单选题The primary purpose of a load line is to establish required().Aminimum freeboardBGMCtransverse stabilityDfresh water allowances

单选题
The primary purpose of a load line is to establish required().
A

minimum freeboard

B

GM

C

transverse stability

D

fresh water allowances


参考解析

解析: 暂无解析

相关考题:

4 (a) The purpose of ISA 510 ‘Initial Engagements – Opening Balances’ is to establish standards and provide guidanceregarding opening balances when the financial statements are audited for the first time or when the financialstatements for the prior period were audited by another auditor.Required:Explain the auditor’s reporting responsibilities that are specific to initial engagements. (5 marks)

The primary line module has failed and the spare line module is nowactive.What occurs,by default,when the primary line module returns to an operational status?() A.The primary line module is inactive for five minutes and then becomes active.B.The primary line module is in standby mode,while the spare line module remains active.C.The primary line module becomes active immediately and the spare line module becomes inactive.D.The primary and spare line modules are active for five minutes,after which time the spare line module becomes inactive.

The certificate of inspection of a vessel will specify the ______.A.number of licensed personnel required on boardB.maximum load line draftC.maximum water depth for drillingD.next date for an inclining experiment

You are loading in the winter in Albany,N.Y.,for a voyage to a port governed by the tropical load line mark. Which of the following statements is TRUE? (Hydrometer reading in Albany is 1.000)A.You may not exceed the winter load line mark when you finish loading except for the burnout to seaB.You may calculate the burnout necessary to reach the tropical zone and load extra cargo to compensateC.The freshwater allowance and burnout to sea may be subtracted from the required freeboard in AlbanyD.You may load to the winter mark less the fresh water allowance if you will be at the tropical mark upon arrival in the tropical zone

The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

To determine the number of certificated lifeboatmen required on a vessel,you should check the ______.A.Load Line CertificateB.Certificate of InspectionC.Safety of Life at Sea CertificateD.operations manual

To determine the number of inflatable liferafts required on a vessel,you should check the ______.A.Load Line CertificateB.SOLAS CertificateC.Stability LetterD.Certificate of Inspection

To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the ______.A.load line certificateB.Operations ManualC.Safety of Life at Sea CertificateD.Certificate of Inspection

The primary purpose of the concerned group and individuals is to ________the greenhouse gases and pollutants.A.depositB.decreaseC.deviationD.deprival

What is the primary purpose of SMB Smart Designs? ()A、 assists in locating appropriate resourcesB、 provides training on products, tools, and solutionsC、 provides a direct support path for any partner issueD、 provides validated commercial solutionsE、 provides a step-by-step outline of implementation tasks required

how many neighbor commands required for establish ibgp peers in 4 routers?

Which statement describes the FIP function of the FCoE Initiation Protocol? ()A、 It is required to establish the point-to-point FCoE links with the first switch in the path.B、 It is required to establish the point-to-point FCoE links with any switch across multiple Ethernet segments.C、 It is not used to build the FCoE links.D、 It is used to ensure lossless transport.

What is the optimize timer on an RSVP-signaled Label-Switched Path (LSP)?()A、the time it takes to identify the optimal path for the LSPB、the interval at which the ingress router recalculates the LSP’s pathC、the time the ingress router takes to establish the primary pathD、the maximum number of times the ingress router tries to establish the primary path

What is the optimize timer on an RSVP-signaled Label-Switched Path (LSP)?()A、The time it takes to identify the optimal path for the LSP.B、The interval at which the ingress router recalculates the LSP's path.C、The time the ingress router takes to establish the primary path.D、The maximum number of times the ingress router tries to establish the primary path.

单选题The certificate of inspection of a vessel will specify the ().Anumber of licensed personnel required on boardBmaximum load line draftCmaximum water depth for drillingDnext date for an inclining experiment

单选题What is the primary purpose of SMB Smart Designs? ()A assists in locating appropriate resourcesB provides training on products, tools, and solutionsC provides a direct support path for any partner issueD provides validated commercial solutionsE provides a step-by-step outline of implementation tasks required

单选题What is the primary purpose of a splint applied in first aid?()AControl bleedingBReduce painCImmobilize a fractureDReset the bone

单选题Which is the summer load waterline on the load waterline mark?().AThe first line at the bottomBThe second line from the bottomCThe third line from the bottomDThe fourth line from the bottom

单选题The International Load Line Certificate is a document indicating () of the various load lines of the vessel.AdecksBcabinsCholdsDpositions

单选题What is the optimize timer on an RSVP-signaled Label-Switched Path (LSP)?()AThe time it takes to identify the optimal path for the LSP.BThe interval at which the ingress router recalculates the LSP's path.CThe time the ingress router takes to establish the primary path.DThe maximum number of times the ingress router tries to establish the primary path.

单选题The primary line module has failed and the spare line module is nowactive.What occurs,by default,when the primary line module returns to an operational status?()AThe primary line module is inactive for five minutes and then becomes active.BThe primary line module is in standby mode,while the spare line module remains active.CThe primary line module becomes active immediately and the spare line module becomes inactive.DThe primary and spare line modules are active for five minutes,after which time the spare line module becomes inactive.

单选题The holding power of an anchor is the().Amaximum sustained vertical load an anchor will resist before draggingBmaximum sustained horizontal load an anchor will resist before draggingCmaximum sustained vertical load an anchor will resist before the mooring line breaksDmaximum sustained horizontal load an anchor will resist before the mooring line breaks

单选题The agency which assigns load lines and issues Load Line Certificates is the ().Athe Bureau of ShippingBSecretary of CommerceCthe CustomsDMSA or Coast Guard

单选题What is the optimize timer on an RSVP-signaled Label-Switched Path (LSP)?()Athe time it takes to identify the optimal path for the LSPBthe interval at which the ingress router recalculates the LSP’s pathCthe time the ingress router takes to establish the primary pathDthe maximum number of times the ingress router tries to establish the primary path

单选题Which is the winter load waterline on the load waterline mark?().AThe line over the summer load waterlineBThe line above the tropical load waterlineCThe line below the tropical load waterlineDThe line between the summer and the winter north Atlantic load waterline

单选题The document that certifies the correctness of the load line marks on a ship is called the ().ACertificate of InspectionBLoad line certificateCCertificate of DocumentationDSOLAS Certificate

问答题how many neighbor commands required for establish ibgp peers in 4 routers?