用“CONTROL?”能检索到()。A、CONTROLLERB、CONTROLSC、CONTROLLINGD、CONTROLLED
用“CONTROL?”能检索到()。
- A、CONTROLLER
- B、CONTROLS
- C、CONTROLLING
- D、CONTROLLED
相关考题:
Communication plays a major role in:A PlanningB OrganizingC ControllingD DirectingE All of the above
90 Communication plays a major role in:A. PlanningB. OrganizingC. ControllingD. DirectingE. All of the above
The additional mark______in the Classification Certificate for Machinery represents the propulsion apparatus is remotely controlled on the navigating bridge control station, and engine room is watched by duty personnel.A.BRCB.MCCC.AUT-0D.AUT-l
The additional mark____in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is watched by duty personnel.A.BRCB.MCCC.AUT-0D.AUT-1
The project management plan defines how the project is executed,monitored and controlled,and closed.It is progressively elaborated by updates,and controlled and approved through the perform integrated( )process.A.Cost controlB.Schedule controlC.Change controlD.Risk control
Change control within information technology(IT)systems is a formal process used to ensure that changes to product or system are introduced in a controlled and coordinated manner.It(74)the possibility that unnecessary changes will be introduced to a systeA.AddsB.RemovesC.ProducesD.Reduces
在EI Villege高级检索平台中ky字段表示什么意思?()A、表示keyword字段B、表示Subject字段C、表示Controlled term字段D、表示同时检索Subject/Title/Abstract字段
关于measurement report 与measurement control的的传送方向,以下描述正确的是:()A、measurement report是从UTRAN到UE,measurement control是从UE到UTRANB、measurement report是从UE到UTRAN,measurement control是从UE到UTRANC、measurement report是从UTRAN到UE,measurement control是从UTRAN到UED、measurement report是从UE到UTRAN,measurement control是从UTRAN到UE
利用百度搜索引擎查询含有“flightcontrol”的PPT文件,正确的检索式为()。A、flight control pptB、flight and control and pptC、"flight control"filetype:pptD、flight control file:ppt
单选题利用百度搜索引擎查询含有“flightcontrol”的PPT文件,正确的检索式为()。Aflight control pptBflight and control and pptCflight controlfiletype:pptDflight control file:ppt
单选题The opening or closing of the cylinder starting valve is controlled by ().Athe starting air distributorBthe cut-off valve on the air mainCthe main starting valveDthe air bottle control valve
单选题The additional mark () in the Classification Certificate for Machinery represents the propulsion apparatus is remotely controlled on the navigating bridge control station, and engine room is watched by duty personnel.ABRCBMCCCAUT-0DAUT-1
单选题The additional mark () in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.ABRCBMCCCAUT-0DAUT-1
单选题Remote control means that ().Athe system is manned manuallyBthe system is situated remotely from the operatorCthe system is controlled automaticallyDall the above
单选题The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is watched by duty personnel.ABRCBMCCCAUT-0DAUT-1
单选题Remote control means that the system is being controlled by the operator who is situated () from the system.AautomaticBlocalCremoteDmanual