单选题During which condition should the operator of a pedestal crane shutdown operations?()ABunkering barge alongsideBPotable water spill on deckCCrane hydraulic hose burstsDTrim greater than 4 feet
单选题
During which condition should the operator of a pedestal crane shutdown operations?()
A
Bunkering barge alongside
B
Potable water spill on deck
C
Crane hydraulic hose bursts
D
Trim greater than 4 feet
参考解析
解析:
暂无解析
相关考题:
Operator overloading operator+= which appends another String instance into current Stringinstance.
An operator wants to move all files inside the directory /home/operator to the current directory. Which of the following commands will complete the task?() A. mv /home/operator .B. mv /home/operator/* .C. mv /home/operator ../..D. mv /home/operator/all ../home/operator
Which factor(s) might indicate that a towline should be removed from service?A.Visible damage to the towline,including fishhooksB.Measurements showing a decrease in diameterC.A surface condition of corrosion and discolorationD.All of the above
Which safety precaution(s)should be observed during crane operations ________.A.Checking for proper lifting from beneath the load during cargo operationsB.Using the proper slings or other lifting devices during cargo operationsC.Relaying communications to port agents on the pier during cargo hoistsD.All of the above
During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet
During which condition should be operator of a pedestal crane shutdown operations?A.BunkeringB.High windsC.Potable water spill on deckD.More than 3°list
Which of the following commands should be used to monitor disk utilization during the time a system is experiencing a disk I/O performance problem?()A、 istatB、 topasC、 vmstatD、 filemon
AIX 5L and SUN Solaris have differing approaches at handling processor failures. Which statement best describes how AIX handles processor failures?()A、If AIX discovers a processor with too many recoverable errors during runtime, it will dynamically turn off that processor, while the rest of the system keeps running.B、If AIX detects a failing processor it will automatically move all resources to another processor. The failed processor can be hot-swapped and the new replacement becomes the active processor.C、If AIX determines a processor is failing, it will perform diagnostics to determine which processor function can be disabled and dynamically reallocate all CPU and memory resources thus isolating the failure condition and preventing a reboot.D、If AIX senses a processor level error condition, internal diagnostics are activated to determine the severity of the problem. After the failure threshold is met, a message is broadcast to the service processor informing the operator to perform a system reboot.
An operator wants to move all files inside the directory /home/operator to the current directory. Which of the following commands will complete the task?()A、mv /home/operator .B、mv /home/operator/* .C、mv /home/operator ../..D、mv /home/operator/all ../home/operator
You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. A new SQL Agent job has been created by you. The job includes a Windows PowerShell job step which transfer data between servers by using the SQLCmd utility. If the job fails, you must make sure that an operator named ReactGroup is informed by receiving an e-mail. So what action should you perform to achieve this goal? () A、First you should enable Notifications. Direct the Notification to the ReactGroup operator on job failure after you create the ReactGroup operator. B、First you should enable Notifications. Direct the Notification to the ReactGroup operator on failure of the Powershell job step after you create the ReactGroup operator. C、First you should assign the ReactGroup operator as the failCsafe operator. Then enable the job after you create the ReactGroup operator. D、First you should configure the job step proxy account to use the ReactGroup operator account after you create the ReactGroup operator. At last choose the proxy account for the e-mail profile.
单选题AIX 5L and SUN Solaris have differing approaches at handling processor failures. Which statement best describes how AIX handles processor failures?()AIf AIX discovers a processor with too many recoverable errors during runtime, it will dynamically turn off that processor, while the rest of the system keeps running.BIf AIX detects a failing processor it will automatically move all resources to another processor. The failed processor can be hot-swapped and the new replacement becomes the active processor.CIf AIX determines a processor is failing, it will perform diagnostics to determine which processor function can be disabled and dynamically reallocate all CPU and memory resources thus isolating the failure condition and preventing a reboot.DIf AIX senses a processor level error condition, internal diagnostics are activated to determine the severity of the problem. After the failure threshold is met, a message is broadcast to the service processor informing the operator to perform a system reboot.
