Companycom LPAR that is using a Virtual IO Server needs to be more highly available. How can this be accomplished using APV features?()A、Reallocate the Virtual IO Server disks to the user LPARB、Create a stripe-group within the Virtual IO Server to protect against disk failureC、Reconfigure the user LPAR to use both locally owned disk and a Virtual SCSI diskD、Create a second Virtual IO Server and reconfigure the user LPAR to mirror across both Virtual IO Servers
Companycom LPAR that is using a Virtual IO Server needs to be more highly available. How can this be accomplished using APV features?()
- A、Reallocate the Virtual IO Server disks to the user LPAR
- B、Create a stripe-group within the Virtual IO Server to protect against disk failure
- C、Reconfigure the user LPAR to use both locally owned disk and a Virtual SCSI disk
- D、Create a second Virtual IO Server and reconfigure the user LPAR to mirror across both Virtual IO Servers
相关考题:
Anadministratorhasinstalled1VIOServerand5clientLPARsona16-corePower570withthefollowingCPUrequirements:VirtualProcessorsProcessingUnitsMinDesiredMaxMinDesiredMaxVIOS11240.11.02.0LPAR14444.04.04.0LPAR22581.05.06.0LPAR31340.10.31.0LPAR43690.53.06.0LPAR51361.03.0.06IftheadministratoractivatestheLPARsintheaboveorder,whatwillbetheresult?()A.AllLPARswillstartexceptLPAR5.B.AllLPARswillstartwithdesiredcapacity.C.AllLPARswillstartbutLPAR5willhaveitsminimumcapacityassigned.D.AllLPARswillstartbutLPAR5willhavelessthanitsdesiredcapacity.
AsystemadministratorhasbeeninstructedtoattachstorageintheirclientLPARs,inaPower770,withfibre channeladaptersusingN_portIDvirtualization(NPIV).Whichofthefollowingpartitionshastheminimum requirementstoutilizevirtualfibrechannel?()A.LPAR-Awith1GbFCHBAandSANconnectionB.LPAR-Bwith2GbFCHBAandSANconnectionC.LPAR-Cwith4GbFCHBAandSANconnectionD.LPAR-Dwith8GbFCHBAandSANconnection
An administrator is creating a new LPAR with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A、 0B、 1C、 255D、 256
An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can however allocate 512 MB that is free to LPAR 1 on the 570. What is the most likely cause of this failure when dynamically moving memory?()A、 Maxperm% is set too low on LPAR 2B、 Insufficient paging space on LPAR 1C、 Service IBM.DRM is unavailable on LPAR 1D、 Insufficient pinnable memory frames available on LPAR 2
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A、The resources must be unallocated in an LPARB、The microcode on the pSeries must be currentC、All network adapters on the LPAR must be definedD、Network connectivity and name resolution capability between HMC and LPARs
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()A、An administrative VLAN with port 1808B、Port 657 which must remain open to TCP/IP and UDP trafficC、Network addresses are provided by DHCP services on the networkD、DHCP on the HMC is required to be on to communicate between LPAR and HMC
Which of the following functions is provided by the LPAR Validation Tool (LVT)?()A、LPAR creationB、Proper card placementC、Application compatibility assistanceD、Response time for applications
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode
An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A、 0B、 1C、 255D、 256
Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in their data center. Due to the complexity of the consolidation, the customer is asking the technical support specialist to give them a report which shows pre order PCI adapter placement and validates them against IBM's recommendations. The concern is that the factory will not install the adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to provide this?()A、LPAR Validation Tool (LVT)B、Personal Systems Configurator (PSC)C、IBM Configuration for eBusiness (eConfig)D、Advanced System Management Interface (ASMI)
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.
A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent. What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()A、Reboot the source LPAR.B、Remove the resource from the source LPAR.C、Rediscover the managed system from the HMC.D、Add the resource to the profile of the LPAR.
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()A、Daisy chain the unsupported 3rd party storage subsystem devices with the local SCSI disk drive B、Assuming the 3rd party storage subsystem has AIX support, enable access through a Virtual IO Server C、Assuming the 3rd party storage subsystem has AIX support, implement the Linux partition within an AIX partition D、3rd party storage is not an option for p5 570 servers and therefore only IBM disk subsystems can be considered as a solution
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization
Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()A、Apply OS updates once a yearB、Utilize a GPFS cluster solutionC、Implement a two server deployment with HACMPD、Install a single server implementation with HACMP failover to a second LPAR
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()A、LoadlevelerB、AIX Workload ManagerC、Partition Load ManagerD、Tivoli Provisioning Manager
Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs to be moved to a p5 590 and assigned to a shared pool. Which of the following would best describe the profile requirements?()A、LPARs 1 and 2, capped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0B、LPARs 1 and 2, capped, SMT on, Weights between 100-130, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 25-30, min CPU 2.7, max CPU 3.0 C、LPARs 1 and 2, uncapped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0D、LPARs 1 and 2, uncapped, SMT off, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0
单选题Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()ATwo HBAs assigned to each redundant VIOS which provides VSCSI access to LUNsBTwo HBAs assigned to each LPAR with each LPAR owning HBAs on the same PCI bussesCTwo HBAs assigned to each LPAR with each LPAR owning HBAs on separate PCI bussesDOne HBA assigned to each LPAR and two HBAs assigned to a VIOS providing VSCSI access to LUNs
单选题Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()AThe resources must be unallocated in an LPARBThe microcode on the pSeries must be currentCAll network adapters on the LPAR must be definedDNetwork connectivity and name resolution capability between HMC and LPARs
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()AUse AIX 5.3 which supports micro-partitioning for both the test and training LPARSBUse DLPAR to move resources from the test LPAR to training when training is activeCInstall Partition Load Manager to share resources between the test and training environmentsDInstall Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
单选题An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can however allocate 512 MB that is free to LPAR 1 on the 570. What is the most likely cause of this failure when dynamically moving memory?()A Maxperm% is set too low on LPAR 2B Insufficient paging space on LPAR 1C Service IBM.DRM is unavailable on LPAR 1D Insufficient pinnable memory frames available on LPAR 2
单选题Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a p5 590 and to have dedicated CPU resources. Which of the following would best describe the profile requirements?()ALPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 BLPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT on, min CPU 2.0, max CPU 3.0, desired CPU 3.0 CLPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 2.0 DLPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT off, min CPU 1.0, max CPU 3.0, desired CPU 3.0
单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()AOne single port Ethernet adapterBFour dual port Ethernet adaptersCTwo single port Ethernet adaptersDEight single port Ethernet adapters
单选题Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()AUse shared memory and semaphores to transfer the data to the TSM LPARBProvide gigabit Ethernet adapters in each LPAR and run a crossover cableCCreate a Virtual Ethernet between the production server and the TSM LPARsDCreate a Virtual Ethernet between the TSM server LPAR and the non-production LPARs