单选题You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo logs.   Your colleague asks for you to comment on his plan.  Which response would be correct?()A The plan will work as is.B The plan needs to be modified to allow for an archive-log switch after step 3.C The plan needs to be modified so that a backup of the archived redo logs occurs before step 1.D The plan needs to be adjusted to shut down the database after step 1 and to restart the database after step 2.E The plan cannot work as presented.

单选题
You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo logs.   Your colleague asks for you to comment on his plan.  Which response would be correct?()
A

 The plan will work as is.

B

 The plan needs to be modified to allow for an archive-log switch after step 3.

C

 The plan needs to be modified so that a backup of the archived redo logs occurs before step 1.

D

 The plan needs to be adjusted to shut down the database after step 1 and to restart the database after step 2.

E

 The plan cannot work as presented.


参考解析

解析: 暂无解析

相关考题:

The young fellow was praised for his ( ). A、unselfishnessB、selfishlyC、selfishnessD、selfish

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings(环境)near shops and bus stops, not too far from your friends and the place where you work.Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets.The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate(预算)must be corrected and revised(修订). His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high!) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builders estimate depends on the plan, but the final plan depends on the builders estimate.21. The best title of this passage is().A. Building a House Costs Much MoneyB. Estimate Is ImportantC. Planning a House22. The first thing for a person to build a house is().A. to get as much money as possibleB. to find a suitable piece of landC. to work out a plan23. The phrase”draw a plan”in this passage means().A. making a picture of a building or a roomB. making a planC. working out a plan24. When the builder starts to build a house, his estimate will have to be corrected and revised because().A. it is wrongly worked out by a workmanB. the future owner of the house thinks the estimate is so high that he cannot afford the buildingC. the prices of building materials and the expenses(费用)of labor may be different from the original prices and expenses25. What is the relationship(关系)between the estimate and the plan?A. The plan depends on the estimate.B. The plan has nothing to do with the estimate.C. The estimate and the plan depend on each other.

The contempt he felt for his fellow students was obvious.A:.hateB: needC: loveD: pity

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work. Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house. When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate. The phrase "draw a plan" in this passage means _______A.making a picture of a building or a roomB.making a planC.working out a planD.pulling a picture out of a room

根据下列内容,回答191-195题。Building a house costs quite a lot of money. Suppose you plan to build a house. Your first stepwill be to find a right piece of land. Your choice will depend on many different things. You willprobably try to find a sunny place, with pleasant surroundings near shops and bus stops, not toofar from your friends and the place where you work.Next you will find a good builder, and together with the builder you will work out a plan. Thebuilder will draw the plan. It will show the number of rooms, their position and size, and otherparts, which must be noticed, such as windows, doors, and electric outlets. The builder will workout how much money is needed to build your house. He will work out the cost of the wood, bricks,the glass, and everything else that must be used in building the house. Later on, when he starts tobuild, this estimate must be corrected and revised. His estimate is based on existing prices, butprices of such things may change, and many other things may happen between the time when hemakes the estimate and the time when he builds the house.When the builder gives his estimate, you may wish to change your plan.(You may also wish tochange your builder, if his estimate is too high! ) You may find that the house you wanted at firstcosts too much, or that you can spend a little more and add something to your plan. The builder'sestimate depends on the plan, but the final plan depends on the builder's estimate.The best title of this passage isA.Building a House Costs Much MoneyB.Estimate Is ImportantC.Planning a HouseD.Depend on the Builder

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work. Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house. When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.When the builder starts to build a house, his estimate will have to be corrected and revised because _______. A.it is wrongly worked out by a workmanB.the future owner of the house thinks the estimate is so high that he cannot afford the buildingC.the prices of building materials and the expenses of labor may be different from the original prices and expensesD.estimates are usually mistaken in the beginning

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work. Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house. When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate. The best title of this passage is ________A.Building a House Costs Much MoneyB.Estimate Is ImportantC.Planning a HouseD.Depend on the Builder

Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work. Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house. When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.What is the relationship between the estimate and the plan?A.The plan depends on the estimateB.The estimate depends on the planC.The plan has nothing to do with the estimateD.The estimate and the plan depend on each other

You work as a database administrator for Supportcenter.cn. You are using Recovery Manager (RMAN) for backup and recovery of your database. You executed the delete command in RMAN to delete a backup of a tablespace. Which statement is true in this scenario?()A、The backup status will be marked expired in RMAN recovery catalog.B、The backup status will be marked deleted in RMAN recovery catalog after you execute the crosscheck command.C、The backup will be deleted physically from the OS (Operating system)and the backup information is removed from the recovery cataloglD、The backup status will be marked deleted and you must delete the backup file manually from the OS (Operating system).E、The backup status will be marked deleted and you must delete the backup file manually from the OS (Operating system), if you are not using Oracle Managed Files (OMF).