单选题During which condition should the operator of a pedestal crane shutdown operations?()ALightning in the vicinityBAn approaching squall lineCA fire on the pierDAll of the above
单选题What is the action that a GMDSS Radio Operator should take when a DSC distress alert is received? ()ANo action is necessary,as the DSC control unit will automatically switch to the NBDP follow-on communications frequencyBThe operator should immediately set continuous watch on the radiotelephone frequency that is associated with the frequency band on which the distress alert was receivedCThe Operator should immediately set continuous watch on VHF channel 70DThe Operator should immediately set continuous watch on the NBDP frequency that is associated with the frequency band on which the distress alert was received
单选题During which condition should the operator of a pedestal crane shutdown operations?()ALightningBHigh windsCFire aboardDAll of the above
单选题The crane is usually mounted on a pedestal to offer adequate () to the operator.AtimeBspaceClengthDvisibility
单选题During which condition should the operator of a pedestal crane shutdown operations?()ABunkeringBHigh windsCPotable water spill on deck
单选题Which action(s) should the operator of a pedestal crane take if crane control is lost?()ALet go of both control levers and return to neutral positionBPress the emergency stopCNotify the mate on watchDAll of the above
单选题During operation, the ()should check the working condition of the derrick.AforemanBoperatorCopenerDstevedore
单选题During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()APrepareBDesignCPositionDDevelopEPlanFPerform
单选题Which factor(s) might indicate that a towline should be removed from service? ()AVisible damage to the towline,including fishhooksBMeasurements showing a decrease in diameterCA surface condition of corrosion and discolorationDAll of the above
单选题To which parameter should the access point be set during a site survey?()ATransmit onlyBDiversityCReceive onlyDSingle isolated antenna
多选题Which three are true regarding the use of outer joins? ()AYou cannot use IN operator in a condition that involves an outerjoin.BYou use (+) on both sides of the WHERE condition to perform an outerjoin.CYou use (*) on both sides of the WHERE condition to perform an outerjoin.DYou use an outerjoin to see only the rows that do not meet the join condition.EIn the WHERE condition, you use (+) following the name of the column in the table without matching rows, to perform an outerjoin.FYou cannot link a condition that is involved in an outerjoin to another condition by using the OR operator.
单选题Inspection of a vessel’s propeller during dry-dock should include ()Anoting the condition of the fairwaterBinspection of the keywayClogging inspection results in the official deck logDall of above
单选题You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. According to the company requirement, the names of all user-defined stored procedures must contain the prefix usp_ on all instances. Besides this, you must make sure that stored procedures that do not contain this prefix cannot be created by you. What should you do?()AA policy should be created. The policy targets the name of the stored procedure that is evaluated on demand. BA policy should be created. The policy targets the name of the stored procedure that is evaluated on change. CA condition should be created. The condition targets the name of the stored procedure that is evaluated on change DA condition should be created. The condition targets the name of stored procedure that is evaluated on demand.
单选题When the engine room is put in standby condition, the engineer in charge of the watch need not to()Aensure all machinery which may be used during maneuvering is in readyBensure an adequate reserve of power is available for steering gear and other requirementsCkeep the main propulsion unit controls continuously attended when in the manual mode of operationDensure all machinery which may be used during maneuvering is running stably
单选题Which statement is FALSE concerning precautions during fueling operations?()AAll engines,motors,fans,etc. should be shut down when fuelingBAll windows,doors,hatches,etc. should be closedCA fire extinguisher should be kept nearbyDFuel tanks should be topped off with no room for expansion
单选题You have abandoned ship in tropical waters. Which procedure(s) should be used during a prolonged period in a raft?().AWet clothes during the day to decrease perspirationBGet plenty of restCKeep the entrance curtains openDAll of the above