An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A、Identify necessary operating system updatesB、Implement the changeC、Document the changeD、Schedule system down time

An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()

  • A、Identify necessary operating system updates
  • B、Implement the change
  • C、Document the change
  • D、Schedule system down time

相关考题:

Project management/project planning is most closely aligned with:A.Long range/strategic planning ( years or more).B.Intermediate range planning ( to years)C.Short range/tactical planning ( year or less).D.All of the above.E.B and C.

Planning activities such that predetermined resource availability pools are not exceeded is called:A.Resource leveling.B.Manpower leveling.C.Resource limited planning.D.Manpower planning.E.Manpower contingency planning.

Which of the following constitute Juran's "quality trilogy":A . planning, inspection, control.B . planning, improvement, control.C . planning, organization, control.D . product, price, customer.E . design, build, deliver.

121 Project management/project planning is most closely aligned with:A. Long range/strategic planning (5 years or more).B. Intermediate range planning (1 to 5 years)C. Short range/tactical planning (1 year or less).D. All of the above.E. B and C

123 Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.

116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.B. Manpower leveling.C. Resource limited planning.D. Manpower planning.E. Manpower contingency planning.

MRPII指的是:() A.material requirement planning。B.management requirement planning。C.manufacturing resource planning。D.material revenue planning。E.Material risk planning。

Lesson planning should be done at two levels: _____. A.macro planning and micro planningB.day by day and one week

ideally, lesson planning should be done at two levels: _______________. A. before-class planning and after-class planningB. before-class preparation and after-class feedbackC. before-class planning and after-class reflectionD. macro planning and micro planning

The project life-cycle can be described as().A.project concept, project planning, project execution, and project close-outB.project planning, work authorization, and project reportingC.project planning, project control, project definition, WBS development, and project terminationD.project concept, project execution, and project reporting

A network administrator is planning a network installation for a large organization.The design requires 100 separate subnetworks,so the company has acquired a Class B network address.What subnet mask will provide the 100 subnetworks required, if 500 usable host addresses are required per subnet?()A、255.255.240.0B、255.255.248.0C、255.255.252.0D、255.255.254.0E、255.255.255.0F、255.255.255.192

计划(Planning)

You are planning a new VLAN-based network solution.  What is one item you should consider when creating your implementation plan as it concerns VLANs?()A、generic router and switch configuration parametersB、end-to-end test plan after all components have been installed and  configuredC、administrator assignmentsD、rollback plan

()is the management system to control the material consumed, reduce inventory in the manufacture company.A、DRP (Distribution Resource Planning)B、LRP (Logistics Resource Planning)C、MRP (Material Requirements Planning)D、ERP (Enterprise Resource Planning)

An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()A、Create a test environment for the new version.B、Determine system requirements for the upgrade.C、Request bids from other competing vendors in the product space.D、Document the upgrade.

An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.

An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.

An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()A、LDAP Authentication ModuleB、Smart Assist for Active DirectoryC、C-SPOC for user and password managementD、File Collections designating one node as the primary authentication node

An administrator wants to use the online planning worksheets as an aid to configuring a PowerHA cluster.Which PowerHA fileset would the administrator need to install in order to obtain this tool?()A、cluster.es.hawB、cluster.es.worksheetsC、cluster.es.tools.worksheetsD、cluster.es.server.worksheets

During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()  A、 None,everything can be done with the cluster active.B、 Minimal downtime will be required to import the volume groups.C、 Several hours are required for testing before final synchronization.D、 Minimal downtime will be required to connect and test the serial network.

单选题An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()A Follow the pre-installation plan and procedures.按照预先安装计划和程序。B Review the system logs to check for errors.C Notify all users that the old system will be taken offline.D Apply all security updates to the system.

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMc  BAsynchronous adapters on the new HMcCThe two 570 servers are directly connected to the new HMc  DOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

单选题A network administrator is planning a network installation for a large organization.The design requires 100 separate subnetworks,so the company has acquired a Class B network address.What subnet mask will provide the 100 subnetworks required, if 500 usable host addresses are required per subnet?()A255.255.240.0B255.255.248.0C255.255.252.0D255.255.254.0E255.255.255.0F255.255.255.192

单选题An administrator is planning an upgrade of a major software package on an application server. The software has been tested successfully in a test environment and it is ready to go into production.  Which of the following steps should the administrator take next?()A Identify necessary operating system updatesB Implement the changeC Document the changeD Schedule system down time

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMCBAsynchronous adapters on the new HMCCThe two 570 servers are directly connected to the new HMCDOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

单选题An administrator wants to use the online planning worksheets as an aid to configuring a PowerHA cluster.Which PowerHA fileset would the administrator need to install in order to obtain this tool?()Acluster.es.hawBcluster.es.worksheetsCcluster.es.tools.worksheetsDcluster.es.server.worksheets

单选题During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()A None,everything can be done with the cluster active.B Minimal downtime will be required to import the volume groups.C Several hours are required for testing before final synchronization.D Minimal downtime will be required to connect and test the serial network.