单选题When towing astern what equipment should be stowed ready for use near the towline?()AFirst aid kitBAxe or cutting torchCFire extinguisherDChafing gear

单选题
When towing astern what equipment should be stowed ready for use near the towline?()
A

First aid kit

B

Axe or cutting torch

C

Fire extinguisher

D

Chafing gear


参考解析

解析: 暂无解析

相关考题:

A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started?A.When the towing vessel enters the fogB.When the drilling rig enters the fogC.When the towing vessel can no longer be seen from the rigD.Immediately

Which statement concerning the carriage of containers is TRUE? ______.A.The Chief Mate and Master of a container ship should have the proposed stowage plan ready for the stevedore upon arrival in portB.When stowed on deck of a break bulk ship,the bottom of the container must be evenly supported throughoutC.With tiered containers,a 40-foot container may be stowed on top of two 20-foot containersD.Deck load calculations must take into account the square footage of the entire container bottom

A tug is best positioned for towing and maneuvering on rivers and other restricted waters where wave action is limited when ______.A.directly astern and pushing the towB.towing on a hawserC.towing alongside and parallel to the vessel it is towingD.towing on the hip

A vessel towing a barge astern would show,at the stern ______.A.only a stern lightB.a towing light above the stern lightC.two towing lights in a vertical lineD.two white lights in a vertical line

A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit ______.A.the masthead lights for a towing vesselB.the lights for a vessel restricted in its ability to maneuverC.sidelights,stern light and towing lightD.All of the above

A chain bridle is used when towing astern because it ______.A.is easy to connectB.provides an effective catenary and absorbs shock due to its weightC.makes rigging a swivel unnecessaryD.prevents the tow from yawing by the drag of the chains in a seaway

What is one thing you should be aware of when conducting a wireless site survey?()A、 5 GHz equipment will not be able to penetrate through walls as well as 2.4 GHZ equipment.B、 2.4 GHz equipment will not be able to penetrate through walls as well as 5 GHz equipment.C、 Mounting antennas near metal objects will slightly amplify the signal.D、 When determining coverage, you should begin measuring attenuation from the middle of the room.

单选题A tug is best positioned for towing and maneuvering on rivers and other restricted waters where wave action is limited when().Adirectly astern and pushing the towBtowing on a hawserCtowing alongside and parallel to the vessel it is towingDtowing on the hip

单选题When towing astern,increased catenary will().Aincrease control of the towBprevent the towing vessel from going in ironsCmake the towing vessel less maneuverableDreduce shock stress on the towing hawser

单选题The cargo,when(),should be completely covered with plastic.AstowBstowingCstowedDbe stowed

单选题You see a vessel carrying a black diamond which indicates a().Avessel towing asternBbarge pushed aheadCvessel towing astern only when the length of her tow exceeds 200 metersDthis signal does not exist in international waters

单选题A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit().Athe masthead lights for a towing vesselBthe lights for a vessel restricted in its ability to maneuverCsidelights,stern light and towing lightDAll of the above

单选题A vessel towing a barge astern would show,at the stern().Aonly a stern lightBa towing light above the stern lightCtwo towing lights in a vertical lineDtwo white lights in a vertical line

单选题In astern towing,a tow span,also called the tow bar or towing arch,is used to().Ainsure that the hawser leads directly aft as it passes over the stern of the towing vesselBincrease the stability of the towing vessel by raising the hawser off the deckCreduce chafing of the towing hawserDprevent fouling of the hawser on deck gear located on the stern of the towing vessel

单选题A chain bridle is used when towing astern because it().Ais easy to connectBprovides an effective catenary and absorbs shock due to its weightCmakes rigging a swivel unnecessaryDprevents the tow from yawing by the drag of the chains in a seaway

单选题A towing vessel becomes tripped while towing on a hawser astern. What factor is MOST important when assessing the risk of capsizing? ()ALength of the towlineBHeight of the towline connectionCLongitudinal position of the towline connectionDDirection of opposing force

单选题When towing astern,one way to reduce yawing of the tow is to().Atrim the tow by the sternBtrim the tow by the headChave the tow on an even keelDlist the tow on the side it is yawing

单选题For safety reasons,when assistance towing().Athe disabled vessel should be towed to the nearest portBthe disabled vessel should be inspected for flammable gasesCpassengers should always be removed from the disabled vesselDpersonnel on the disabled vessel should don PFD's

单选题A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit().Athe masthead lights for a towing vesselBthe lights for a vessel restricted in its ability to maneuverCsidelights,sternlight and towing lightDAll of the above

单选题A power-driven vessel shall have her engine ready for()when the visibility is restricted.Aimmediate stoppingBimmediate maneuveringCimmediate anchoringDimmediate going astern

单选题A power-driven vessel,when towing astern,shall show().Atwo towing lights in a vertical lineBa towing light in a vertical line above the sternlightCtwo towing lights in addition to the sternlightDa small white light in lieu of the sternlight

单选题Which emergency equipment should you keep near the towing bitts().AA self-contained breathing apparatusBA boat hook and a spanner wrenchCA fire ax and/or cutting torchDA Stokes litter basket

单选题What is one thing you should be aware of when conducting a wireless site survey?()A 5 GHz equipment will not be able to penetrate through walls as well as 2.4 GHZ equipment.B 2.4 GHz equipment will not be able to penetrate through walls as well as 5 GHz equipment.C Mounting antennas near metal objects will slightly amplify the signal.D When determining coverage, you should begin measuring attenuation from the middle of the room.

单选题Small quantities of flammable liquids needed at a work site should be().Aused only under the supervision and direction of a ship's officerBtightly capped and stowed with other tools near the job site when securing at the end of the dayCused only when a pressurized fire hose is laid out ready for immediate useDin a metal container with a tight cap

单选题Certain dangerous goods are required “to be stowed in a mechanically ventilated space”. When such goods are carried in a closed Ro/Ro cargo space or a special category space,this space should().Abe mechanically operatedBbe temperature controlledCbe mechanically ventilatedDnot allow to run its refrigeration or heating equipment

单选题To reduce stress on the towing hawser when towing astern (ocean tow),the hawser should be ().Asecured to the aftermost fitting on the towing vesselBjust touching the waterCunderwaterDas short as possible

单选题As seen from the tow,what should connect the leading ends of both towing bridle legs to the main towing hawser?()AA cable clampBA fishplate,flounder,or towing plateCA pad eyeDThe towing bitts