判断题成本加奖金CPIF(Cost Plus Incentive Fee)合同具有激励机制。A对B错

判断题
成本加奖金CPIF(Cost Plus Incentive Fee)合同具有激励机制。
A

B


参考解析

解析: 暂无解析

相关考题:

Which of the following control types has the highest risk to the owner:A Firm fixed price (FFP)B Time and material (TM)C Cost plus fixed fee (CPFF)D Cost plus incentive fee (CPIF)E A and B only

In which of the following is the cost of risk hidden by the contractor?A Firm Fixed Price ContractB Fixed Price Plus IncentiveC Cost Plus Fixed PriceD Cost Plus Percentage of CostE A and B

Which of the following types of contracts allows the owner to transfer risk to the contractor:A cost plus incentive feeB cost sharingC firm fixed priceD cost plus fixed feeE performance guarantees

In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.A unit priceB cost plus incentive feeC cost plus fixed feeD firm fixed priceE B and D only

In which of the following contract types is it easier to change the scope of the contract:A firm fixed priceB fixed price plus incentive feeC cost plus percentage of costD letter contractE None of the above.

Which of the following types of contracts is equivalent to a cost plus contract:A Fixed firm priceB Cost reimbursableC Fixed price plus incentive feeD progress paymentsE All of the above.

Which contract type consists of - target costs profit, ceiling prices and shared ratio of risk?A Cost Plus Incentive FeeB Cost Plus Percentage of CostsC Cost Plus Fixed FeeD Firm Fixed PriceE Firm Fixed Price Plus Incentive

Which type of contract requires that the buyer keep the tightest labor/material cost control?A Cost Plus Incentive FeeB Cost Plus Percentage of CostsC Cost Plus Fixed FeeD Firm Fixed PriceE Firm Fixed Price Plus Incentive

95 Which type of contract requires that the buyer keep the tightest labor/material cost control?A. Cost Plus Incentive FeeB. Cost Plus Percentage of CostsC. Cost Plus Fixed FeeD. Firm Fixed PriceE. Firm Fixed Price Plus Incentive

103 Which contract type consists of - target costs profit, ceiling prices and shared ratio of risk?A. Cost Plus Incentive FeeB. Cost Plus Percentage of CostsC. Cost Plus Fixed FeeD. Firm Fixed PriceE. Firm Fixed Price Plus Incentive

125 Which of the following types of contracts is equivalent to a cost plus contract:A. Fixed firm priceB. Cost reimbursableC. Fixed price plus incentive feeD. progress paymentsE. All of the above

33 In which of the following contract types is it easier to change the scope of the contract:A. firm fixed priceB. fixed price plus incentive feeC. cost plus percentage of costD. letter contractE. None of the above

42 In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.A. unit priceB. cost plus incentive feeC. cost plus fixed feeD. firm fixed priceE.B and D only

98 In which of the following is the cost of risk hidden by the contractor?A. Firm Fixed Price ContractB. Fixed Price Plus IncentiveC. Cost Plus Fixed PriceD. Cost Plus Percentage of CostE. A and B

132 Which of the following contract types has the highest risk to the contractor:A. Firm fixed price (FFP)B. Time and material (TM)C. Cost plus fixed fee (CPFF)D. Cost plus incentive fee (CPIF)E. A and B only

115 In which of the following contract types is it easier to change the scope of the contract:A. firm fixed priceB. fixed price plus incentive feeC. cost plus percentage of costD. letter contractE. None of the above.

成本加酬金合同的形式主要有()。 A.成本加固定费用合同B.成本加固定比例费用合同C.最低成本加费用合同D.成本加奖金合同E.最大成本加费用合同

在非代理型CM模式的合同中,采用成本加酬金合同的具体方式是()。A、 成本加固定费用合同B、 成本加固定比例费用合同C、 成本加奖金合同D、 最大成本加费用合同

成本加酬金合同的形式主要有()A、成本加固定费用合同B、成本加固定比例费用合同C、最低成本加费用合同D、成本加奖金合同E、最大成本加费用合同

成本加酬金合同有许多形式,主要有()。A、工程成本总价合同B、成本加固定费用合同C、成本加固定比例费用合同D、成本加奖金合同E、最大成本加费用合同

下列不属于成本加酬金合同的表现形式的是()。A、成本加固定费用合同B、成本加奖金合同C、成本加固定比例费用合同D、最小成本加费用合同

成本加酬金合同有许多种形式,主要有()。A、工程成本总价合同B、成本加固定费用合同C、成本加固定比例费用合同D、成本加奖金合同E、最大成本加费用合同

成本加奖金CPIF(Cost Plus Incentive Fee)合同具有激励机制。

哪种合同类型,卖方承担的风险最大()。A、Cost plus percentage of costs:成本加成本百分比B、Cost plus fixedfee:成本加固定费C、Cost Plus Incentive Fee:成本加奖金D、Firm Fixed Price:固定总价

单选题哪种合同类型,卖方承担的风险最大()。ACost plus percentage of costs:成本加成本百分比BCost plus fixedfee:成本加固定费CCost Plus Incentive Fee:成本加奖金DFirm Fixed Price:固定总价

多选题成本加酬金合同的形式主要有()A成本加固定费用合同B成本加固定比例费用合同C最低成本加费用合同D成本加奖金合同E最大成本加费用合同

多选题成本加酬金合同有许多形式,主要有()。A工程成本总价合同B成本加固定费用合同C成本加固定比例费用合同D成本加奖金合同E最大成本加费用合同