单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()APower 710BPower 720CPower 730DPower 740

单选题
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
A

Power 710

B

Power 720

C

Power 730

D

Power 740


参考解析

解析: 暂无解析

相关考题:

A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()A.A VIO server requires a dedicated LHEA port.B.There is a limit of 32 LPARs per virtual LAN.C.Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.D.Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

Which two features prevent routing loops between the OSPF sites of a customer when the sites aremultihomed or a backdoor link is used between the sites? ()A、sham linkB、down bitC、virtual linkD、Site of OriginE、domain tag

A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()A、One 7311-D20 drawerB、Two 7311-D20 drawersC、Two 7311-D10 drawersD、One 7311-D10 drawers

A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()A、add twofibre HBAs to the System i and connect to the SANB、add twofibre HBAs to the System i and connect to the Windows ServersC、add twofibre HBAs to the System i and connect to the System i using VIOSD、add two SAS HBAs to the Systemi array and connect directly to the DS5300

A customer needs a new Microsoft Windows 2003 Server.  They are running an application that requires substantial memory.  They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache.  Which of the following is the minimum configuration to satisfy the customer’s requirements?()A、x445 with four Xeon MP processors and 8GB of memoryB、x445 with four Xeon MP processors and 16GB of memory in a single SMP moduleC、x445 with four Xeon DP processors and 16GB of memory in a single SMP moduleD、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory

A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A、IBM i EditionB、Express EditionC、Standard EditionD、Enterprise Edition

A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()A、TSMB、PSSPC、WebSMD、LoadLeveler

A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform Live Partition Mobility between the two systems.B、Move the boot disks from the old system to the new system.C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A、Power 710B、Power 720C、Power 730D、Power 740

A customer needs a new database server.  The database application has a high memory overhead but does not benefit from 8-way processing.  They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory.  Which of the following will satisfy the customer’s requirements?()A、x445 with four Xeon DP processors and 16GB of memory in a single SMP moduleB、x445 with four Xeon MP processors and 16GB of memory in a single SMP moduleC、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memoryD、x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory

A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()A、Metro/Global MirrorB、Metro MirrorC、Global CopyD、Global Mirror

What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()A、Metro MirrorB、FlashCopyC、Global MirrorD、Snapshot

A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()A、compatibility of copy functionsB、difference in capacities in the two systemsC、cache size discrepancies between the two systemsD、the necessity of using two storage management products

A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC).  Which statement best describes the way to minimize the impact of data migration on the production environment()A、the production environment does not require an outageB、the production environment requires an outage to install the SVCC、the production environment requires an outage to install the DS8700D、the production environment requires an outage to remove the EMC systems

A customer would like to implement an IBM System Storage DS8000 solution that requires 225 TB raw capacity. They are convinced that 450 GB is the optimum size for their business applications. There is limited space available for additional machines in the data center.  Which solution meets best this requirement()A、DS8700 system with three framesB、DS8800 system with threeframeC、DS8700 system with two framesD、DS8800 system with two frames

A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()A、A VIO server requires a dedicated LHEA port.B、There is a limit of 32 LPARs per virtual LAN.C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

A customer is adding a new p5 machine to their environment.  The machine will host several DB2 partitions running AIX 5.2.  They currently have two SAN directors and an IBM ESS.  The SAN design allows for concurrent maintenance.  What is required on each partition to attach to the SAN?()A、A minimum of two HBAs; the customer will need to download SDDB、A minimum of four HBAs; the customer will need to download SDDC、A minimum of two HBAs; the customer will need to configure MPIOD、A minimum of four HBAs; the customer will need to configure MPIO

A customer RFP requires installation of an open system SAN and migration of 40 TB currently residing on ten UNIX servers (on internal server disk). The Service Level Agreement (SLA) requires no more than five minutes per week of planned downtime for backup.  Which IBM System Storage solution is the most cost effective()A、an IBM System Storage DS8700 with LTO tape driveB、an IBM System Storage DS8700 with FlashCopy ManagerC、an IBM XIV Storage SystemD、an IBM XIV Storage System with SAN Volume Controller

单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()AThe new system requires 1 installed processor card for the GX++ bus adapterBThe new system requires a minimum of 2 installed processor cards for the GX++ bus adapterCThe new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterDThe new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter

单选题A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()AIBM CPWBIBM rPerfCSPECint_rate2006DIDEAS International RPE2

单选题A customer requires an infrastructure to support disaster recovery of critical applications between two remote datacenters one in Tokyo and one in Beijing. The customer’s Recovery Point Objective (RPO) necessitates a six-hour window for a bandwidth of 100MB/s and a new Storage System for a total of 4TB of data. They estimate 100MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements?()AMetro MirrorBFlashcopyCGlobal MirrorDSnapshot

多选题Which two features prevent routing loops between the OSPF sites of a customer when the sites aremultihomed or a backdoor link is used between the sites? ()Asham linkBdown bitCvirtual linkDSite of OriginEdomain tag

单选题A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center.  Which solution  best meets the customer’s requirements()ADS8800 system with three framesBDS8800 system with one frameCDS8700 system with two framesDDS8800 system with two frames

单选题A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()AOne 7311-D20 drawerBTwo 7311-D20 drawersCTwo 7311-D10 drawersDOne 7311-D10 drawers

单选题A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()Acompatibility of copy functionsBdifference in capacities in the two systemsCcache size discrepancies between the two systemsDthe necessity of using two storage management products