Embark on the ()(登艇甲板).A、embarkation deckB、disembarkation ladderC、fenderD、boat plug
Embark on the ()(登艇甲板).
- A、embarkation deck
- B、disembarkation ladder
- C、fender
- D、boat plug
相关考题:
施放救生艇的步骤为_____。A.准备放艇→将艇放至水平甲板→放稳至登艇甲板→人员登艇→将艇放至水面→驶离大船B.准备放艇→人员登艇→将艇放至水平甲板→放稳至登艇甲板→将艇放至水面→驶离大船C.准备放艇→将艇放至水平甲板→放稳至登艇甲板→将艇放至水面→人员登艇→驶离大船
Frapping lines ______.A.secure the lifeboat in the davits when in the stowed positionB.bring the lifeboat close alongside the rail in the embarkation positionC.give the occupants a safety line when the boat is being lowered from the embarkation levelD.reduce the swinging of the lifeboat at the embarkation level
Frapping lines are fitted to lifeboat davits to ______.A.secure the lifeboat in the davits when in the stowed positionB.bring the life boat close along the rail in the embarkation positionC.give the occupants a safety line when the boat is being lowered from the embarkation levelD.reduce the swinging of the lifeboat at the embarkation level
Put in boat plug and hand the fender and the puoy.()A、塞上艇底塞,出艇靠把,撑篙。B、打开艇支座,出艇靠把,撑篙。C、脱开扣绳搭钩,打开艇支座。D、脱开扣绳搭钩,出艇靠把,撑篙。
Bring your immersion suit. Meet in front of the ().A、boat deckB、forecastle deckC、bridgeD、mean deck
Make fast the fore and aft ropes and lay out the embarkation ladder.()A、送出首、尾缆,放登艇梯。B、送出首、围缆,放下艇梯。C、挽牢首、尾缆,放登艇梯。D、挽牢首、尾缆,放下舷梯。
救生艇置放在于艇甲板。()A、Lifeboat is located on the boat deck.B、Lifeboat is located on the main deck.C、Life craft is located on the boat deck.D、Lifeboat is located on the lower deck.
施放救生艇的步骤为()。A、准备放艇→将艇放至水平甲板→放稳至登艇甲板→人员登艇→将艇放至水面→驶离大船B、准备放艇→人员登艇→将艇放至水平甲板→放稳至登艇甲板→将艇放至水面→驶离大船C、准备放艇→将艇放至水平甲板→放稳至登艇甲板→将艇放至水面→人员登艇→驶离大船
单选题Frapping lines are fitted to lifeboat davits to().Asecure the lifeboat in the davits when in the stowed positionBbring the lifeboat close along the rali in the embarkation positionCgive the occupants a safety line when the boat is being lowered from the embarkation levelDreduce the swinging of the lifeboat at the embarkation level
单选题A mechanical davit is designed to automatically().Aposition the boat at the embarkation stationBlift the boat off the inboard chocksCenergize the winch for the fallsDset the brake on the winch
单选题Put in boat plug and hand the fender and the puoy.()A塞上艇底塞,出艇靠把,撑篙。B打开艇支座,出艇靠把,撑篙。C脱开扣绳搭钩,打开艇支座。D脱开扣绳搭钩,出艇靠把,撑篙。
单选题When launching a lifeboat in the rough sea,the davit gears should be released().Abefore the boat is lowered from the stowed positionBas the boat fall blocks break clear of the davit headCbefore the boat is lowered from the embarkation levelDafter the boat is released into the water
单选题When launching a lifeboat,the tricing pennants should be released().Abefore the boat is lowered from the stowed positionBas the boat-fall blocks break clear of the davit headCbefore the boat is lowered from the embarkation levelDafter the boat is released into the water
单选题挽牢首、尾缆,放登艇梯。()AMake fast the fore and aft ropes and lay out the embarkation ladder.BEach cargo should be securely lashed.CWe’ll start loading right now.DMake fast the heaving rope, lay out the embarkation ladder.
单选题Make fast the fore and aft ropes and lay out the embarkation ladder.()A送出首、尾缆,放登艇梯。B送出首、围缆,放下艇梯。C挽牢首、尾缆,放登艇梯。D挽牢首、尾缆,放下舷梯。
单选题Frapping lines().Asecure the lifeboat in the davits when in the stowed positionBbring the lifeboat close alongside the rail in the embarkation positionCgive the occupants a safety line when the boat is being lowered from the embarkation levelDreduce the swinging of the lifeboat at the embarkation level
单选题THE SPEED OF A VESSEL ADJUSTED TO THAT OF A PILOT BOAT AT WHICH THE PILOT CAN SAFELY EMBARK is ().AGround speedBBoarding speedCRelative speedDSpeed of the vessel
单选题根据规定,全体登艇人员依次登艇坐好系好安全带,只留()人在艇甲板。A1B2C3D4