问答题翻译:on-hire survey report
问答题
翻译:on-hire survey report
参考解析
解析:
暂无解析
相关考题:
In the initial survey,_______compiles the survey report and fills in certificateA.surveyorB.chief engineerC.administratorD.company superintendent
Whichreportwillprovideinformationonthemostrecentlycompletedplan?() A.Report08-JobHistogramB.Report07-JobHistoryListingC.Report10B-ActualProductionDetailD.Report11-PlannedProductionSchedule
Zhongxing Chemicals Corporation in China exported two tons of disinfectant (消毒剂) in one container to the United States. The trade was effected on the term of CIF New York US$ 20000. Upon the reception of the consignment at New York Port, the Consignee found the disinfectant was wet and useless according to the normal function of the substance. The consignee brought the claim against the Carrier and Insurer and gave the notice to the local survey agent mentioned in the Policy without any delay. The cause and origin of the damage, in accordance with the survey report, is the moisture in the Container, resulting either from: Stuffing of the goods in an atmosphere with a high hygrometry (湿度) Accidental wetting by rainwater during the course of stuffing Stowing the bags on wet wooden bases.Questions:(可用中文回答)(1)What shall we do according to the survey report?(2) If the shipper presented a loading inspection report as follows, what measures shall we take?
VESSEL’S EXPERIENCE FACTOR is likely used in ______ cargo survey report.A.generalB.liquidC.containerD.heavy
资料:Your Company Logo and Contact InformationJanuary 11, 2005Brian Eno, Chief EngineerEcology Systems, Inc.8458 Obstructed View LaneDurham, NC 27708Dear Mr. Eno:Enclosed is the report estimating our power consumption for the year as requested by John Brenan, Vice President, on September 4.The report is the result of several meetings with Jamie Anson, Manager of Plant Operations, and her staff and an extensive survey of all our employees. The survey was delayed by the transfer of key staff in Building A. We believe, however, that the report will provide the information you need to furnish us with a cost estimate for the installation of your Mark II Energy Saving System.We would like to thank Billy Budd of ESI for his assistance in preparing the survey. If you need more information, please let me know.Sincerely,Nora CassidyNew Projects Officencassidy@company.comEnclosure: Reporthe following factors all contributed to the completion of the report except___.A.the transfer of key staffB.an extensive survey of all employeesC.the help of Jamine AnsonD.some meeting with the staff of Plant Operations
资料:Your Company Logo and Contact InformationJanuary 11, 2005Brian Eno, Chief EngineerEcology Systems, Inc.8458 Obstructed View LaneDurham, NC 27708Dear Mr. Eno:Enclosed is the report estimating our power consumption for the year as requested by John Brenan, Vice President, on September 4.The report is the result of several meetings with Jamie Anson, Manager of Plant Operations, and her staff and an extensive survey of all our employees. The survey was delayed by the transfer of key staff in Building A. We believe, however, that the report will provide the information you need to furnish us with a cost estimate for the installation of your Mark II Energy Saving System.We would like to thank Billy Budd of ESI for his assistance in preparing the survey. If you need more information, please let me know.Sincerely,Nora CassidyNew Projects Officencassidy@company.comEnclosure: ReportWhich of the following is true according to the email?A.more information can be provided as needed.B.the survey has not been finished yet.C.the receiver is the writer's immediate boss.D.the enclosed report was solely made by the writer.
Where should known problem areas in the site survey be documented?()A、nowhere (but should be discussed with the customer)B、on the site survey map and within the site survey textC、on the customers blueprintsD、in the Cisco WCS Planning Tool
Which of the following commands will fail?() A、 report schemaB、 report need backupC、 report need backup days 3D、 report userE、 report obsolete
单选题Where should known problem areas in the site survey be documented?()Anowhere (but should be discussed with the customer)Bon the site survey map and within the site survey textCon the customers blueprintsDin the Cisco WCS Planning Tool
判断题LIFEBOATMEN!CHECK EQUIPMENT OF CTEW AT ASSEMBLY STATIONS AND REPORT.可翻译成:艇上人员注意,检查在集合站的船员的装备并报告。A对B错
单选题Draft readings shall be considered as()in the draft survey report.Aincoming dataBworking dataCoutgoing dataDnew data
单选题Upon underwater detection, there were no apparent defects on the bottom plates, bilge keels,rudder and propeller of the said vessel. This kind of wording usually appeared on().Aship surveyor's reportBa ship's certificateCa cargo inspection reportDa dive survey report
单选题If some surveys refer to statutory survey and ship classification survey but occur temporarily, we call them ()Aperiodic surveyBstatutory surveyCadditional surveyDannual survey
单选题() is/are the legal survey institution(s) that stated by PRC.AShip Survey BureauBCCSCMaritime Safety AdministrationDall of the above
单选题Statutory survey could be divided into two kinds, they are ()Afirst survey and certificate exchange surveyBfirst survey and operation surveyCfirst survey and periodic surveyDclassification survey and certificate exchange survey
单选题After arrived at the port, if it is necessary to lift the piston out and inspect the M-E temporarily, the chief engineer should report the situation to the(), and the operation could be performed only after having the approvement of relevant department.Amaritime safety administrationBship survey bureauCcompany managerDcaptain
单选题In the first survey, () compiles the survey report and fills in certificate.AsurveyorBchief engineerCcaptainDchief mate
单选题The first survey has two situations, one is changing () survey, the another is making survey.AregistryBship hullCnationalityDreplacing machineries and electric devices
问答题翻译:on hire survey