A server has a processor that allows it to calculate two applications at the same time. Which of the following describes this capability of the processor?()A、Dual processingB、Multi-processingC、Multi-taskingD、Multi-threading

A server has a processor that allows it to calculate two applications at the same time. Which of the following describes this capability of the processor?()

  • A、Dual processing
  • B、Multi-processing
  • C、Multi-tasking
  • D、Multi-threading

相关考题:

Your network contains a database server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2).Server1 has the following hardware configurations:·A single processor that supports hyper-threading·Dual processor motherboard·Two hard disks·2 GB of RAMThe first disk contains all the files for the operating system and applications. The second disk is empty.Hyper-threading is disabled in the BIOS.Users report a slow response when they query the database on Server1.You monitor Server1 for one day and receive the performance statistics shown in the following table.You need to improve database performance.What should you do? ()A. Upgrade the RAM to 4 gb.B. Install a second processor.C. Enable hyper-threading in the bios.D. Move the database to the second disk.

An administrator has shut down a server to install additional memory. When the administrator restarts the server after the upgrade, it times out. Which of the following could be the cause of the problem?()A. Processor failureB. Third party memoryC. Disk drive failureD. ESD during the upgradeE. Backplane failure

You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). Server1 runs acustom application.Users report that the performance of Server1 has dropped significantly during the last month. You monitor the server and obtain the data shown in the exhibit. (Click the Exhibit button.)You need to increase the performance of Server1.What should you do?()A. Increase the server memory.B. Install an additional processor.C. Install a high performance disk.D. Install an additional network adapter.

Which of the following statements could be true about a server overheating?()A、The processor is hitting 100% utilization.B、The server is having memory errors.C、The server fans have failed.D、The processors are of two different stepping levels.E、There is no thermal protection between the processor and the heat sink.

Companycom is converting an application over to a p5 595 server with LPARs and has underestimated the processor requirements. The system has COD processors, but the customer does not know how to size the workload. What course of action would help identify the processor requirement?()A、Activate the Trial COD for the processors and run a test to verify outcomeB、Activate the On/Off COD for the processors and run a test to verify outcomeC、Use rmss to simulate the processor workload and run a test to verify outcomeD、Use rmps to simulate the processor workload and run a test to verify outcome

A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()A、Flash DriveB、DVD-RWC、CD-ROMD、SSD

A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model.  Which of the following is the BEST reason why this upgrade will not work?()A、 The socket size does not matchB、 The cache is from a different manufacturerC、 The processors do not matchD、 Processors cannot be upgraded after server has been deployed

An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()A、Rack cooling equipment failureB、Dust collection in the serverC、Server processor failureD、Server power supply failure

An administrator has shut down a server to install additional memory. When the administrator restarts the server after the upgrade, it times out. Which of the following could be the cause of the problem?()A、Processor failureB、Third party memoryC、Disk drive failureD、ESD during the upgradeE、Backplane failure

Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()A、8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor B、4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor C、8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor D、16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor

A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()A、Interconnect the service processors and use the IBM Director AgentB、Install RSA II in each server and chain together the systems management processorsC、Install the RSA II in the top server and chain together the service processor interconnectD、Install the IBM Director Agent on each server and use the remote control function to restart the servers

Company.com has purchased a 2-way p5-520 and would like to create three Micro-Partitions on the server. Which feature of Advanced POWER Virtualization would allow them to create the desired number of partitions?()A、Virtual EthernetB、Shared Ethernet AdapterC、Dedicated ProcessorsD、Shared Processor Pool

You are speaking to an IT manager with 350 small servers. The IT manager is looking to reduce and consolidate systems.  What strategy would you follow?()A、Tell the customer that IBM has the best scale-out server strategy.B、Show the benefit of server consolidation with IBM and the return on investment.C、Find out the mixture of server processor and application type.D、Tell the customer to buy smaller servers.

ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()A、Configure the IP address through the first client partition.B、Configure the IP address through the ASMI menus.C、Configure the POWER5 service processor for DHCP from the HMC DHCP server.D、Configure the HMC to use the default IP address on the service processor when acquiring the managed server.

Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained. How should the Virtual IO Server's shared processor LPAR be configured?()A、Capped and with a lower shareB、Uncapped and with a lower shareC、Uncapped and with a higher shareD、Capped and with no change in share

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window. Which solution addresses this problem without requiring additional hardware?()A、AddingVMControl will automate processor resource allocation during peak workloads.B、Enable Dynamic Symmetric Multithreading in the HMC to balance workloads across processors.C、Add processing resources during the times they are required using Utility Capacity on Demand.D、Changing the partitions to Uncapped can make use of additional processor cycles during peak workloads.

You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). Server1 runs a custom application. Users report that the performance of Server1 has decreased significantly during the last 30 minutes. You need to identify the current processor and memory usage for each process running on Server1. Which tool should you use? ()A、Event ViewerB、Task ManagerC、Query ProcessD、System Configuration Utility

You manage a member server that runs Windows Server 2008. The server has the Terminal Services role installed. Microsoft Windows System Resource Manager (WSRM) is installed on the server.  Users report performance degradation on the Terminal Server. You monitor the server and notice that one user is consuming 100 percent of the processor time.  You create a resource-allocation policy named Policy1 that limits each user to 30 percent of the total processor time. You observe no performance improvement. You need to configure WSRM to enforce Policy1. What should you do?()A、Set Policy1 as the Profiling Policy.B、Set Policy1 as the Managing Policy.C、Restart the Terminal Services Configuration service.D、Launch the WSRM application by using the user context of the Terminal Server System account.

单选题Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()A8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor B4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor C8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor D16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor

单选题A server has a processor that allows it to calculate two applications at the same time. Which of the following describes this capability of the processor?()ADual processingBMulti-processingCMulti-taskingDMulti-threading

单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()ACreate capped partitions for the database servers.BCreate workload partitions for the database servers.CCreate a separate shared processor pool for the database servers.DCreate virtual processors equal to the entitlement for database servers.

单选题An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()ARack cooling equipment failureBDust collection in the serverCServer processor failureDServer power supply failure

单选题A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model.  Which of the following is the BEST reason why this upgrade will not work?()A The socket size does not matchB The cache is from a different manufacturerC The processors do not matchD Processors cannot be upgraded after server has been deployed

多选题Which of the following statements could be true about a server overheating?()AThe processor is hitting 100% utilization.BThe server is having memory errors.CThe server fans have failed.DThe processors are of two different stepping levels.EThere is no thermal protection between the processor and the heat sink.

单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()AOrder a POWER5 HMCBConnect to the existing HMCCInstall an 8-port asynchronous card in the managed server to connect to the existing HMCDInstall an additional network card to the existing HMC and connect to the POWER5 service processor

单选题A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()AFlash DriveBDVD-RWCCD-ROMDSSD

单选题A server has a processor that allows it to calculate two applications at the same time. Which of the following describes this capability of the processor?()A Dual processingB Multi-processingC Multi-taskingD Multi-threading