单选题On what metrics is Software Maintenance for AIX (SWMA) priced?()AClock speed and memory capacityBAIX version and number of usersCpSeries class and number of CPUsDpSeries model and number of LPARs
单选题
On what metrics is Software Maintenance for AIX (SWMA) priced?()
A
Clock speed and memory capacity
B
AIX version and number of users
C
pSeries class and number of CPUs
D
pSeries model and number of LPARs
参考解析
解析:
暂无解析
相关考题:
●In which phase of the software engineering process is the Software Requirements Specification developed? (68) .(68) A.development phaseB.engineering phaseC.maintenance phaseD.Definition phase
● Software maintenance is to do necessary modification,supplenemt,and completeness during software life circle.Among the following vary kinds of maintenance,which one has the maximum workload in a general way? (73) .(73) A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance
Software engineering is the study and application of engineering to the ( ), development and maintenance of software.A.researchB.managementC.assemblyD.design
●Maintenance activities do not include (74).(74)A. making enhancements to software productsB. developing a new software productC. correcting problemsD. adapting products to new environments
By default, which IS-IS metric types does JUNOS software support?() A. receiving of wide metrics onlyB. sending of narrow metrics onlyC. receiving of narrow metrics onlyD. sending and receiving of narrow and wide metrics
When rejecting applied an dependent updates on an AIX 5L system, which of the following procedures is most appropriate to follow?() A.Use the install PREVIEW option to view a list of all updates that will be rejectedB.Use the lslpp -d command to view the dependent filesets that will be rejectedC.Select the SMIT option to Verify Software Requisites and Installations first to generate a list of all applied updates.D.Select the SMIT option to List the Maintenance Level of a Software Product to double check the update level that should be removed
Software document is an important part of software and a basis of software development phase. It also influnces software's(72).A.ExpansibilityB.ReusabilityC.PortabilityD.Maintenance
Software maintenance is to do necessary modification, supplenemt, and completeness during software life circle. Among the following vary kinds of maintenance, which one has the maximum workload in a general way?(73).A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance
????????Software engineering is the study and application of engineering to the (71)??development and maintenance of software??????????A.A.researchB.B.managementC.C.assemblyD.D.design
Software engineers apply the principles of software engineering to the design, development, ( ),testing, and evaluation of the software and systems that make computers or anything containing software work.A.RequirementB.constructionC.serviceD.maintenance
●Software (75)occurs following delivery ofa software product to the customer.(75)A.analysisB.designC.implementationD.maintenance
Software ( ) activities involve making enhancements to software products, adapting products to new environments, and correcting problems.A.analysisB.designC.codingD.maintenance
The term “software( )" is used to describe the software engineering activities that occur following delivery of a software product to the customer.A.analysisB.designC.implementationD.maintenance
When rejecting applied an dependent updates on an AIX 5L system, which of the following procedures is most appropriate to follow?()A、Use the install PREVIEW option to view a list of all updates that will be rejectedB、Use the lslpp -d command to view the dependent filesets that will be rejectedC、Select the SMIT option to Verify Software Requisites and Installations first to generate a list of all applied updates.D、Select the SMIT option to List the Maintenance Level of a Software Product to double check the update level that should be removed
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() A、APV features are not supported for some legacy POWER4 adaptersB、APV will require the most current maintenance level for AIX 5.2C、APV features will require that legacy POWER4 adapters be updated with new microcodeD、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
Which TWO of the following tasks of system maintenance can be improved by using Remote Deployment Manager?()A、DeploymentB、Software maintenanceC、Driver updatesD、DisposalE、Software inventory
A customer is experiencing problems with a failed disk drive on their newly purchased p630 server. The IBM CE has replaced the disk and now the mirrored Logical Volume needs to be re-created. The customer does not have the skills to do this. There is no support contract with the solution provider but the p630 is covered under a Software Maintenance Agreement (SWMA) 24/7 contract. What should the pSeries technical specialist do first?()A、Offer to rebuild the logical volume for a fee.B、Offer to talk the customer through the procedure to rebuild the logical volume for a fee.C、Suggest the customer open a call with IBM TechLine; offer to explain how the process works.D、Suggest the customer open a call with IBM SupportLine; offer to explain how the process works.
The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()A、SupportlineB、ServiceSuiteC、Software Maintenance Agreement (SWMA)D、Machine Control Program Remote Support Agreement (MCPRSA)
Which of the following options should be used to obtain the latest security patches for AIX?()A、FixDistB、The Bonus Pack CDC、OPSD、The Security Maintenance CD
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()A、What version of AIX is needed?B、Which SWMA offering is needed?C、What kind of network is the system being attached to?D、What kind of memory should be configured on the system?
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()A、Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required. B、Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required. C、Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262. D、Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
An administrator is defining an lpp_source calledlpp_AIX6 in NIM when the following warning message is displayed in the output:warning: 0042-267 c_mk_lpp_source: The defined lpp_source does not have the 'simages' attribute because one or more of the following packages are missing: Bos bos.net bos.diag bos.sysmgtbos.terminfo bos.terminfo.all.data bos.mp64 devices.common bos.64bit. What does this warning message mean?() A、The lpp_AIX6 is not a valid lpp_source NIM resource.B、The lpp_AIX6 can be used in NIM BOS operations to install AIX only on standalone clients.C、The lpp_AIX6 can be used in NIM CUST operations to install software on SPOTs and running machines.D、The lpp_AIX6 does not contain all of the required software packages for NIM CUST installation operations.WArialCourier NewTimes New RomanZ
On what metrics is Software Maintenance for AIX (SWMA) priced?()A、Clock speed and memory capacityB、AIX version and number of usersC、pSeries class and number of CPUsD、pSeries model and number of LPARs
单选题A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()AWhat version of AIX is needed?BWhich SWMA offering is needed?CWhat kind of network is the system being attached to?DWhat kind of memory should be configured on the system?
单选题Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()ANew install of AIXBMigrate the 7040-61DCUtilize alt_disk_installDUse the enterprise back up strategy
单选题The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()ASupportlineBServiceSuiteCSoftware Maintenance Agreement (SWMA)DMachine Control Program Remote Support Agreement (MCPRSA)
单选题By default, which IS-IS metric types does JUNOS software support?()Areceiving of wide metrics onlyBsending of narrow metrics onlyCreceiving of narrow metrics onlyDsending and receiving of narrow and wide metrics