What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()A、one route processor (RP) Card and one modular services card (MSC)B、one distributed route processor (DRP) and one S13 fabric card (SFC)C、one line card chassis (LCC) and one fabric card chassis (FCC)D、one route processor (RP) and one fabric card chassis (FCC)E、one line card chassis (LCC) and one S13 fabric card (SFC)
What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()
- A、one route processor (RP) Card and one modular services card (MSC)
- B、one distributed route processor (DRP) and one S13 fabric card (SFC)
- C、one line card chassis (LCC) and one fabric card chassis (FCC)
- D、one route processor (RP) and one fabric card chassis (FCC)
- E、one line card chassis (LCC) and one S13 fabric card (SFC)
相关考题:
Which one of the following parameters is the very first thing that needs to be configured as part of the IGRP routing process?() A. The wild card maskB. The IP addressC. The IP address maskD. The metric weightsE. The Autonomous System number
Which one of the following parameters is the very first thing that needs to be configured as part of the IGRP routing process?()A、The wild card maskB、The IP addressC、The IP address maskD、The metric weightsE、The Autonomous System number
A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A、One processor card and one GX+ expansion cardB、Two processor cards and one GX++ expansion cardC、One processor card, one GX+ expansion card, and one GX++ expansion cardD、Two processor cards, one GX+ expansion card, and one GX++ expansion card
A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server. What is the minimally supported configuration that will allow maximum throughput?()A、Install the two cards in slots 5 and 6 in the x445.B、Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.C、Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.D、Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.
Company.com wants to reassign a host bus adapter (HBA) from one partition to another to handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()A、Use the rmdev command to remove the card from the current partition before doing the DLPAR process.B、Take the source partition down and do the DLPAR function on the target partition.C、Assign the card to the required section of the target partition and run cfgmgr.D、Dynamically remove the card from the source and add to target profile then reactivate the target profile.
A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()A、 One, two, three or four processorsB、 One, two, or three processorsC、 One, three, or four processorsD、 One, two or four processors
A customer is deploying a wireless core feature set using autonomous access points and requires Layer 2 roaming. What is a requirement when deploying this solution?()A、 a minimum of one Cisco 4100 Series WLAN ControllerB、 one WDS per subnetC、 a minimum of one Wireless LAN Services ModuleD、 all clients using Cisco Aironet Wireless LAN Adapters
Which action increases server availability?()A、 configuring a second network card with a different IP addressB、 replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC、 using adapter teaming and configuring the second network card with the same IP address as the first network cardD、 installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.C、Smallest partition one processor, as small 1% of a processor may be transferred.D、Smallest partition one core, as small 10% of a processor may be transferred.
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A、A second IVE adapterB、A second processor cardC、PowerVM Enterprise EditionD、An additional cable-management arm
Company.com is having trouble installing a fresh AIX image onto a newly defined partition on a p5-520. The assignment of the adapters to the each of the partitions is as follows: Fibre Channel Card 01 - partition one - required Fibre Channel Card 02 - partition one - required SCSI adapter 01 - partition one - desired IDE adapter 01 - partition one - required Ethernet adapter 01 - partition one - required Ethernet adapter 01 - partition two - required SCSI adapter 02 - partition two - required IDE adapter 01 - partition two - desired Which of the following actions will enable the installation of the AIX image?()A、Change the IDE adapter from desired to required in partition two and restart the partition to release the resource.B、Purchase a SCSI DVD-ROM drive to connect to the SCSI adapter in partition two.C、Purchase an LTO tape drive so that a system image backup can be created to install a new AIX partition.D、Change the IDE adapter from required to desired in partition one and restart the partition to release the resource.
单选题Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()ACards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. BThe HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. CIf the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. DThe Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()AThe new system requires 1 installed processor card for the GX++ bus adapterBThe new system requires a minimum of 2 installed processor cards for the GX++ bus adapterCThe new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterDThe new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()AA second IVE adapterBA second processor cardCPowerVM Enterprise EditionDAn additional cable-management arm
单选题Which action increases server availability?()A configuring a second network card with a different IP addressB replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC using adapter teaming and configuring the second network card with the same IP address as the first network cardD installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
单选题An indicator card or pressure-volume diagram, shows graphically the ()Acompression ratio of the engineBvolume of the engineCrelationships between pressure and volume during one stroke of the engineDrelationships between pressure and volume during one cycle of the engine
填空题Among the typically essential debts in our lives, the most costly one is credit card debt.____
单选题Which one of the following parameters is the very first thing that needs to be configured as part of the IGRP routing process?()AThe wild card maskBThe IP addressCThe IP address maskDThe metric weightsEThe Autonomous System number
单选题A customer is deploying a wireless core feature set using autonomous access points and requires Layer 2 roaming. What is a requirement when deploying this solution?()A a minimum of one Cisco 4100 Series WLAN ControllerB one WDS per subnetC a minimum of one Wireless LAN Services ModuleD all clients using Cisco Aironet Wireless LAN Adapters
单选题What is the minimum hardware configuration of the multishelf Cisco CRS- 1 system?()Aone route processor (RP) Card and one modular services card (MSC)Bone distributed route processor (DRP) and one S13 fabric card (SFC)Cone line card chassis (LCC) and one fabric card chassis (FCC)Done route processor (RP) and one fabric card chassis (FCC)Eone line card chassis (LCC) and one S13 fabric card (SFC)
单选题A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()AOne processor card and one GX+ expansion cardBTwo processor cards and one GX++ expansion cardCOne processor card, one GX+ expansion card, and one GX++ expansion cardDTwo processor cards, one GX+ expansion card, and one GX++ expansion card
单选题A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()ASmallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.BSmallest partition 10% of a processor, as small 1% of a processor may be transferred.CSmallest partition one processor, as small 1% of a processor may be transferred.DSmallest partition one core, as small 10% of a processor may be transferred.
单选题A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server. What is the minimally supported configuration that will allow maximum throughput?()AInstall the two cards in slots 5 and 6 in the x445.BInstall the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.CInstall an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.DConnect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.
单选题Company.com wants to reassign a host bus adapter (HBA) from one partition to another to handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()AUse the rmdev command to remove the card from the current partition before doing the DLPAR process.BTake the source partition down and do the DLPAR function on the target partition.CAssign the card to the required section of the target partition and run cfgmgr.DDynamically remove the card from the source and add to target profile then reactivate the target profile.