单选题()are supplied by main switchboard directly.ASuez Canal searchlight, air compressor and air conditioning compressorBAir compressor, boiler blower and refrigeration plantCBoiler blower, Suez Canal searchlight and refrigeration plantDSuez canal searchlight, air compressor and boiler blower

单选题
()are supplied by main switchboard directly.
A

Suez Canal searchlight, air compressor and air conditioning compressor

B

Air compressor, boiler blower and refrigeration plant

C

Boiler blower, Suez Canal searchlight and refrigeration plant

D

Suez canal searchlight, air compressor and boiler blower


参考解析

解析: 暂无解析

相关考题:

The database was supplied by a scientific research (). A、partyB、instituteC、peopleD、society

Where could you monitor the correct instant for synchronizing without aid of synchroscope or synchronizing lamp? A.Distribution boardB.Section boardC.Emergency switchboardD.Main switchboard

The upper piston rings m large, slow-speed, two-stroke/cycle diesel engines are most effectively lubricated by oil ____.A.fed from mechanical lubricatorsB.thrown off from the main bearingsC.supplied from wick fed drip lubricatorsD.flow from a centrifugal or banjo oiler

Lubrication for the main reduction gears used with diesel engines is usually supplied byA.oil from the main engine sumpB.an independent lube oil systemC.the stern bearing head tankD.the stem bearing sump tank

For _______the power is supplied by main switchboard directly not through sub-boardA.saving network costB.improving the reliability of supplying power to important loadC.preventing sequence reversingD.increasing the power Factor of important load

When a router is connected to a Frame Relay WAN link using a serial DTE interface, how is the interface clock rate determined()。A、It is supplied by the CSU/DSU.B、It is supplied by the far end router.C、It is determined by the clock rate command.D、It is supplied by the Layer 1 bit stream timing.

单选题()is not installed on the emergency switchboard.AAmmeter and changeover switchBSpeed governor deviceCSynchroscopeDWattmeter

单选题()is not installed on the emergency switchboard.AAmmeterBVoltmeterCWattmeterDSynchroscope

单选题()is not installed on the main switchboard.AAmmeter and changeover switchBPower factor meterCSynchroscopeDReverse sequence relay

单选题The frequency of an alternator is controlled from the main switchboard by adjusting the()Afrequency meterBvoltage regulatorCgovernor controlDsychroscope switch

单选题An indicator on the main switchboard should show () the emergency battery is in service or not.AthatBwhenCifDwhether

单选题()are located on the road panel of main switchboard.AMegohm meter, insulation light and synchroscopeBSynchroscope, synchro light and megohm meterCShore power switch, insulation light and synchroscopeDMegohm meter, insulation light and shore power switch

单选题A switchboard, for a AC electrical distribution system, will be provided with which of the following components ().AFrequency meterBAmmeterCVoltmeterDAll of the above

单选题() is a machine by which electrical energy is transformed into mechanical energy.AAn alternatorBAn electric motorCA diesel engineDA main switchboard

单选题()is not a part of the main switchboard.ABusbarBLoad panel of main generatorCParalleling panelDShore connection box

单选题()is power supplied by main switchboard directly not through sub-board.ADeck machineryBLittle power loadCSome important loadDstationary submersible pump

单选题Emergency generator is installed on board mainly to ()Aconnect to the busbar when the load increasingBsupply power specially to charging panelCbe put into operation during the ship arriving at or leaving portDensure the power supply to critical equipment after the main switchboard out of power

单选题Which of the following is true of the heating system of the Johnstown campus?AThe heat is supplied by human bodies only.BThe heat is supplied by both human bodies and other heat-emitting objects.CThe heat is supplied by both human bodies and conventional fuel.DThe heat is supplied by human bodies, other heat-emitting objects, and conventional fuel.

单选题The purpose of a main switchboard circuit breakers reverse-power trip is to ().Aprevent main circuit overloadBprotect the circuit breaker blowout coilCprevent alternator motorizationDprevent low voltage tripout

单选题A ground in an electrical circuit outside the engine room ().Acannot be detected tinder normal conditionsBis of no consequence to engineering personnelCis indicated at the branch circuit breaker panelDis indicated by the ground detecting lamps on the main switchboard

单选题()is not installed on the emergency switchboard.AControl panelBParalleling panelCLoad panelDBusbar

单选题To () , the power is supplied by main switchboard directly not though sub-board.Asave network costBimprove the reliability of supplying power to important loadCprevent sequence reverseDincrease the power factor of important load

单选题() is (are) not power supplied by main switchboard directly.ASteering gear and windlassBNavigation light and radio power panelCNavigation device power boxDDaily fresh water pump

单选题When a router is connected to a Frame Relay WAN link using a serial DTE interface, how is the interface clock rate determined?()AIt is supplied by the CSU/DSU.BIt is supplied by the far end router.CIt is determined by the clock rate command.DIt is supplied by the Layer 1 bit stream timing.

单选题When the load is increased on a turbocharged diesel engine, the amount of increased air supplied by the turbocharger will()Alag behind the increased fuel supplied to the engineBenter the engine along with the increase in the fuelCenter the engine before the increased fuel supplyDleave the turbocharger as a negative pulse

单选题A switchboard for an AC electrical system requires the use of which of the following devices().AFrequency meterBOhmmeterCInduction voltage regulatorDCurrent transformer governor

单选题The crank chamber oil ().Acan be recoveredBis only supplied to cylindersConly feeds the main bearingDis a kind of detergent