An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()A、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#B、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameC、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi# On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameD、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#

An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()

  • A、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#
  • B、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name
  • C、On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi# On the VIO Server: rmdev -dev  rootvg_disk, rmlv rootlv_name
  • D、On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name On the AIX LPAR: rmdev -dl  hdisk#, rmdev -dl vscsi#

相关考题:

Companycomhasthefollowing:8x1.65GHzCPUs16GBMemory4LPARsLPAR1:Test/Dev1CPU,2GBMemory,1FibreChannelHBA,AIX5.3LPAR2:QA1CPU,2GBMemory,1FibreChannelHBA,AIX5.3LPAR3:Prod3CPUs,6GBMemory,1FibreChannelHBA,AIX5.3LPAR4:WebApp3CPUs,6GBMemory,1FibreChannelHBA,SUSELinuxUtilizationovera30dayperiodLPAR1:Averageutilizationwas15%,Peakutilizationwas100%LPAR2:Averageutilizationwas25%,Peakutilizationwas100%LPAR3:Averageutilizationwas50%,Peakutilizationwas90%LPAR4:Averageutilizationwas35%,Peakutilizationwas100%IfthecustomerhasarequirementforallfourLPARstobemovedtoap5590andassignedtoasharedpool.Whichofthefollowingwouldbestdescribetheprofilerequirements?()

Which of the following support dynamic LPAR?()A、AIX v5.1B、AIX v4.3.3C、SuSe Linux Enterprise Server 9 (SLES9)D、SuSe Linux Enterprise Server 8 (SLES8)

A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2.  Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()A、7311-D20 drawer with four disksB、Upgrade to AIX 5.3C、Fiber adapters to attach to SAND、Nothing

In addition to AIX, which of the following operating systems is supported in a pSeries LPAR environment?()A、z/OSB、LinuxC、Sun Solaris 9D、Microsoft Windows 2003

Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?()A、AIX V5.2B、AIX V4.2C、AIX V4.3D、AIX V5.1

A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems.  They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems.  They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()A、Combine the file/print servers onto a larger Intel-based machine (x445).B、Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.C、Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.D、Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()A、Remove the physical Ethernet adapters from the LPARsB、Activate Advanced POWER VirtualizationC、Update microcode for the virtual adaptersD、Upgrade AIX V5.2 LPAR to AIX V5.3

A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()A、A CD or DVD with installation mediaB、An internal SCSI adapter in the target LPARC、An Ethernet adapter for access to an FTP serverD、Advanced Power Virtualization feature of the p5 590

Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()A、Daisy chain the unsupported 3rd party storage subsystem devices with the local SCSI disk drive B、Assuming the 3rd party storage subsystem has AIX support, enable access through a Virtual IO Server C、Assuming the 3rd party storage subsystem has AIX support, implement the Linux partition within an AIX partition D、3rd party storage is not an option for p5 570 servers and therefore only IBM disk subsystems can be considered as a solution

Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization

A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()A、In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.B、In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.C、In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.D、In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.

A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A、Upgrade system firmware to latest levelB、Upgrade to AIX 5.3C、Upgrade HMC to version 6.1D、Convert rootvg filesystems to JFS2

Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()A、Assign the adapter to an IO Hosting partitionB、Use AIX 5L affinity to move the application from SUSE to AIXC、Use AIX 5.3 drivers to install the adapter in the Linux LPARD、Assign the adapter to an AIX 5.3 partition running Linux Affinity

Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()A、SLES9:2 dedicated processors AIX: 2.0 processing units,4 virtual processors,uncappedB、SLES9:2.0 processing units,2 virtual processors,uncapped AIX:2.0 processing units,4 virtual processors,cappedC、SLES9:2.0 processing units,3 virtual processors,uncapped AIX:2 dedicated processors SLES9:2.5 processing units,3 virtual processors,cappedD、AIX:1.5 processing units,2 virtual processors,capped

单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()AA CD or DVD with installation mediaBAn internal SCSI adapter in the target LPARCAn Ethernet adapter for access to an FTP serverDAdvanced Power Virtualization feature of the p5 590

单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()AUse AIX 5.3 which supports micro-partitioning for both the test and training LPARSBUse DLPAR to move resources from the test LPAR to training when training is activeCInstall Partition Load Manager to share resources between the test and training environmentsDInstall Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs

单选题A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()AIn the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.BIn the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.CIn the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.DIn the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.

单选题Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a p5 590 and to have dedicated CPU resources. Which of the following would best describe the profile requirements?()ALPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 BLPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0 CLPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 DLPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0

单选题What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1?()A128MBB256MBC512MBD1024MB

单选题What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX 6.1?()A128MB256MC512MD1024M

单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()AOne single port Ethernet adapterBFour dual port Ethernet adaptersCTwo single port Ethernet adaptersDEight single port Ethernet adapters

单选题What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()?A128 MBB256 MBC512 MBD1024 MB

单选题An AIX LPAR has been reconfigured to use direct-attached disks. What is the best way to fully remove and delete the Virtual IO volumes?()AOn the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#BOn the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameCOn the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi# On the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_nameDOn the VIO Server: rmdev -dev rootvg_disk, rmlv rootlv_name On the AIX LPAR: rmdev -dl hdisk#, rmdev -dl vscsi#

单选题Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?()AAIX V5.2BAIX V4.2CAIX V4.3DAIX V5.1