单选题Line throwing equipment should not be operated().Aduring a rain stormBin an explosive atmosphereCnear a lifeboat stationDby other than licensed officers
单选题
Line throwing equipment should not be operated().
A
during a rain storm
B
in an explosive atmosphere
C
near a lifeboat station
D
by other than licensed officers
参考解析
解析:
暂无解析
相关考题:
(b) A sale of industrial equipment to Deakin Co in May 2005 resulted in a loss on disposal of $0·3 million that hasbeen separately disclosed on the face of the income statement. The equipment cost $1·2 million when it waspurchased in April 1996 and was being depreciated on a straight-line basis over 20 years. (6 marks)Required:For each of the above issues:(i) comment on the matters that you should consider; and(ii) state the audit evidence that you should expect to find,in undertaking your review of the audit working papers and financial statements of Keffler Co for the year ended31 March 2006.NOTE: The mark allocation is shown against each of the three issues.
What is a FALSE statement concerning the line throwing appliance on a vessel ().A.A drill on its use must be held once every three monthsB.The actual firing is at the discretion of the MasterC.The auxiliary line must be of a light colorD.The auxiliary line must be at least 500m long
A liferaft which has inflated bottom-up on the water ______.A.should be righted by standing on the carbon dioxide cylinder,holding the righting straps and leaning backwardsB.should be righted by standing on the life line,holding the righting straps leaning backwardsC.will right itself when the canopy tube inflatesD.must be cleared of the buoyant equipment before it will right itself
A life preserver or buoyant work vest is required to be worn on a ship when a person is ______.A.working on the rig floorB.working over waterC.working on the pipe racksD.operating line throwing equipment
When flammable liquids are handled in a compartment on a vessel,the ventilation for that area should be ______.A.operated continuously while vapors may be presentB.operated intermittently to remove vaporsC.available on standby for immediate useD.shut down if an explosive mixture is present
Line throwing equipment should not be operated ______.A.during a rain stormB.in an explosive atmosphereC.near a lifeboat stationD.by other than licensed officers
他们应该明白不同报警信号的意义。()A、They should be clear about all fire-fighting equipment..B、They should be understood about the meaning of the different alarm signals.C、They should be clear about all life-saving equipment.D、They should be clear about the meaning of the different alarm signals.
What is one thing you should be aware of when conducting a wireless site survey?()A、 5 GHz equipment will not be able to penetrate through walls as well as 2.4 GHZ equipment.B、 2.4 GHz equipment will not be able to penetrate through walls as well as 5 GHz equipment.C、 Mounting antennas near metal objects will slightly amplify the signal.D、 When determining coverage, you should begin measuring attenuation from the middle of the room.
A server in the production environment monitors output from various sensors along an assembly line.New equipment is being added to the line that will require monitoring.The server administrator needs to add additional inputs to the server for this new equipment. Which of the following input types is MOST likely required?()A、EIDEB、SATAC、SerialD、Video
单选题On a ship,watertight doors should be operated().Aduring abandon drillBduring fire drillCweeklyDwhen the rig is being moved
单选题For a ship not on an international voyage,an approved substitute for an impulse projected rocket-type line throwing appliance is a().Aspring loaded line throwerBhand thrown buoyant lineCshoulder-type line throwing gunDheaving line
单选题If a hydraulic governor has been refilled with oil, the engine should be operated until it reaches normal temperaturethen the air should be purged, and the()Arack position should be adjustedBcompensating needle valve should be opened fully compensatingCneedle valve should be adjusted to stabilize operationDspeed limiting device should be adjusted
单选题Which of the following procedures should be carried out when a large, low-speed, diesel engine is operated with one cylinder secured?()ALubrication to the defective cylinder should be increasedBCooling water temperature to the engine should be increasedCOnly the turbocharger speed should be reducedDEngine speed should be reduced
单选题For an OSV not on an international voyage,an approved substitute for an impulse projected type line throwing appliance is a().Aspring-loaded line throwerBhand thrown buoyant lineCshoulder type line throwing gunDheaving line
单选题Air line lubricators are used in compressed air systems to lubricate ().Athe suction and discharge valvesBtools and equipment served by compressed airCair line reducing valvesDall of the above
单选题If the situation arose where it became necessary to tow a disabled vessel,which statement is TRUE concerning the towing line?().AThe towing line between the two vessels should be clear of the waterBThe towing line should be taut at all times between the vesselsCThere should be a catenary so the line dips into the waterDNone of the above
单选题他们应该明白不同报警信号的意义。()AThey should be clear about all fire-fighting equipment..BThey should be understood about the meaning of the different alarm signals.CThey should be clear about all life-saving equipment.DThey should be clear about the meaning of the different alarm signals.
单选题What is NOT a requirement for testing the line throwing appliance on a vessel? ()AThe appliance should be tested every three monthsBA regular service line should be used when testingCA regular projectile should be used when testingDAn entry about the test must be made in the Official Log Book
单选题A life preserver or buoyant work vest is required to be worn on a ship when a person is ().Aworking on the rig floorBworking over waterCworking on the pipe racksDoperating line throwing equipment
单选题Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ().AliveBdeadCexcitedDon line
单选题The ship should be operated by a company which is issued a(an)()relevant to ship.AISMBDOCCSMCDPSC
单选题Which precaution should be taken when testing a line throwing gun?()ANever remove the line from the rocketBFire it at an angle of approximately 90 degrees to the horizonCWear asbestos glovesDAll of the above
单选题Recharging a previously used cartridge-operated dry-chemical extinguisher is accomplished by().Aauthorized fire equipment servicing personnel onlyBreplacing the propellent cartridge and refilling with powderCpuncturing the cartridge seal after installationDrecharging the cartridge and refilling it with powder
单选题The line-throwing appliance provided on board ship is().Afor the saving of lifeBfor fire-fightingCfor mooring purposeDfor towing purpose
单选题A spur gear pump should be operated with the discharge valves ().Aslightly openedBthrottledCfully openedDhalfway opened
单选题The Master or person in charge on a ship shall insure that line throwing equipment is not operated().Aduring a rain stormBin an explosive atmosphereCnear a lifeboat stationDby other than senior rig personnel