单选题The total berth time for a vessel can be reduced through a reduction().Aof working gangsBof idle timeCin productivity of the working shiftsDof working hours each working day

单选题
The total berth time for a vessel can be reduced through a reduction().
A

of working gangs

B

of idle time

C

in productivity of the working shifts

D

of working hours each working day


参考解析

解析: 暂无解析

相关考题:

A non-critical path activity is completed in half the time. Then,A.The critical path is also reduced.B.The slack in the path containing this activity will increase.C.The total cost for this activity has decreased.D.Manpower from this activity can be assigned to other activities.E.All of the above.

A technique that can be used to measure the total income of a project compared to the total moneys expended at any period of time is:A . return on investment (ROI)B . net present value (NPV)C . discounted cash flow (DCF)D . B and CE . All of the above.

136 A technique that can be used to measure the total income of a project compared to the total moneys expended at any period of time is:A. return on investment (ROI)B. net present value (NPV)C. discounted cash flow (DCF)D. B and CE. All of the above

● A non-critical path activity is completed in half the time. Then,A The critical path is also reduced.B The slack in the path containing this activity will increase.C The total cost for this activity has decreased.D Manpower from this activity can be assigned to other activities.E All of the above.

Local bus can reduce the occupation time of CPU.For the PCI local bus, commonly the time can be reduced toA.46%.B.26%.C.16%.D.6%.

A critical path for a project is the series of activities that determine( ) by which the project can be completeA.the earliest timeB.The latest timeC.The total timeD.the free time

Once vessel has been cleared by Port Health or Immigration ______ must proceed to appropriate berth or anchorage.A.ItB.sheC.heD.the vessel

A charterer is unable to complete the loading of a vessel during the lay days specified in the charter party. Under these circumstances,the ______.A.vessel operator can collect demurrageB.ship is authorized extra time to discharge the cargoC.charterer must pay dispatch moneyD.effective period of the charter is extended

All the following is true except that ______.A.in many places a counter current flows in opposition to the main current close to the bankB.current can vary with depth of water and large deep draught ships can experience different current effects at differing parts of the hull tend to turn to the windC.as speed is reduced,the increased proportion of the ship's vector which is attributable to current will set the ship close to obstructionsD.when close to the berth in a head current,there is a danger that flow inshore of the ship becomes restricted and the ship is subject to interactive forces

材料:When expenses are incurred the liability under this insurance shall not exceed the proportion of such expenses that the amount insured hereunder bears to the value of the Vessel as stated herein,or to the sound value of the Vessel at the time of the occurrence giving rise to the expenditure if the sound value exceeds that value.Where the Underwriters have admitted a claim for total loss and property insured by this insurance is saved,the foregoing provisions shall not apply unless the expenses of suing and labouring exceed the value of such property saved and then shall apply only to the amount of the expenses which is in excess of such value.When a claim for total loss of the Vessel is admitted under this insurance and expenses have been reasonably incurred in saving or attempting to save the Vessel and other property and there are no proceeds,or the expenses exceed the proceeds,then this insurance shall bear its pro rata share of such proportion of the expenses,or of the expenses in excess of the proceeds,as the case may be,as may reasonably be regarded as having been incurred in respect of the Vessel,but if the Vessel be insured for less than its sound value at the time of the occurrence giving rise to the expenditure,the amount recoverable under this clause shall be reduced in proportion to the under-insurance.问题:Of the following,_______ only is correct.A.The stated value of the vessel is always higher than its ensured valueB.The sound value of the vessel at the time of the occurrence is always higher than its ensured valueC.The sound value of the vessel at the time of the occurrence is always higher than its stated valueD.The sound value of the vessel at the time of the occurrence is always higher than its saved valueAssuming the sound value of the vessel at the time of accident is $10 millions,the insured value $9 millions,the stated value $8 millions,the expense incurred $2 millions,the liability under this insurance is likely to be _______.A.$2.0 millionsB.$1.8 millionsC.$1.6 millionsD.$1.4 millionsUnder afore-said conditions,assuming the expense of suing and labouring is $3 millions,the proceeds $2 million,and the Underwriter has admitted a claim for total loss,the liability under this insurance is likely to be _______.A.$0.9 millionB.$0.8 millionC.$1.0 millionD.$2.0 millionsUnder previous conditions,assuming the saved value is $1 million,the expense of suing and labouring $3 millions,and the Underwriter has admitted a claim for total loss,the liability under this insurance is likely to be _______.A.$2.0 millionsB.$1.8 millionsC.$1.6 millionsD.$1.4 millions请帮忙给出每个问题的正确答案和分析,谢谢!

