A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()A、increase the buffer credits on the HBAsB、increase the number of device logins on the ESX serversC、additional paths will be required between the servers and storageD、multipath option on the ESX servers should be changed to round-robin
A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()
- A、increase the buffer credits on the HBAs
- B、increase the number of device logins on the ESX servers
- C、additional paths will be required between the servers and storage
- D、multipath option on the ESX servers should be changed to round-robin
相关考题:
Including the customer in the process of project planning is:A.Slow and counterproductive.B.Essential in the definition and documentation of project goals.C.Necessary, but of limited value.D.Unnecessary because project goals are defined in the proposal stage.E.None of the above.
Which of the following constitute Juran's "quality trilogy":A . planning, inspection, control.B . planning, improvement, control.C . planning, organization, control.D . product, price, customer.E . design, build, deliver.
123 Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.
● Including the customer in the process of project planning is:A Slow and counterproductive.B Essential in the definition and documentation of project goals.C Necessary, but of limited value.D Unnecessary because project goals are defined in the proposal stage.E None of the above.
A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?() A.0B.1C.2D.4
Where should known problem areas in the site survey be documented?()A、nowhere (but should be discussed with the customer)B、on the site survey map and within the site survey textC、on the customers blueprintsD、in the Cisco WCS Planning Tool
Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()A、 providing a partner with information regarding customer acceptance of a new solutionB、 providing information regarding current network infrastructure readinessC、 using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunityD、 adjusting a solution to account for a customer’s physical site characteristics
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction
A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A、0B、1C、2D、4
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster
What are the three partner benefits of service contracts?()A、renews automatically for the lifetime of the productB、eliminates network problemsC、generate recurring revenueD、helps customers speed architectural planning and designE、produces higher margins than product sales alongF、strengthens customer loyalty
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()A、IBM System Storage DS8000: Host Systems Attachment GuideB、DS8000 Interoperability MatrixC、IBM System Storage DS8000: Introduction and Planning GuideD、IBM System Storage Solution Handbook
A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations. Which of the following customer requirements must be considered()A、the number of SAN ports required by the solutionB、thin provisioning is mandatoryC、the solution needs to support RAID 0D、the solution needs to be supported by the VMware Site Recovery Manager
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()A、ITSO RedbooksB、Facts and FeaturesC、System Planning ToolD、Fix Level Recommendation Tool
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)
Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()A、The customer executive who is funding the projectB、IBM Global Financing when they are financing the purchaseC、Subject matter experts representing each component of the solutionD、Hardware installation planning representative responsible for the installation
The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()A、customer must reconfigure aniSCSI port for mirroringB、customer must set up a fabric and dedicate port 4 for disaster recoveryC、customer must set up a fabric and dedicate port 2 for disaster recoveryD、replication is not possible with the DS5020, they must consider the DS5300
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()A、Sales ManualB、Announcement LetterC、Site and Hardware Planning InformationD、Adapter, Devices, and Cable Information for Multiple Bus Systems
A customer is planning on establishing a Global Mirror between two Storwize V7000 storagearrays. The customer is planning to lease an IP WAN connection between sites for the tasks andis running a SAP (database) application on Oracle. Which of the following planning considerationsis most important?()A、the distance between sites needs to be less than 100 kilometersB、consistency groups should be created to maintain write order on the remote mirrorC、ensure sufficient bandwidth exists on the link based on average application workloadsD、ensuring a low round trip latency of less than 30ms on the WAN connection is required
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
单选题The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()Acustomer must reconfigure aniSCSI port for mirroringBcustomer must set up a fabric and dedicate port 4 for disaster recoveryCcustomer must set up a fabric and dedicate port 2 for disaster recoveryDreplication is not possible with the DS5020, they must consider the DS5300
单选题Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()AThe customer executive who is funding the projectBIBM Global Financing when they are financing the purchaseCSubject matter experts representing each component of the solutionDHardware installation planning representative responsible for the installation
单选题A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()A0B1C2D4
单选题Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()A providing a partner with information regarding customer acceptance of a new solutionB providing information regarding current network infrastructure readinessC using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunityD adjusting a solution to account for a customer’s physical site characteristics
多选题What are the three partner benefits of service contracts?()Aproduces higher margins than product sales alongBgenerate recurring revenueCstrengthens customer loyaltyDrenews automatically for the lifetime of the productEhelps customers speed architectural planning and designFeliminates network problems