有哪三种主要的图示法:A、 AOA、PERT、CPMB、 PERT、CPM、GERTC、 先导、箭线、条件D、 AON、AOA、PDM
有哪三种主要的图示法:
A、 AOA、PERT、CPM
B、 PERT、CPM、GERT
C、 先导、箭线、条件
D、 AON、AOA、PDM
相关考题:
The major difference between PERT and CPM networks is:A.PERT requires three time estimates whereas CPM requires one time estimate.B.PERT is used for construction projects whereas CPM is used for R D.C.PERT addresses only time whereas CPM also includes cost and resource availability.D.PERT requires computer solutions whereas CPM is a manual technique.E.PERT is measured in days whereas CPM uses weeks or months.
● 在软件开发中, (29) 不能用来描述项目开发的进度安排。在其他三种图中可用 (30) 动态地反映项目开发进展情况。(29)A. 甘特图 B. PERT 图 C. PERT/CPM 图 D. 鱼骨图(30)A. 甘特图 B. PERT 图 C. PERT/CPM 图 D. 鱼骨图
is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles,referred to as nodes,to represent activities and connects them with arrows that show the logical relationships that exist between them. A.PERT B.AOA C.WBS D.PDM
PERT和CPM的最根本区别是( )。A.CPM的工作逻辑关系肯定,PERT的工作逻辑关系不确定B.CPM使用最大可能工作时间估计,PERT使用加权平均时间估计C.CPM的工作必须进行,PERT的某些工作可以不进行D.CPM不允许存在回路,PERT中可以存在回路
PERT和CPM的根本区别是( )。A.CPM的工作逻辑关系肯定,PERT的工作逻辑关系不确定 B.PERT使用了加权平均时间估算 C.CPM的工作必须进行,PERT的某些工作可以不进行 D.CPM不允许存在回路,PERT中可以存在回路
下列有关PERT和CPM的说法错误的是()A、通过PERT技术可以得出任何项目都有不可压缩的最小周期B、PERT可以用作逐日管理C、PERT与CPM的根本不同点在于对活动时间T的计算D、对于大型项目,PERT与CPM可以结合使用
单选题有哪三种主要的图示法()。AAOA、PERT、CPMBPERT、CPM、GERTC节点、箭线、条件DAON、AOA、PDM