单选题The winch is liable()worn-out in this way.AgettingBto getCto have gotDfor getting
单选题
The winch is liable()worn-out in this way.
A
getting
B
to get
C
to have got
D
for getting
参考解析
解析:
暂无解析
相关考题:
When items to be purchased for a project are specified by performance characteristics:A paperwork is greatly reducedB the supplier is held liable for the operation of the itemC the supplier is held liable for the maintenance of the itemD the supplier is held liable for that the item meets the design, dimensions, and tolerance specifications.E B and D only
154 When items to be purchased for a project are specified by performance characteristics: A. paperwork is greatly reducedB. the supplier is held liable for the operation of the itemC. the supplier is held liable for the maintenance of the itemD. the supplier is held liable for that the item meets the design, dimensions, and tolerance specifications.E. B and D only
Where both the carrier and the actual carrier are liable for compensation,they shall ______ be liable within the scope of such liability.A.separatelyB.jointlyC.severallyD.jointly and severally
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor ______.A.when the line pull reaches the rated winch capacityB.after the line pull exceeds the rated winch capacityC.after a short build-up of torqueD.immediately
材料:While berthed alongside in Tenerife,the cruise ship Arcadia was carrying out a lifeboat drill.One lifeboat was successfully launched and as it was being recovered,the winch hoisting it failed.The lifeboat was still connected to the falls and it dropped back into the sea. To investigate what had happened,the crew had to wind the falls back onto the winch drum.The lifeboat was disconnected while the crew tried to restart the winch.They were unsuccessful because of a fault on the hand crank cutout switch.The crew then attempted to wind the falls back on using the hand crank,but because of the time and effort involved,the cutout switch was bypassed and power restored to speed up the operation.The crank handle was left in place. The winch was started.It began to turn and so too did the handle which hit one of the crew over the head.The investigation found that the winch failed in the first place because the oil used in the winch gearbox was not one recommended.It was too viscose and would have prevented the coupling locking mechanism from operating correctly.问题:It was the fault on the ________ that caused the failure to recover the lift boatA.crank handleB.hand crank cutout switchC.power systemD.fallsIt was the ________ that hit the crewmember on his head.A.fallsB.hand crank cutout switchC.crank handleD.winch drumThe cause of the accident was that ________.A.the oil used in the winch gearbox was too viscoseB.the winch drum was connected with the fallsC.the life boat was too heavyD.the bypass to the cutout switch was misused by the crewThe lesson from this accident is that ________.A.seafaring is not all about facing unforeseen situationsB.it is not necessary to wear hard hats to prevent sore headsC.the wrong oil can not have serious repercussionsD.do not start lifeboat winch motors with the crank handle in place请帮忙给出每个问题的正确答案和分析,谢谢!
2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.
头缆上车!()A、Put head line on winch!B、Put stern line on winch!C、Hold on head line!D、Heave in head line.
单选题A mechanical davit is designed to automatically().Aposition the boat at the embarkation stationBlift the boat off the inboard chocksCenergize the winch for the fallsDset the brake on the winch
单选题(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.AThe winch motorBThe band brakeCThe winch barrelDThe anchor capstan
单选题The limit switches on a ships survival-craft winch system().Astop the winch just before the craft reaches the final stowage positionBlimit the amount of cable on the drumClimit the ascent rateDstop the winch in case the craft weighs too much
单选题The clutch band of a constant tensioning mooring winch must be set up tight enough to drive the winch drum and should slip only when ().Aexcessive loads are placed on the winchBminimum pull is being exerted by the winchCautomatic operation of the winch is desiredDwire is being retrieved at the maximum rate
单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().Awhen the line pull reaches the rated winch capacityBafter the line pull exceeds the rated winch capacityCafter a short build-up of torqueDimmediately
单选题Limit switches().Acontrol the descent rate of a lifeboatBcontrol the ascent rate of a lifeboatCcut off power to the winch when the lifeboat nears the final stowed positionDcut off power to the winch when the lifeboat reaches the davit bumpers
单选题When retrieving the survival craft,the winch operator should stop the winch and check().Athat all personnel are seated in the craftBthat the cable has not jumped any grooves on the drumCwhich way the wind is blowingDthe hydraulic fluid level before lifting
单选题Where the master has not disclosed to the suppliers of necessaries that under an existing time-charter the Charterer is liable for the particular disbursements in question,()will be liable to such suppliers to that extent.AThe masterBThe ChartererCThe ShipownerDThe cargo owner