When selling against competition, which of the following focus on the iDataPlex value proposition?()A、Large selection of proven applications B、Standard rack mounting C、Flexible configurations ready for integration and testing at the customers data center D、Easy maintenance through individual hot-swappable nodes

When selling against competition, which of the following focus on the iDataPlex value proposition?()

  • A、Large selection of proven applications 
  • B、Standard rack mounting 
  • C、Flexible configurations ready for integration and testing at the customers data center 
  • D、Easy maintenance through individual hot-swappable nodes

相关考题:

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()A. Hot siteB. Warm siteC. Cold siteD. Active failover site

Which of the following statements is TRUE about mounting a file system?() A.A file system cannot be mounted on a directory containing data.B.Mounting a file system on a mount point containing data will delete the data.C.Mounting a file system on a amount point containing data will make the data temporarily inaccessible.D.A systems administrator must manually create an empty directory prior to mounting an AIX JFS.

Which three are benefits of A virtualized data center solution over A typical implementation?()A、simplified cablingB、more efficient routingC、fewer applications per serverD、more efficient power consumptionE、more control over each serverF、less rack space

A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()A、The room temperature has reached 23C (73.4F). B、A Blade within the chassis has been shut down. C、The ambient temperature in the data center has increased D、One of the additional System X servers in the BladeCenter rack has failed.

A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()A、iDataPlex with vSphereB、Four x3550 M3 servers,vSphere and racksC、BladeCenter, HX5 blades and vSphereD、One x3950 X5 servers andvSphere

Which two design recommendations are most appropriate when EIGRP is the data center corerouting protocol? ()A、 Summarize data center subnets.B、 Use passive interfaces to ensure appropriate adjacencies.C、 Tune the EIGRP timers to enable EIGRP to achieve quicker convergence.D、 Adjust the default bandwidth value to ensure proper bandwidth on all links.E、 Advertise a default summary route into the data center core from the aggregation layer.

Refer to the following architectures, which one is able to supply a core infrastructure so that customers can capitalize quickly with the change of business requirements?()A、BranchB、CampusC、TeleworkerD、Data center

A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()A、Run cabling and power to the warm site.B、Restore data to the equipment.C、Transfer all data tapes over to the warm site.D、Restore least critical applications online to test to make sure the site is functioning.

When installing a wireless network in a large area, which of the following is the FIRST thing thatshould be considered when trying to get the MOST coverage?()A、SSID namingB、Device placementC、Encryption methodsD、Channel selection

An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()A、 Hot siteB、 Warm siteC、 Cold siteD、 Active failover site

A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()A、Usable densityB、Lowest cost of acquisitionC、Flexible configurations ready for integration and testing at the customer locationD、Standard rack mounting

A customer is considering iDataPlex and several competitive solutions. Which of the following favor iDataPlex?()A、Lowest cost of acquisition B、Useable density C、Flexible configurations ready for integration and testing at the customers data centerD、Standard rack mounting

When selling against competition, which of the following focus on the iDataPlex value proposition? ()A、Superior chip density B、Balance performance, cost, and power+cooling efficiency C、Flexible configurations ready for integration and testing at the customers data center D、Standard rack mounting

Which is the packaging strategy of iDataPlex of the following?()A、Fourteen servers per rack likeBladeCenterB、Two servers per rack for optimal cooling costC、One server per rack for optimal cooling and energy efficiencyD、Four servers per rack (twoexach half high) for optimal cooling

When selling against competition, which focus on the iDataPlex value proposition of the following?()A、Superior chip densityB、Balance performance, cost, and power and cooling efficiencyC、Flexible configurations ready for integration and testing at the customer locationD、Standard rack mounting

A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()A、Have optional Fibre Channel and Ethernet switches been installed in the server?B、What is the available kVA value of the UPS?C、Are there sufficient empty socket outlets in the UPS?D、What is the impact on the power consumption of the data center cooling system?

单选题The passage suggests which of the following about direct selling?AIt is used in the marketing of most industrial products.BIt is often used in cases where there is a large program target.CIt is not economically feasible for most marketing programs.DIt is used only for products for which there are many potential customers.

单选题A customer is considering iDataPlex and several competitive solutions. Which of the following favor iDataPlex?()ALowest cost of acquisition BUseable density CFlexible configurations ready for integration and testing at the customers data centerDStandard rack mounting

单选题A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()AHave optional Fibre Channel and Ethernet switches been installed in the server?BWhat is the available kVA value of the UPS?CAre there sufficient empty socket outlets in the UPS?DWhat is the impact on the power consumption of the data center cooling system?

单选题When selling against competition, which of the following focus on the iDataPlex value proposition?()ALarge selection of proven applications BStandard rack mounting CFlexible configurations ready for integration and testing at the customers data center DEasy maintenance through individual hot-swappable nodes

单选题When selling against competition, which focus on the iDataPlex value proposition of the following?()ASuperior chip densityBBalance performance, cost, and power and cooling efficiencyCFlexible configurations ready for integration and testing at the customer locationDStandard rack mounting

单选题A customer is considering iDataPlex and several competitive solutions. Which favor iDataPlex of the following?()AUsable densityBLowest cost of acquisitionCFlexible configurations ready for integration and testing at the customer locationDStandard rack mounting

单选题When selling against competition, which of the following focus on the iDataPlex value proposition? ()ASuperior chip density BBalance performance, cost, and power+cooling efficiency CFlexible configurations ready for integration and testing at the customers data center DStandard rack mounting

多选题Cisco UCS provides integration interfaces and protocols to support heterogeneous data center environments and supports standard monitoring and event notification systems, providing data to standard enterprise-management tools. Which two of these list the primary Cisco UCS interfaces and industry standard-based read-only interfaces? ()AUCS Manager XML API and UCS CLIBSNMP, SMASH CLP, and CIM-XMLCUCS Manager, DCOS, and Local-mgmtDSoL and NX-OSEdebug-plugin and UCS Manager GUI

单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.

单选题A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()ARun cabling and power to the warm site.BRestore data to the equipment.CTransfer all data tapes over to the warm site.DRestore least critical applications online to test to make sure the site is functioning.

多选题Which three are benefits of A virtualized data center solution over A typical implementation?()Amore efficient power consumptionBfewer applications per serverCless rack spaceDmore efficient routingEmore control over each serverFsimplified cabling