单选题A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?()AThe switch port link lights will be off on both switches indicating the ports are not connected.BThe switch port link light will be off on one switch indicating that STP has disabled the port.CThe switch port link lights will flash amber indicating an error.DThe switch port link lights will be green indicating normal operation.

单选题
A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?()
A

The switch port link lights will be off on both switches indicating the ports are not connected.

B

The switch port link light will be off on one switch indicating that STP has disabled the port.

C

The switch port link lights will flash amber indicating an error.

D

The switch port link lights will be green indicating normal operation.


参考解析

解析: 暂无解析

相关考题:

The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()A. The servers have not had VLAN tagging enabled on their NICs.B. Speed and duplex have not been set.C. VLAN tagging was not set on the trunk.D. The servers have been connected with CAT5 cable.

Which interface commands would you enter on a Catalyst 2900 switch, if your goal was to bring all VLAN traffic to another directly connected switch?() A. Switch(config-if)# vlan allB. Switch(config-if)# switchport trunk encapsulation dot1qC. Switch(config-if)# switchport access vlan allD. Switch(config-if)# switchport mode trunkE. Switch(config-if)# switchport access vlan 303

A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?() A. All defined VLANs are allowed on the trunk by default.B. Each VLAN, or VLAN range, that is specified with the switchport mode command.C. Each VLAN, or VLAN range, that is specified with the vtp domain command.D. Each VLAN, or VLAN range, that is specified with the vlan database command.

You are bringing up a new Cisco Catalyst switch, and wish to connect it via a trunk to another switch from a different vendor, which uses the IEEE standard for the trunking method.When setting the encapsulation type on the trunk, what should you configure on the Cisco switch?()A. Switch(config)# switchport trunk encapsulation islB. Switch(config)# switchport trunk encapsulation ietfC. Switch(config-if)# switchport trunk encapsulation islD. Switch(config-if)# switchport trunk encapsulation ietfE. Switch(config-if)# switchport trunk encapsulation dot1q

Refer to the exhibit. Given the output shown from this Cisco Catalyst 2950, what is the most likely reason that interface FastEthernet 0/10 is not the root port for VLAN 2?() A.This switch has more than one interface connected to the root network segment in VLAN 2.B.This switch is running RSTP while the elected designated switch is running 802.1d Spanning Tree.C.This switch interface has a higher path cost to the root bridge than another in the topology.D.This switch has a lower bridge ID for VLAN 2 than the elected designated switch.

Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()A、At Least one enabled switch port that is unconnected to any deviceB、A PC pre-configured with a specific IP Address and MaskC、A PC or laptop with Windows 2000 or Windows XP installed and a web browser that has Java Script enabledD、Physical Access to SwitchE、A Switch with no connected devices

A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?()A、The switch port link lights will be off on both switches indicating the ports are not connected.B、The switch port link light will be off on one switch indicating that STP has disabled the port.C、The switch port link lights will flash amber indicating an error.D、The switch port link lights will be green indicating normal operation.

A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()A、The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.B、The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.C、The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.D、The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

Which interface commands would you enter on a Catalyst 2900 switch, if your goal was to bring all VLAN traffic to another directly connected switch?()A、Switch(config-if)# vlan allB、Switch(config-if)# switchport trunk encapsulation dot1qC、Switch(config-if)# switchport access vlan allD、Switch(config-if)# switchport mode trunkE、Switch(config-if)# switchport access vlan 303

You work as a network Technician. A new workstation has consistently been unable to obtain anIP address from the DHCP server when the workstation boots. Older workstations function normally, and the new workstation obtains an address when manually forced to renew its address.  What should be configured on the switch to allow the workstation to obtain an IP address at boot?()A、UplinkFast on the switch port connected to the serverB、BackboneFast on the switch port connected to the serverC、PortFast on the switch port connected to the workstationD、trunking on the switch

A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()A、All defined VLANs are allowed on the trunk by default.B、Each VLAN, or VLAN range, that is specified with the switchport mode command.C、Each VLAN, or VLAN range, that is specified with the vtp domain command.D、Each VLAN, or VLAN range, that is specified with the vlan database command.

