Project management/project planning is most closely aligned with:A.Long range/strategic planning ( years or more).B.Intermediate range planning ( to years)C.Short range/tactical planning ( year or less).D.All of the above.E.B and C.
Planning activities such that predetermined resource availability pools are not exceeded is called:A.Resource leveling.B.Manpower leveling.C.Resource limited planning.D.Manpower planning.E.Manpower contingency planning.
Which of the following constitute Juran's "quality trilogy":A . planning, inspection, control.B . planning, improvement, control.C . planning, organization, control.D . product, price, customer.E . design, build, deliver.
When planning, organizing, coordinating, and controlling a project an important human resources skill or ability would beA . Building multi-disciplinary teamsB . Managing conflictC . Communicating orally and in writing with all levels of personnelD . Involving senior managementE . All are important
121 Project management/project planning is most closely aligned with:A. Long range/strategic planning (5 years or more).B. Intermediate range planning (1 to 5 years)C. Short range/tactical planning (1 year or less).D. All of the above.E. B and C
123 Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.
63 When planning, organizing, coordinating, and controlling a project an important human resources skill or ability would beA. Building multi-disciplinary teamsB. Managing conflictC. Communicating orally and in writing with all levels of personnelD. Involving senior managementE. All are important
116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.B. Manpower leveling.C. Resource limited planning.D. Manpower planning.E. Manpower contingency planning.
MRPII指的是:() A.material requirement planning。B.management requirement planning。C.manufacturing resource planning。D.material revenue planning。E.Material risk planning。
Lesson planning should be done at two levels: _____. A.macro planning and micro planningB.day by day and one week
ideally, lesson planning should be done at two levels: _______________. A. before-class planning and after-class planningB. before-class preparation and after-class feedbackC. before-class planning and after-class reflectionD. macro planning and micro planning
()的目的是把生产、销售、财务、技术、采购等各个子系统结合成一个一体化系统。 A.CAD(Computer Aided Design)计算机辅助设计B.CAM(Computer Aided Manufacturing)计算机辅助制造C.CAPP(Computer Aided Process Planning)计算机辅助工艺过程设计D.MRP-II(Manufacturing Resources Planning)制造资源计划
Weblet的mappath方法中参数为$/表示哪个地址()A、表示获取当前模块的face目录地址B、示获取当前Weblet的resources目录地址C、表示获取当前Weblet的根目录地址D、表示获取当前Weblet的resources/themes目录地址
An ERP management information system integrates several areas such as planning, purchasing()etc.A、inventoryB、salesC、marketingD、human resources
()is the management system to control the material consumed, reduce inventory in the manufacture company.A、DRP (Distribution Resource Planning)B、LRP (Logistics Resource Planning)C、MRP (Material Requirements Planning)D、ERP (Enterprise Resource Planning)
What is the difference between the CUoD and Utility Capacity On Demand?()A、Utility allows for activation of resources by the hour. CUoD allows for permanent access to additional resources installed into the system.B、Utility allows for permanent access to additional resources installed into the system. CuOD allows for activation of resources by the hour.C、Utility allows for activation of resources by the minute. CUoD allows for permanent access to additional resources installed into the system.D、Utility allows for a 30 day usage of additional resources installed into the system. CUoD allows for permanent access to additional resources installed into the system.
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.
How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()A、Use Capacity on Demand to add the resources.B、Use DLPAR to add the resources and select the 'permanent' option.C、Use DLPAR to add the resources, and change the partition profile.D、Use an Operating System command to permanently request the resources.
Company.com is ordering a new p5-570 and planning for the option of using Capacity on Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()A、Use Micro-PartitioningB、Configure a Virtual I/O ServerC、Configure dynamic logical partitionsD、Activate Advanced POWER Virtualization
MX国际化文件是指以下哪个文件()A、mx/resources/locales/messages.jsB、mx/resources/messages.jsC、mx/resources/index.jspD、mx/resources/locales/index.jsp
单选题Weblet的mappath方法中参数为$/表示哪个地址()A表示获取当前模块的face目录地址B示获取当前Weblet的resources目录地址C表示获取当前Weblet的根目录地址D表示获取当前Weblet的resources/themes目录地址
单选题When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()AUse the Workload Estimator capacity planning tool.BUse prtconf output from legacy systems.CUse the LPAR Validation Tool.DUse Performance Management Services.
问答题Planning is a very important activity in our lives. It can givepleasure, even excitement, and it can cause quite severe headaches. (1) _______The most significant the task ahead, the more careful the planning (2) _______required. Getting to school or to work on time is a task requiring few (3) _______or no planning, it is almost routine. A month’s touring holiday abroad,or better still, getting married, is a different matter altogether. If thematter involve a church wedding, a reception, a honeymoon in Venice, (4) _______nd returning a new home, this requires even more planning to make (5) _______sure that it is successful. Planning is our way of trying to ensure successand of avoiding costly failures we can not suffer. It is equally essential (6) _______to individual nations and families; the scale may be vary, but the degree (7) _______of importance does not. In the essence, a nation planning its resources (8) _______and needs do not differ from the familiar weekly shopping or monthly (9) _______household budget. Both are designed to ensure an adequate supply ofessentials, and if improperly carried out, will avoid shortages, wastage (10) _______and over-expenditure.
判断题weblet类的mappath(p_url)方法,如果p_url以“$/”开头表示获取展现框架的resources目录地址。A对B错