单选题A system administrator will be migrating a server from AIX 5.1 to AIX 5.2 and is uncertain if the application running on the server will function properly after the migration. What is the fastest way to return to the previous AIX level if the application does not work?()AUse base media to restore system to AIX 5.1.BUse an alt_disk_install and boot back to the AIX 5.1 rootvg.CMake a mksysb of the original AIX to restore back to the AIX 5.1 level.DPerform the AIX 5.2 upgrade using update_all with the commit option and reject filesets to return to AIX 5.1.
单选题
A system administrator will be migrating a server from AIX 5.1 to AIX 5.2 and is uncertain if the application running on the server will function properly after the migration. What is the fastest way to return to the previous AIX level if the application does not work?()
A
Use base media to restore system to AIX 5.1.
B
Use an alt_disk_install and boot back to the AIX 5.1 rootvg.
C
Make a mksysb of the original AIX to restore back to the AIX 5.1 level.
D
Perform the AIX 5.2 upgrade using update_all with the commit option and reject filesets to return to AIX 5.1.
参考解析
解析:
暂无解析
相关考题:
An administrator has received an update CD with the latest technology level for AIX 5.3. The current operating system level of the sever is at base AIX5.3. What action needs to be taken to apply the new technology level to the server()A、Run smit update_allB、Run smit install_allC、Boot from the installation mediaD、Run the update_all command from the mounted CD
An administrator has received an update CD with the latest technology level for AIX 5.3. The current operating system level of the server is at base AIX 5.3. What action needs to be taken to apply the new technology level to the server?()A、Run smit update_allB、Run smit install_allC、Boot from the installation mediaD、Run the update_all command from the mounted CD
A system administrator will be migrating a server from AIX 5.1 to AIX 5.2 and is uncertain if the application running on the server will function properly after the migration. What is the fastest way to return to the previous AIX level if the application does not work?()A、Use base media to restore system to AIX 5.1.B、Use an alt_disk_install and boot back to the AIX 5.1 rootvg.C、Make a mksysb of the original AIX to restore back to the AIX 5.1 level.D、Perform the AIX 5.2 upgrade using update_all with the commit option and reject filesets to return to AIX 5.1.
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() A、APV features are not supported for some legacy POWER4 adaptersB、APV will require the most current maintenance level for AIX 5.2C、APV features will require that legacy POWER4 adapters be updated with new microcodeD、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A、Purchase a 4-way p630 to compensate for not using SMT.B、Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C、Purchase the p5-550 server and install AIX 5.2 and enable SMT.D、Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()A、Use rsync to synchronize the data across servers.B、Use exportvg and importvg to move the data to the target system.C、Use NFS to copy the data from the source system to the target system.D、Backup the data from the source system and restore to the target system.
A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()A、/usr/bin/errmsg "System upgraded to AIX 5.2"B、/usr/bin/errlog "System upgraded to AIX 5.2"C、/usr/bin/errupdate "System upgraded to AIX 5.2"D、/usr/bin/errlogger "System upgraded to AIX 5.2"
An administrator plans to use bootable AIX media to boot a system into maintenance mode. The system is running AIX 5.3 TL09 with a 64-bit kernel. The administrator has a selection of media available. Which media should the administrator use?()A、Any AIX bootable media, providing it is a 64-bit variantB、Any AIX bootable media, providing it is AIX 5.1 or laterC、Any AIX 5.3 bootable media, providing it is TL09 or laterD、Any AIX 6.1 bootable media, providing it is TL02 or later
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()A、Run without recompiling on AIX 5.3B、Relink to the 32-bit kernel in order to run the applicationC、Recompile to run on AIX 5.3 because the libraries are in different locationsD、Recompile 32-bit applications because the compiler flags and versions have changed
A system administrator needs to quickly migrate a machine from AIX 5.1 to AIX 5.2. The administrator will only be allowed enough downtime to reboot the machine. Which installation method should be used to accomplish this task?()A、Perform a migration installation during the reboot process.B、Perform an alternate disk installation and migration using NIM.C、Copy the /usr directory from another 5.2 server to this server.D、Perform an update_all install from 5.2 media to take effect on reboot.
