB、After each node is upgraded, run a verification and synchronizationC、After all nodes are upgraded, run a verification and synchronizationD、Take a snapshot of each node and verify the configuration is the same

单选题II a réussi à la force du poignet.Aavec du pouvoirBpar son talentCavec ses forcesDpar ses efforts

单选题A large check processing company is quite impressed with the ingestion performance of a VTL. After calculating their nightly backup requirements it was determined that the restore performance of the VTL was significantly less than the backup performance. Which of the following business requirements should the customer revisit to ensure a successful implementation?()ARPOBRTOCbackup windowDdeduplication ratio

单选题After being launched from a vessel,totally enclosed survival craft which have been afloat over a long period require().Afrequent opening of hatches to permit entry of fresh airBregular checks of bilge levelsCuse of ear plugs to dampen engine noiseDfrequent flushing of the water spray system with fresh water

单选题After has permit the commissioning, the()will permit the SES access to system.AINMARSATBIMOCMSCDCES

单选题Which of the following procedures should be carried out to permit the use of a crosshead engine with an inoperable after-cooler?()ABypass the after-cooler to operate at speedBRun at reduced speed until the cooler can be repaired or renewedCSwitch to diesel fuel and run at full speedDNothing need to be done due to the low heating value of heavy fuel

单选题Which components are needed for successful and most efficient recovery.()A The backup RB3 and the current online redo log filesB the backup RB2 and the archived redo log files after the log sequence number 15622C Backup R81 and the archived redo log hies after the log sequence number 12871D The backup RB3 and the archived redo log files after the log sequence number 16721

单选题After successful commissioning , the()will permit the SES access to system.AINMARSATBIMOCMSCDCES

单选题Who has permit the SES enter the system after successful commissioning?()ANetworkBThe CES preferred by the applicantCINMARSATDThe SES itself

单选题After applying a new ACL on a device, its CPU utilization rose significantly and many messages starting with "%SEC-6-IPACCESSLOG" appeared on the Syslog server. What can be done to resolve this situation?()AIncrease memory allocation for ACLs.BRemove all entries from the ACL and use a single permit ip any any statement.CRemove the log keyword from each ACL entry.DReboot the device after the ACL has been applied.

单选题下列选项中哪一条可以准确的匹配并代替以下四条访问控制列表() (1):access-list 10 permit172.29.16.00.0.0.255 (2):access-list 10 permit172.29.17.00.0.0.255 (3):access-lis t10 permit172.29.18.00.0.0.255 (4):access-list 10 permit172.29.19.00.0.0.255Aaccess-list 10 permit 172.29.16.00.0.0.255Baccess-list 10 permit 172.29.16.00.0.1.255Caccess-list 10 permit 172.29.16.00.0.3.255Daccess-list 10 permit 172.29.16.00.0.15.255Eaccess-list 10 permit 172.29.16.0255.255.252.0

单选题()能看出commissioning失败。Aexport logs/alarmsBsnapshot

单选题What part of the Inmarsat will the SES get access to if the commissioning is successful?()AThe SESBThe space segmentCAny CESDThe CES decided by the applicant

单选题When oil is accidentally discharged into the water,what should you do after reporting the discharge().AContain the oil and remove as much of it as possible from the waterBThrow chemical agents on the water to disperse the oilCThrow sand on the water to sink the oilDObtain your permit from the Corps of Engineers