You need make configuration changes to an existing layer 3 switch in the Company network. On a  multilayer Catalyst switch,  which interface command is used to convert a Layer 3 interface to a  Layer 2 interface?()A、 switchport access vlan vlan-idB、 switchportC、 switchport mode accessD、 no switchportE、 None of the other alternatives apply

A cisco aironet 1020 controller-based access point has been connected to a catalyst 3550-24 pwr switch. however, when it is powered up, the access point fails. What has caused this problem?()A、access point does not support 802.11hB、incorrect switch power supplyC、switch port is not enabledD、switch does not support 802.3afE、access point has not been initialized with the primary controller

You are bringing up a new Cisco Catalyst switch, and wish to connect it via a trunk to another switch from a different vendor, which uses the IEEE standard for the trunking method. When setting the encapsulation type on the trunk, what should you configure on the Cisco switch?()A、Switch(config)# switchport trunk encapsulation islB、Switch(config)# switchport trunk encapsulation ietfC、Switch(config-if)# switchport trunk encapsulation islD、Switch(config-if)# switchport trunk encapsulation ietfE、Switch(config-if)# switchport trunk encapsulation dot1q

An administrator is configuring a Catalyst switch with VLAN information that must be automatically distributed to other Catalyst switches in the network. What conditions must be met in order for the VLANs configured on this switch to be automatically configured on the other switches?()A、The switch that will share its VLAN configuration must be in VTP server mode.B、The switches must be in the same VTP domain.C、The switch that will share the VLAN information must be configured as the root bridge.D、The switches must be connected over VLAN trunks.E、The switches must be configured to use the same STP version.F、The switches must have VTP pruning activated.

The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch.What must be done to ensure that this new switch becomes the root bridge on the network?()A、One router is running RIPv1.B、RIP neighbor is 224.0.0.9.C、The network contains a loop.D、Network 10.10.1.0 is reachable.

The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()A、Lower the bridge priority number.B、Change the MAC address of the switch.C、Increase the VTP revision number for the domain.D、Lower the root path cost on the switch ports.E、Assign the switch an IP address with the lowest value.

A Cisco Aironet 1020 controller-based access point has been connected to a Catalyst 3550-24PWR Switch. However, when it is powered up, the access point fails. What has caused this problem?()A、access point does not support 802.11hB、incorrect switch power supplyC、switch port is not enabledD、switch does not support 802.3afE、access point has not been initialized with the primary controller

What are two results of entering the Switch(config)# vtp mode client command on a Catalyst switch?()A、The switch will ignore VTP summary advertisementsB、The switch will forward VTP summary advertisementsC、The switch will process VTP summary advertisementsD、The switch will originate VTP summary advertisementsE、The switch will create, modify and delete VLANs for the entire VTP domain

A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network. Which of the conditions below have to be met in order for this to occur?()A、The switch that will share the VLAN information must be in the VTP Server mode.B、The switches must be in the same VTP domain.C、The switch that will share the VLAN information must be configured as the root bridge.D、The switches must be configured to use the same VTP version.E、The switches must be configured to use the same STP version.F、The switches must be configured to use the same type of ID tagging.G、The switches must be connected over VLAN trunks.

You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()A、The switch name must match the workgroup name of the local network.B、The switch must be configured with an IP address and default gateway.C、The remote workstations must have access to the management VLAN of the switch.D、CDP must be enabled on the switch so that it can be located by other devices on the network.

多选题An administrator is configuring a Catalyst switch with VLAN information that must be automatically distributed to other Catalyst switches in the network. What conditions must be met in order for the VLANs configured on this switch to be automatically configured on the other switches?()AThe switch that will share its VLAN configuration must be in VTP server mode.BThe switches must be in the same VTP domain.CThe switch that will share the VLAN information must be configured as the root bridge.DThe switches must be connected over VLAN trunks.EThe switches must be configured to use the same STP version.FThe switches must have VTP pruning activated.

多选题You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()AThe switch name must match the workgroup name of the local network.BThe switch must be configured with an IP address and default gateway.CThe remote workstations must have access to the management VLAN of the switch.DCDP must be enabled on the switch so that it can be located by other devices on the network.

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMc  BAsynchronous adapters on the new HMcCThe two 570 servers are directly connected to the new HMc  DOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

单选题The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()A Lower the bridge priority number.B Change the MAC address of the switch.C Increase the VTP revision number for the domain.D Lower the root path cost on the switch ports.E Assign the switch an IP address with the lowest value.

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMCBAsynchronous adapters on the new HMCCThe two 570 servers are directly connected to the new HMCDOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

多选题Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()AAt Least one enabled switch port that is unconnected to any deviceBA PC pre-configured with a specific IP Address and MaskCA PC or laptop with Windows 2000 or Windows XP installed and a web browser that has Java Script enabledDPhysical Access to SwitchEA Switch with no connected devices