ALL PASSENGERS OF DECK NO.2 ARE REQUESTED TO FOLLOW THE CREW MEMBERS WHO WILL ESCOPT YOU TO YOUR ASSEMBLY STATIONS. From this sentence you can concluded that the vessel is in ______.A.immediate danger to collide with another vesselB.a situation in which more passengers will embark on boardC.berth and ready to disembark her passengersD.Distress

CAN YOU BEACH means ______.A.can you go to the beachB.can you run the vessel upon a beach to prevent its sinking in deep waterC.can you handle the vessel along the beachD.can berth along the beach

翻译:Time lost waiting for berth to count as loading/discharging time

单选题CAN YOU BEACH means().Acan you go to the beachBcan you run the vessel upon a beach to prevent its sinking in deep waterCcan you handle the vessel along the beachDcan berth along the beach

单选题Once vessel has been cleared by Port Health or Immigration ()must proceed to appropriate berth or anchorage.AItBsheCheDthe vessel

单选题In stopping distances of vessels,head reach can best be described as the().Adifference between the vessel's speed through the water at any instant and the new speed ordered on the telegraphBdistance the vessel has actually run through the water since a change of speed was orderedCdistance the vessel will run between taking action to stop her and being stationary in the waterDspeed at which a vessel should proceed to ensure that she will run a predetermined distance,once her engines have been stopped

单选题Please()all the lines fore and aft,the vessel is just in her position of the berth now.Apay outBmake fastCshortenDhold on

单选题An upright vessel has negative GM. GM becomes positive at the angle of loll because the().Afree surface effects are reduced due to pocketingBKG is reduced as the vessel seeks the angle of lollCeffective beam is increased causing BM to increaseDunderwater volume of the hull is increased

单选题No claim for constructive total loss based upon the cost of recovery and/or repair of the Vessel shall be recoverable hereunder unless such cost would exceed().Athe stated valueBthe sound valve of the vessel at the time of occurrenceCthe lost valueDthe insured value

问答题翻译:Time lost waiting for berth to count as loading/discharging time

单选题The total magnetic effects which cause deviation of a vessel’s compass can be broken down into a series of components which are referred to as().Adivisional partsBcoefficientsCfractional partsDequations

单选题Vessel shall be placed at the()of the Charterers in such dock or at such berth or place as the Charterers may direct.AdisposalBcontrolCoperationDoption

多选题Which two network attack statements are true?()AAccess attacks can consist of password attacks,trust exploitation,port redirection,and man-in-the-middle attacks.BAccess attacks can consist of UDP and TCP SYN flooding,ICMP echo-request floods,and ICMP directed broadcasts.CDoS attacks can be reduced through the use of access control configuration,encryption,and RFC 2827 filtering.DDoS attacks can consist of IP spoofing and DDoS attacks.EIP spoofing can be reduced through the use of policy-based routing.FIP spoofing exploits known vulnerabilities in authentication services, FTP services,and web services to gain entry to web accounts,confidential databases,and other sensitive information.

单选题The phrase “When built” in the Certificate of Vessel’s Nationality definitely means().AWhen was your vessel builtBAt what time is your vessel buildingCWhen is your vessel builtDAt what time you built your vessel

单选题A ballasted vessel sinks enroute to a drydock. Under these circumstances,the vessel’s owner can claim().Aactual total lossBconstructive total lossCgeneral averageDparticular average

单选题A ballasted vessel sinks enroute to a dry dock. Under these circumstances,the vessel’s owner can claim().Aactual total lossBconstructive total lossCgeneral averageDparticular average

单选题The phrase “When built” in the Certificate of Vessel’s Nationality means().Awhen was your vessel builtBat what time is your vessel buildingCwhen is your vessel builtDat what time you built your vessel