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()A、Verify the ISV application runs on AIX 5.2B、Power4 to POWER5 upgrades are not supported without a application recompileC、Check the placement and size of the boot logical volume and disk space requirements on the S85D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()A、Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. B、Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. C、Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. D、Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
A system administrator will use a mksysb from a uniprocessor microchannel server running AIX 5.1 to install a multiprocessor chrp server. What else is required?()A、A 5.1 AIX base media setB、A 5.1 Additional Device Driver CDC、A mksysb of the multiprocessor chrp serverD、A savevg of the uniprocessor microchannel server
A system administrator has a mksysb on tape of an AIX 5.2 machine and needs to install it on a different server. How can this be accomplished?()A、Install the base AIX from 5.2 media and then install the mksysb overtop.B、Mount the tape and use the tar command to install AIX and the rest of the contents of the rootvg.C、Insert the mksysb tape and a 5.2 base media CD and then boot to maintenance mode and initiate the install.D、Install AIX 5.2 from base media and then perform an update_all install from the mksysb tape of the original machine.
单选题A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()A/usr/bin/errmsg System upgraded to AIX 5.2B/usr/bin/errlog System upgraded to AIX 5.2C/usr/bin/errupdate System upgraded to AIX 5.2D/usr/bin/errlogger System upgraded to AIX 5.2
单选题Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()AVerify the ISV application runs on AIX 5.2BPower4 to POWER5 upgrades are not supported without a application recompileCCheck the placement and size of the boot logical volume and disk space requirements on the S85DAIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
单选题Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()AApply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. BPurchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. CVerify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. DVerify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
单选题An administrator has received an update CD with the latest technology level for AIX 5.3. The current operating system level of the server is at base AIX 5.3. What action needs to be taken to apply the new technology level to the server?()ARun smit update_allBRun smit install_allCBoot from the installation mediaDRun the update_all command from the mounted CD
单选题A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()APurchase a 4-way p630 to compensate for not using SMT.BPurchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.CPurchase the p5-550 server and install AIX 5.2 and enable SMT.DSuspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
单选题A system administrator will use a mksysb from a uniprocessor microchannel server running AIX 5.1 to install a multiprocessor chrp server. What else is required?()AA 5.1 AIX base media setBA 5.1 Additional Device Driver CDCA mksysb of the multiprocessor chrp serverDA savevg of the uniprocessor microchannel server
单选题An administrator has received an update CD with the latest technology level for AIX 5.3. The current operating system level of the sever is at base AIX5.3. What action needs to be taken to apply the new technology level to the server()ARun smit update_allBRun smit install_allCBoot from the installation mediaDRun the update_all command from the mounted CD
单选题A system administrator needs to quickly migrate a machine from AIX 5.1 to AIX 5.2. The administrator will only be allowed enough downtime to reboot the machine. Which installation method should be used to accomplish this task?()APerform a migration installation during the reboot process.BPerform an alternate disk installation and migration using NIM.CCopy the /usr directory from another 5.2 server to this server.DPerform an update_all install from 5.2 media to take effect on reboot.
单选题Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?()AAPV features are not supported for some legacy POWER4 adaptersBAPV will require the most current maintenance level for AIX 5.2CAPV features will require that legacy POWER4 adapters be updated with new microcodeDThe Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
单选题A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()AUse rsync to synchronize the data across servers.BUse exportvg and importvg to move the data to the target system.CUse NFS to copy the data from the source system to the target system.DBackup the data from the source system and restore to the target system.
单选题A system administrator has a mksysb on tape of an AIX 5.2 machine and needs to install it on a different server. How can this be accomplished?()AInstall the base AIX from 5.2 media and then install the mksysb overtop.BMount the tape and use the tar command to install AIX and the rest of the contents of the rootvg.CInsert the mksysb tape and a 5.2 base media CD and then boot to maintenance mode and initiate the install.DInstall AIX 5.2 from base media and then perform an update_all install from the mksysb tape of the original machine.
单选题A system administrator will be migrating a server from AIX 5.1 to AIX 5.2 and is uncertain if the application running on the server will function properly after the migration. What is the fastest way to return to the previous AIX level if the application does not work?()AUse base media to restore system to AIX 5.1.BUse an alt_disk_install and boot back to the AIX 5.1 rootvg.CMake a mksysb of the original AIX to restore back to the AIX 5.1 level.DPerform the AIX 5.2 upgrade using update_all with the commit option and reject filesets to return to AIX 5.1.
单选题Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()ARun without recompiling on AIX 5.3BRelink to the 32-bit kernel in order to run the applicationCRecompile to run on AIX 5.3 because the libraries are in different locationsDRecompile 32-bit applications because the compiler flags and versions have changed
单选题An administrator plans to use bootable AIX media to boot a system into maintenance mode. The system is running AIX 5.3 TL09 with a 64-bit kernel. The administrator has a selection of media available. Which media should the administrator use?()AAny AIX bootable media, providing it is a 64-bit variantBAny AIX bootable media, providing it is AIX 5.1 or laterCAny AIX 5.3 bootable media, providing it is TL09 or laterDAny AIX 6.1 bootable media, providing it is TL02 or later