You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo logs.   Your colleague asks for you to comment on his plan.  Which response would be correct?()A、 The plan will work as is.B、 The plan needs to be modified to allow for an archive-log switch after step 3.C、 The plan needs to be modified so that a backup of the archived redo logs occurs before step 1.D、 The plan needs to be adjusted to shut down the database after step 1 and to restart the database after step 2.E、 The plan cannot work as presented.

You are a network administrator for The network contains a Windows Server 2003 computer named Testking1. You need to install an application on Testking1. The installation will cause several changes to the registry. You plan to use the Backup utility to create a backup that will enable you to restore the registry. TestKing requirements for network management state that all backups must be performed during an eight-hour period at night. Because of this time constraint, you need to ensure that the backup can be recovered as quickly as possible. You need to create a backup that meets the requirements. What should you do?()A、Create a backup of the system partition.B、Create a backup of the boot partition.C、Create a backup of the System State.D、Create an Automated System Recovery (ASR) backup.E、Create a backup of the Systemroot/System32/Config folder.

You have an Exchange Server 2010 organization that contains two Hub Transport servers.  You need to design a recovery plan for the Hub Transport servers that meets the following requirements: .Restores all Windows settings .Restores all Exchange configurations.Minimizes administrative effort What should you include in the plan?()A、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of Windows system stateA recovery installation of Exchange Server 2010B、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of transport queues.A custom installation of Exchange Server 2010C、Recovery of Windows system state.Backup and recovery of transport queues.A typical installation of Exchange Server 2010D、Backup and recovery of Windows system state.A repair installation of Windows Server 2008.A typical installation of Exchange Server 2010

You have a portable computer that runs Windows 7. Windows Backup is configured to run every day at15:00. You need to prevent backups from automatically running when the computer is running on thebattery.  What should you do?()A、From Backup and Restore, click Change settings.B、From Task Scheduler, modify the AutomaticBackup task.C、From Power Options, modify the settings of the current power plan.D、From the local computer policy, modify the power management settings.

You use Hyper-V Server 2008 R2 and failover clustering to host several virtual machines (VMs). You plan to perform a Volume Shadow Copy (VSS) backup of a Cluster Shared Volume (CSV). You need to ensure that resources can continue to use the CSV during the VSS backup. What should you do?()A、Turn on redirected access for the CSV.B、Turn on maintenance mode for the CSV.C、Use Failover Cluster Manager to remove dependencies from your disk resources.D、Configure your VSS-aware backup utility as a generic application in failover clustering.

You have an Exchange Server 2010 organization that contains two Hub Transport servers.  You need to design a recovery plan for the Hub Transport servers that meets the following requirements:.Restores all Windows settings .Restores all Exchange configurations.Minimizes administrative effort What should you include in the plan?()A、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of Windows system stateA recovery installation of Exchange Server 2010B、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of transport queues.A custom installation of Exchange Server 2010C、Recovery of Windows system state.Backup and recovery of transport queues.A typicalinstallation of Exchange Server 2010D、Backup and recovery of Windows system state.A repair installation of Windows Server 2008.A typical installation of Exchange Server 2010

You work as an application developer at Certkiller .com. You are currently in theprocess of reviewing an application that was created by a fellow developer.The application that you are reviewing includes a declaration for a collection named EmployeeList, which stores Employee objects. The declaration is shown below: public class EmployeeList : Enumerator, IEnumerable { // Class implementation } You require the ability to iterate through the EmployeeList with minimum development effort.What should you do?()A、 Utilize the switch statementB、 Utilize the dowhile statementC、 Utilize the foreach statementD、 Utilize the if statement

You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. You configure the SQL Server instance to use the -T1222 and -T1204 trace flags during startup. You must make sure that your failure recovery plan performs backup of the use of the trace flags. So what action should you perform to achieve this goal? () A、You should backup the master databaseB、You should backup the default.trc fileC、You should backup the SQL Server registry hive.D、You should backup the resource database

You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. You have to perform the backup of the default trace according to the requirement of your failure recovery plan. The default trace is contained in the subdirectory.You have to backup the subdirectory.  Which SQL Server database engine subdirectory should be backed up?()A、DATAB、INSTALL C、LOG D、BINN

You are designing a performance monitoring plan for the database that supports APP1. You need to monitor only necessary indicators. Which indicator or indicators should you include in the baseline?()A、response times for frequently used queriesB、database backup and restore completion timesC、disk I/OD、CPU utilizationE、network packet sizeF、SOAP requests failed

