单选题A diesel generator has just been paralleled with an AC turbo-generator, but the load can not be properly divided.This could be caused by()Aan incorrect diesel generator governor speed droop adjustmentBa faulty reverse power relay within the main circuit breaker assemblyCunsynchronized isochronous load distribution adjustmentsDa different speed setting on each unit
单选题
A diesel generator has just been paralleled with an AC turbo-generator, but the load can not be properly divided.This could be caused by()
A
an incorrect diesel generator governor speed droop adjustment
B
a faulty reverse power relay within the main circuit breaker assembly
C
unsynchronized isochronous load distribution adjustments
D
a different speed setting on each unit
参考解析
解析:
暂无解析
相关考题:
What are the possible techniques to be used for practicing the structure that has just been presented? ___________. A.repetitionB.substitutionC.single word promptsD.picture prompts
The certificate of pratique certifies that ______.A.the ship has no rats or mice on boardB.no quarantinable disease has been found on the vesselC.no person has died during the voyage the ship has just completedD.all the crew members have no health problem
Why does Mr. Nixson want to begin a career in the employment industry?A.The field has a lot of potential in the futureB.He has been unable to find employment elsewhereC.He has just completed a college course in that fieldD.The employment industry is the most stable in the nation
____ just six months ago, Finson’s Grill has quickly become one of the most popular restaurants in Detion.A.OpenedB.Had been openingC.Been openedD.To open
How many subnets are possible in an enterprise that has just been assigned an IPv6 prefix by itsISP?()A、65536B、256C、1024D、16777216
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()A、 Approved (APPR)B、 Waiting on Materials (WMATL)C、 Waiting to be Scheduled (WSCH)D、 Waiting on Plant Condition (WPCOND)
单选题Leaking oil seals on a diesel engine turbocharger can cause()Athe engine to run after the fuel has been securedBthe engine to over-speedCa fireDall of the above
单选题A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()A Approved (APPR)B Waiting on Materials (WMATL)C Waiting to be Scheduled (WSCH)D Waiting on Plant Condition (WPCOND)
单选题Typical marine propulsion plants include() directly coupled to the vessel’s single large-diameter, fixed-pitch propeller.Aa single, long-stroke, slow-speed, turbocharged, two-stroke diesel engineBa single, long-stroke, medium-speed, turbocharged, four-stroke diesel engineCtwo medium-speed, turbocharged, four-stroke diesel enginesDa variable-speed AC generator
单选题A DC generator is used to supply direct current in order to maintain an AC generator field and is known as a/an ()ArotorBstatorCexciterDarmature
单选题A probable cause for a turbo generator tripping out on overspeed is a sudden()Aloss of field excitationBtotal loss of loadClarge increase in loadDloss of steam pressure
单选题To check the setting of the overspeed trip on a diesel powered generator, you would use a ().AtachometerBtorsion meterCdynamometerDpony brake
单选题The power factor at which a paralleled AC generator operates is usually adjusted by the ().Aconnected loadBprime mover speedCfield excitationDgenerators rated voltage
单选题You are on watch at night in clear visibility and the vessel has just been anchored.The first thing that you should do after the anchor has been let go is to().Astop the enginesBturn off the running lights and turn on the anchor lightsCtake at least two bearings of prominent shore lightsDlower the accommodation ladder and illuminate it
单选题A diesel driven emergency generator is prevented from being paralleled with the ships service generators by ()Aan electrical interlock systemBan automatic paralleling trip switchCthe synchronizing oscilloscopeDthe reverse current relay
单选题An emergency diesel generator should automatically shut down in the event of ()Adangerous over-speedingBa loss of lube oil pressureCactivation of the fixed CO2 system for the emergency generator spaceDall of the above
单选题The sludge tank installed in the diesel engine room is used to collect() Ⅰ.sludge from the fuel oil settling tanks ad centrifuge Ⅱ.water that has been collected in the settling tankAⅠonlyBⅡ onlyCbothⅠand ⅡDneitherⅠor Ⅱ
单选题In a diesel engine, when the fuel is injected into the cylinder,()Athe piston is just coming upward from the bottom dead centerBthe piston has moved about one-fifth of the way upCthe piston has moved most of the way up and almost reached the TDCDthe piston has just past the TDC
单选题Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()ASensitivityBPowerCSpeed droopDCompensation
单选题When two AC generators are being paralleled, the breaker should be closed with the synchroscope pointer mating in the ()Aslow direction, just before the 12 o'clock positionBfast direction, just after the 12 o'clock positionCfast direction, just before the 12 o'clock positionDslow direction, just after the 12 o'clock position
单选题The certificate of pratique certifies that ().Athe ship has no rats or mice on boardBno quarantinable disease has been found on the vesselCno person has died during the voyage the ship has just completedDall the crew members have no health problem
填空题I am sure the secretary who has just been hired will prove to be an efficient (employ) ____.
单选题When paralleled, AC generators must have the same ()AfrequencyBnumber of phasesCphase rotationDAll of the above
单选题Which of the following is correct according to the passage you have just heard?AMicrosoft has been through a bruising battle with antitrust regulators.BMr. Gates’s position as the industry’s figurehead has been challenged.CThe computer industry is currently having a hard time.DMr. Gates has earned 870 billion US dollars over the last two decades.
单选题Which of the following adjustments is always required whenever the diesel engine governor oil has been drained and renewed?()Aspeed droopBcompensationCidle speed settingDload limit control