单选题A sales rep is creating a proposal containing Storwize V7000 which will be integrated in to an IBM-only storage and server environment. The client ultimately needs better efficiency across theirentire data center. What management interface should the sales rep include in the proposal?()AStorwize V7000 Management GUI BTivoli Storage Productivity Center CIBM Systems Director Storage Control DSystem Storage Productivity Center (SSPC)
单选题
A sales rep is creating a proposal containing Storwize V7000 which will be integrated in to an IBM-only storage and server environment. The client ultimately needs better efficiency across theirentire data center. What management interface should the sales rep include in the proposal?()
A
Storwize V7000 Management GUI
B
Tivoli Storage Productivity Center
C
IBM Systems Director Storage Control
D
System Storage Productivity Center (SSPC)
参考解析
解析:
暂无解析
相关考题:
_____ is a formal invitation containing a scope of work which seeks a formal response (proposal) describing both methodology and compensation to form. the basis of a contract.A Request for proposalB Invitation to bidC Request for quotationD Intention for bidE None of the above.
138 _____ is a formal invitation containing a scope of work which seeks a formal response (proposal) describing both methodology and compensation to form. the basis of a contract.A. Request for proposalB. Invitation to bidC. Request for quotationD. Intention for bidE. None of the above
The sales representative suggested an initial meeting to discuss the proposal as soon as the betaproduct is ready, ( ) that might be.A. no matterB. whichC. wheneverD. what
A customer is performing a cost justification of advanced software functions for several disksubsystem vendors. Which of the following software features of the Storwize V7000 arechargeable?()A、Easy Tier, FlashCopy B、FlashCopy, External Virtualization C、Metro/Global Mirror, Thin Provisioning D、External Virtualization, Metro/Global Mirror
A sportswear company recently had a visit from a sales rep of a well-known computer vendor. The sales rep gave a presentation on the advantages of VPAR and NPAR. Which of the following companies made this presentation?()A、HPB、IBMC、SUND、Dell
A customer has purchased a new IBM Storwize V7000 storage array and is considering an IPbased DR replication solution that is cost-optimized and provides a near instant recovery option fortheir Microsoft Exchange application and server. The backup site is 30 kilometers away. Whatwould be the best choice for replication?()A、Storwize V7000 Metro MirrorB、Tivoli Storage ManagerFastBackC、Storwize V7000 Reverse FlashCopyD、Tivoli Storage Productivity Center for Replication
Which of the following is the maximum number of expansion enclosures that can be attached to anIBM Storwize V7000 Control Enclosure?()A、 6B、 9C、 12D、 18
Which of the following statements best describes a Pre-sales Solution Assurance Review?()A、An account team proposal reviewB、An installation planning meetingC、A solution design development methodologyD、A technical inspection of a completed solution design
What types of host connectivity are available on the Storwize V7000?()A、Fibre Channel and SAS B、Fibre Channel and iSCSI C、Fibre Channel, iSCSI and SAS D、Fibre Channel, iSCSI and InfiniBand
Which of the following is the lowest cost enterprise class IBM Storage System that can support anExchange 2010 solution?()A、DS5100 B、Storwize V7000 C、DS8700 D、XIV system
When does an MDisk become managed by an IBM Storwize V7000?()A、when a volume is created using thatMDiskB、when theMDisk is first imported into the clusterC、when the LUN is first presented to theStorwize V7000D、when theMDisk is assigned to a storage pool
A System x sales specialist is creating a proposal for a Unix-installed account. The customer is looking to migrate several business-critical applications onto Linux running on Intel. Which of the following should help IBM meet the customer’s requirements?()A、Propose VMware with Linux on Intel as a solution.B、Provide a special bid on the System x servers.C、Include migration services within the proposal.D、Provide a warranty offering with guaranteed fix levels.
