单选题Open the bilge well cover. ()A关上压载水盖。B关上污水井盖。C打开污水井盖。D打开压载水盖。

单选题
Open the bilge well cover. ()
A

关上压载水盖。

B

关上污水井盖。

C

打开污水井盖。

D

打开压载水盖。


参考解析

解析: 暂无解析

相关考题:

President FranklinD. Roosevelt proposed a well-known policy called() to save the economic situation. A.the Open Door PolicyB.the New DealC.Good Neighbor PolicyD.the“Big Stick”

What can be used to cover bilge before loading?

Accidental flooding of the engine room bilges by the bilge main is prevented by( ).A.stop-check valves installed in the bilge suction manifoldsB.using a positive displacement reciprocating bilge pumpC.installing educators in all bilge rose boxesD.installing a swing check before each bilge valve

explain bilge and ballast pumping through ejector ?

The purpose of a bilge well is to ______.A.Afford access to the shell through the double bottomsB.Collect water to be pumped outC.Provide access for the pneumercatorD.Provide a base line for sounding measurements

Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo

污水井()A、bilge wellB、bilge waterC、fresh waterD、sea water

污水井盖()A、bilge well coverB、ballast water coverC、fresh water coverD、sea water well

Open the bilge well cover. ()A、关上压载水盖。B、关上污水井盖。C、打开污水井盖。D、打开压载水盖。

Please cover the bilge cover well. ()A、请盖好污水井盖。B、请修理污水井盖。C、请盖好压载水盖。D、请盖好淡水盖。

单选题Please cover the bilge cover well. ()A请盖好污水井盖。B请修理污水井盖。C请盖好压载水盖。D请盖好淡水盖。

单选题The bilge system has been performing well; however, the aft starboard engine room bilgewell suddenly fails to be pumped outWhich of the following should be done first to determine the cause?()AOpen the bilge pump for inspectionBRemove each of the manifold valvesCRemove only the manifold valve to the affected bilge-wellDAttempt to pump out another bilge well to determine if the entire system is affected

单选题An emergency bilge pumping system is provided and should be () of the main bilge pumping system, according to the SOLAS 74 Convention.AdependentBin dependentCin seriesDin parallel

单选题Where an excessive level of contamination is detected an alarm is sounded and diverting valves are operatedThe discharging liquid is then passed to ().AoverboardBa bilge wellCa slop tankDa hot well

单选题Before loading bulk grain,bilge wells must be covered to().Aadd strength to the bilge well strainerBpermit rapid flow of water to the bilge wellsCprevent cargo sifting into the bilge wellsDprevent oil,water,or other liquid from reaching the cargo

单选题Accidental flooding of the engine room bilges by the bilge main is prevented by ().Astop-check valves installed in the bilge manifoldsBusing a positive displacement reciprocating bilge pumpCinstalling eductors in all bilge rose boxesDinstalling a swing check before each bilge valve

单选题The emergency bilge suction or bilge () is used to prevent flooding of the ship.Ainjection valveBrelief valveCdischarge valveDinlet filter

单选题The emergency bilge suction or bilge injection valve is used to prevent () of the ship.AproceedingBoverloadingCcollisionDflooding

单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()Afailure of the proper operation of emergency generatorBinsulation of piping including exhaust pipes in engine room contaminated by oilCimproper operation of bilge of bilge of bilge pumping arrangementsDdamaged sanitary pump

单选题An oil water monitor is required in order to measure ().Athe oil content in waterBthe water content in fuel oilCthe water level in bilge wellDthe oil level in bilge well

单选题According to the SOLAS convention, the bilge water system ()Amust connect the bilge well suction directlyBshould not pump out the water accumulated in the cargosCshould not used for emergency drainage in case of ship collisionDshould connect to the fire fighting system directly

单选题If one of the bilge system manifold valves does not properly seat, the ()Abilge well connected to that valve, plus the second bilge well being pumped will be completely emptiedBbilge system will lose vacuum and prevent the other bilges from being pumped outCbilge well aft connected to that valve will siphon its contents to the forward bilge wellsDdischarge pressure will be too high

单选题When fueling has been completed().Athe fuel tank fill pipe should be left open to allow vapors to vent from the tankBthe engine should be started immediately to prevent vapor lock in the fuel lineCall hatches should be opened and all compartments should be ventilatedDopen the fuel line and drain a small amount of gasoline into the bilge to clear the line of sediment

单选题You are unable to pump out the aft starboard engine room bilge well that is fouled, with one foot of water over the top of the bilge well, what actionshould be carried out?()ASend the wiper into the well with only a scoop and pailBRemove the bilge manifold valve and attempt to back flush the lineCSimultaneously operate all available bilge pumpsDIt is only necessary to transfer half the contents of a drum of degreaser into the bilge well

单选题If water is rising in the bilge of a lifeboat,you should FIRST().Aabandon the survival craftBcheck for cracks in the hullCshift all personnel to the sternDcheck the bilge drain plug

单选题The purpose of a bilge well is to().Aafford access to the shell through the double bottomsBcollect water to be pumped outCprovide access for the pneumercatorDprovide a base line for sounding measurements

单选题A bilge suction line,in a fishing vessel with more than 16 individuals aboard,must have a strainer with an open area not less than how many times the open area of the suction line?()AoneBtwoCthreeDfour