单选题You have an Exchange Server 2010 organization that contains two Hub Transport servers.  You need to design a recovery plan for the Hub Transport servers that meets the following requirements: .Restores all Windows settings .Restores all Exchange configurations.Minimizes administrative effort What should you include in the plan?()A.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of Windows system stateA recovery installation of Exchange Server 2010B.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of transport queues.Acustom installation of Exchange Server 2010CRecovery of Windows system state.Backup and recovery of transport queues.A typical installation of Exchange Server 2010DBackup and recovery of Windows system state.A repair installation of Windows Server 2008.A typical installation of Exchange Server 2010

单选题Wang’s zeal was contagious; soon all his fellow students were busily making posters, inspired by his ardent enthusiasm for the cause.Aeager Benthusiasm Czealot Dfanatic

单选题You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo logs.   Your colleague asks for you to comment on his plan.  Which response would be correct?()A The plan will work as is.B The plan needs to be modified to allow for an archive-log switch after step 3.C The plan needs to be modified so that a backup of the archived redo logs occurs before step 1.D The plan needs to be adjusted to shut down the database after step 1 and to restart the database after step 2.E The plan cannot work as presented.

单选题Your company has 250 branch offices.   Your network contains an Active Directory domain. The domain controllers run Windows Server 2008 R2.   You plan to deploy Read-only Domain Controllers (RODCs) in the branch offices. You need to plan the deployment of the RODCs to meet the following requirements: èBuild each RODC at the designated branch office.   èEnsure that the RODC installation source files do not contain cached secrets.   èMinimize the bandwidth used during the initial synchronization of Active Directory Domain Services (AD?DS).   What should you include in your plan?()AUse Windows Server Backup to perform a full backup of an existing domain controller. Use thebackup to build the new RODCs.BUse Windows Server Backup to perform a custom backup of the critical volumes of an existing domain controller. Use the backup to build the new RODCs.CCreate a DFS namespace that contains the Active Directory database from one of the existing domain controllers. Build the RODCs by using an answer file.DCreate an RODC installation media. Build the RODCs from the RODC installation media.

单选题You are a network administrator for The network contains a Windows Server 2003 computer named Testking1. You need to install an application on Testking1. The installation will cause several changes to the registry. You plan to use the Backup utility to create a backup that will enable you to restore the registry. TestKing requirements for network management state that all backups must be performed during an eight-hour period at night. Because of this time constraint, you need to ensure that the backup can be recovered as quickly as possible. You need to create a backup that meets the requirements. What should you do?()ACreate a backup of the system partition.BCreate a backup of the boot partition.CCreate a backup of the System State.DCreate an Automated System Recovery (ASR) backup.ECreate a backup of the Systemroot/System32/Config folder.

多选题You are designing a performance monitoring plan for the database that supports APP1. You need to monitor only necessary indicators. Which indicator or indicators should you include in the baseline?()Aresponse times for frequently used queriesBdatabase backup and restore completion timesCdisk I/ODCPU utilizationEnetwork packet sizeFSOAP requests failed

多选题You plan to take a closed database backup using operating system commands. Which three SHUTDOWN options are appropriate for this type of backup?()AABORTBNORMALCIMMEDIATEDTRANSACTIONAL

单选题You are the network administrator for Test King. All network servers run Windows Server 2003. You perform a full backup of the network every Monday. You perform incremental backups on Tuesday, Wednesday, Thursday, and Friday. Backups are always performed at 1:00 A.M. On Friday afternoon, a user accidentally deletes a file. You need to restore the file. What should you do?()AOpen each backup log, beginning with Monday and moving forward through the week. In each log, search for a backup of the file. Restore the first backup that you find.BOpen each backup log, beginning with Friday and moving backward through the week. In each log, search for a backup of the file. Restore the first backup that you find.COpen each backup log, beginning with Tuesday and moving forward through the week. In each log, search for a backup of the file. Restore the first backup that you find.DOpen the backup log for Monday. Search for a backup of the file. If you find a backup, restore the file. If you do not find a backup, open the backup log for Friday and search there. If you find a backup, restore the file. If you do not find a backup, continue opening backup logs, moving backward through the week from FridayRestore the first backup that you find.

单选题You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. You configure the SQL Server instance to use the -T1222 and -T1204 trace flags during startup. You must make sure that your failure recovery plan performs backup of the use of the trace flags. So what action should you perform to achieve this goal? ()AYou should backup the master databaseBYou should backup the default.trc fileCYou should backup the SQL Server registry hive.DYou should backup the resource database