Which of the following IBM storage products allows for 960 TB (raw) in one standard IBM rack?()A、XIV system B、DS5300 C、DS8700 D、Storwize V7000
A Sales Specialist is proposing an IBM System x3950 VMware solution for server consolidation. Which of the following solutions should the Sales Specialist include in the proposal?()A、SteelEye for optimal performance.B、Integrated Tape Drives for backup.C、Software Distribution Premium Edition.D、IBM TotalStorage DS3000/DS4000 for a shared disk environment.
A sales rep is creating a proposal containing Storwize V7000 which will be integrated in to an IBM-only storage and server environment. The client ultimately needs better efficiency across theirentire data center. What management interface should the sales rep include in the proposal?()A、Storwize V7000 Management GUI B、Tivoli Storage Productivity Center C、IBM Systems Director Storage Control D、System Storage Productivity Center (SSPC)
The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()A、IBM DS8700 B、IBM N6040 C、IBM Storwize V7000 D、IBM XIV Storage System
Which IBM storage products allows for 960 TB (raw) in one standard IBM rack of the following?()A、XIV systemB、DS5300C、DS8800D、Storwize V7000
The customer has an IBM Enterprise Storage Server 800 coming off lease this year. Themaintenance charges are becoming very expensive and they are looking at a new storage solutionto attach to their mainframe environment. Which of the following solutions would be most costeffective?()A、DS8300B、DS8700 C、Storwize V7000 D、XIV Storage System
You work as a network Exchange administrator at Company.com.The Company.com network currently consists of a single Active Directory forest containing a single domain named Company.com.The Company.com organization makes use of Microsoft Exchange Server 2010 as their messaging solution.During the course of the week you receive an instruction from the CIO to stop internal users from sending e-mail messages containing the words "Classified Data" to users outside the organization. What should you do?()A、You should consider creating a message classification.B、You should consider creating a Transport rule.C、You should consider creating a Send connector.D、You should consider creating a managed folder mailbox policy.
单选题What are the storage component areas utilized in the IBM Storwize V7000?()AVolumes, Extents, and LUNsBVolumes, Storage Pools, and Managed DisksCVirtual Disk Groups, Managed Disks, and LUNsDVirtual Disks, Manage Disk Groups, and Managed Disks
单选题A customer has purchased a new IBM Storwize V7000 storage array and is considering an IPbased DR replication solution that is cost-optimized and provides a near instant recovery option fortheir Microsoft Exchange application and server. The backup site is 30 kilometers away. Whatwould be the best choice for replication?()AStorwize V7000 Metro MirrorBTivoli Storage ManagerFastBackCStorwize V7000 Reverse FlashCopyDTivoli Storage Productivity Center for Replication
单选题A customer is cost-justifying advanced software functions of several disk subsystem vendors.Which of the following software features of the Storwize V7000 are provided at no charge?()AEasy Tier, FlashCopy, Thin Provisioning BEasy Tier, External Virtualization, FlashCopy CEasy Tier, Metro/Global Mirror, Thin Provisioning DMetro/Global Mirror, FlashCopy, External Virtualization
单选题What is the correct stage in the sales process for a Pre-Sales Technical Delivery Assessment (TDA)? ()ABefore the first solution design meeting with the customerBAfter the solution design proposal is submitted to manufacturing for reviewCOnce the customer has supplied the solution design specifications to the sales teamDAfter the solution design is completed and before the proposal is submitted to the customer
单选题Which of the following statements best describes a Pre-sales Solution Assurance Review?()AAn account team proposal reviewBAn installation planning meetingCA solution design development methodologyDA technical inspection of a completed solution design
问答题Practice 7 ● You are the Manager of the Marketing and Sales Department of a Computer Manufacturing Firm. The Managing Director has asked you to prepare a proposal for sales promotion of the new product—computer PC06. ● Write a proposal for the Managing Director: ● giving the reasons for writing the proposal ● suggesting the principal strategy for the proposed promotional activities ● giving the categories of promotional activity that the policy should cover ● explaining the promotional activities will be within the total proposed budget and benefit the promotional activities would bring. ● Write 200-250 words on the separate answer paper provided.