单选题Four ()are needed to work this heavy derrick.AwinchesBgearsCwindlassDcranes
单选题
Four ()are needed to work this heavy derrick.
A
winches
B
gears
C
windlass
D
cranes
参考解析
解析:
暂无解析
相关考题:
Please arrange for the workers to do the ______ work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.A.lashingB.shiftingC.liftingD.Tallying
Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift?A.The discharge is slow due to the size of the cargo and all the cranes working togetherB.The cargo discharge can be accomplished with controlled pendulationC.The cargo discharge can be performed in port or at anchorD.The cranes enable the handling of heavy cargos without shoreside assistance
The Charterers to have the right to __________ of all winches,derricks including heavy lift gear and/or cranes to their full capacity.A.Freely useB.Use freelyC.Free useD.Use free
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels ________.A.A centerline crane can never be operated in tandemB.One crane is able to work one end of two adjacent hatchesC.These cranes are more economical and weigh less than outboard-mounted cranesD.One crane is able to work both sides of the ship
Even in a highly modernized country,manual work is still needed.A:expressive B:physicalC:exaggerated D:dubious
Even in a highly modernized country,manual work is still needed.A:physical B:mentalC:natural D:hard
他们工作四小时,休息八小时。()A、They work four hours and have four hours for rest.B、They work eight hours and have four hours for rest.C、They work four hours and have eight hours for rest.D、They work eight hours and have eight hours for rest.
The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires
集装箱是由龙门吊装卸。()A、Containers are loaded and discharged by gantry cranes.B、Cases are loaded and discharged by gantry cranes.C、Cases are loaded and discharged by heavy derricks.D、Containers are loaded and discharged by heavy derricks.
单选题Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().AA centerline crane can never be operated in tandemBOne crane is able to work one end of two adjacent hatchesCThese cranes are more economical and weigh less than outboard-mounted cranesDOne crane is able to work both sides of the ship
单选题For occasional heavy loads, two cranes can be arranged to work together. The operating () for deck crane motors may be hydraulic electric.AprincipleBmediumCinstructionDvoltage
单选题Power is defined as the ().Arate of doing workBamount of force needed to overcome frictionCamount of work accomplishedDdistance through which an object is moved
单选题After a whole day’s heavy work, the old worker returned home, ______.Abeing hungry and exhausting Bhungry and exhaustedCbeing hungry and exhaustedDhungry and exhausting
单选题集装箱是由龙门吊装卸。()AContainers are loaded and discharged by gantry cranes.BCases are loaded and discharged by gantry cranes.CCases are loaded and discharged by heavy derricks.DContainers are loaded and discharged by heavy derricks.
单选题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()AThe discharge is slow due to the size of the cargo and all the cranes working togetherBThe cargo discharge can be accomplished with controlled pendulationCThe cargo discharge can be performed in port or at anchorDThe cranes enable the handling of heavy cargos without shoreside assistance
单选题After a whole day’s heavy work, the old worker returned home, _____.Abeing hungry and exhaustingBhungry and exhaustedCbeing hungry and exhaustedDhungry and exhausting
单选题他们工作四小时,休息八小时。()AThey work four hours and have four hours for rest.BThey work eight hours and have four hours for rest.CThey work four hours and have eight hours for rest.DThey work eight hours and have eight hours for rest.
单选题Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.AlashingBshiftingCliftingDtallying
单选题Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.Athe work of using lines and chains to secure the cargo on boardBthe lash workCthe work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingDthe lashing work
单选题The four-stroke cycle is so called because it takes () to complete the processes needed to convert the energy in the fuel into work.Atwo strokes of the pistonBfour strokes of the pistonCone revolution of the crankshaftDfour revolutions of the crankshaft
单选题Robots ______ more heavy work for us in the future.Awill doBdidChave doneDwere doing