问答题What is the next number in this sequence: 3, 12, 60, 360, ...?

问答题
What is the next number in this sequence: 3, 12, 60, 360, ...?

参考解析

解析:
数列后项与前项的商依次是4、5、6,下一项应该是7,故下一个数是2520。

相关考题:

When files are transferred between a host and an FTP server, the data is divided into smaller pieces for transmission. As these pieces arrive at the destination host, they must be reassembled to reconstruct the original file. What provides for the reassembly of these pieces into the correct order?A.The sequence number in the TCP headerB.The Start Frame. Delimiter in the 802.3 PreambleC.The TTL in the IP headerD.The acknowledgement number in the segment headerE.The frame. check sequence in the Ethernet frame. trailer

An administrator notices that some of their systems are reporting a number in the eferred Level?column on the HMC pdates?panel. WhatAn administrator notices that some of their systems are reporting a number in the ?eferred Level?column on the HMC ?pdates?panel.What is the meaning of the eferred Level?is the meaning of the ?eferred Level?()A.The number denotes the firmware level which will be activated when AIX is next rebooted.B.The number denotes the firmware level which will be activated when all LPARs are next started.C.The number denotes the firmware level which will be activated when the managed system is next restarted.D.The number denotes how many days have elapsed since the firmware was installed without the LPARs being reactivated.

A sequence was created with the DDL statement shown below:CREATE SEQUENCE my_sequence CACHE 10 ORDER The following statements are successfully executed in sequence through separate database connections: CONNECTION1 - VALUES NEXT VALUE FOR my_sequence INTO :con1hvar CONNECTION2 - VALUES NEXT VALUE FOR my_sequence INTO :con2hvar CONNECTION1 - VALUES NEXT VALUE FOR my_sequence INTO:con1hvarWhat is the current value of the :con1hvar host variable?()A.2B.3C.11D.30

What are three values that must be the same within a sequence of packets for Netflow to consider them a network flow?() A.source IP addressB.source MAC addressC.egress interfaceD.ingress interfaceE.destination IP addressF.IP next-hop

2520、360、 60、12、3、( )A.3B.2C.4D.1

Given the following ALTER SEQUENCE statement: ALTER SEQUENCE myseq RESTART WITH 0 INCREMENT BY 1 NO MAXVALUE CACHE 5 ORDER Assuming that the sequence had reached a value of 100 prior to the RESTART, which of the following is true?()A、The next value will be 0 and the sequence will never use the values 101 to 105.B、The next value will be 101 to ensure uniqueness between existing and newly generated sequence values.C、Previously cached values are retained by DB2, and after the restart, will be used for values 101 to 105.D、The next value will be 0 and DB2 will not ensure uniqueness between existing and newly generated values.

What are three values that must be the same within a sequence of packets for Netflow to consider them a network flow?()A、source IP addressB、source MAC addressC、egress interfaceD、ingress interfaceE、destination IP addressF、IP next-hop

You want the ability to recovery any time within the last seven days and therefore you configured the recovery window retention policy using the command:   RMAN CONFIGURE RETENTIOH POLICY TO RKCOVFRY WINDOW OF 7 DAYS;   After configuring the recovery window, you performed the database backup as follows:()  A、 Backup RB1 at log sequence number 12871 on 5th JanB、 Backup RB2 at log sequence number 15622 on 12th JanC、 Backup RB3 at log sequence 16721 on 15th JanD、 On 20th Jan when the log sequence number was 18112 you realize that there Is a need to a point in time at the beginning of the recovery window. You have all an hived redo log files to date.

You are maintaining your database in Oracle10g. You are performing an incomplete recovery because the tablespace, DATA1, was dropped and purged from the Recycle Bin. After performing an incomplete recovery, you open the database with the RESETLOGS option.  What will NOT be the impact of using the RESETLOGS option?()A、 The log sequence for the database will restart from 1.B、 The log sequence number will be written to the control file.C、 The log sequence number will be written to the datafile headers.D、 The log sequence number will be written to the initialization parameter file.

An administrator notices that some of their systems are reporting a number in the eferred Level?column on the HMC pdates?panel. WhatAn administrator notices that some of their systems are reporting a number in the ?eferred Level?column on the HMC ?pdates?panel. What is the meaning of the eferred Level?is the meaning of the ?eferred Level?()A、The number denotes the firmware level which will be activated when AIX is next rebooted.B、The number denotes the firmware level which will be activated when all LPARs are next started.C、The number denotes the firmware level which will be activated when the managed system is next restarted.D、The number denotes how many days have elapsed since the firmware was installed without the LPARs being reactivated.

A sequence was created with the DDL statement shown below:CREATE SEQUENCE my_sequence CACHE 10 ORDER The following statements are successfully executed in sequence through separate database connections: CONNECTION1 - VALUES NEXT VALUE FOR my_sequence INTO :con1hvar CONNECTION2 - VALUES NEXT VALUE FOR my_sequence INTO :con2hvar CONNECTION1 - VALUES NEXT VALUE FOR my_sequence INTO:con1hvarWhat is the current value of the :con1hvar host variable?()A、2B、3C、11D、30

When performing incomplete recovery using UNTIL SEQUENCE with RMAN, which two pieces of information are required?()A、Thread number.B、Log Sequence number.C、Control file sequence number.D、Name of the last archived log.

What methods of point-in-time recovery are available?()A、 Change-basedB、 Cancel-basedC、 Time-basedD、 Sequence number-basedE、 Transaction number-based

单选题Which components are needed for successful and most efficient recovery.()A The backup RB3 and the current online redo log filesB the backup RB2 and the archived redo log files after the log sequence number 15622C Backup R81 and the archived redo log hies after the log sequence number 12871D The backup RB3 and the archived redo log files after the log sequence number 16721

多选题What are three values that must be the same within a sequence of packets for Netflow to consider them a network flow?()Asource IP addressBsource MAC addressCegress interfaceDingress interfaceEdestination IP addressFIP next-hop

单选题You are maintaining your database in Oracle10g. You are performing an incomplete recovery because the tablespace, DATA1, was dropped and purged from the Recycle Bin. After performing an incomplete recovery, you open the database with the RESETLOGS option.  What will NOT be the impact of using the RESETLOGS option?()A The log sequence for the database will restart from 1.B The log sequence number will be written to the control file.C The log sequence number will be written to the datafile headers.D The log sequence number will be written to the initialization parameter file.

问答题What is the next number in the following sequence?  1 - 2 - 3 - 5 - 8 - 13

问答题What is the next number in this sequence: 3, 12, 60, 360, ...?

问答题What is the next number?983, 147, 49, 18, ?.

多选题Examine the structure of the EMPLOYEES table: EMPLOYEE_ID NUMBER NOT NULL, Primary Key EMP_NAME VARCHAR2(30) JOB_ID NUMBER SAL NUMBER MGR_ID NUMBER References EMPLOYEE_ID column DEPARTMENT_ID NUMBER Foreign key to DEPARTMENT_ID column of the DEPARTMENTS table You created a sequence called EMP_ID_SEQ in order to populate sequential values for the EMPLOYEE_ID column of the EMPLOYEES table. Which two statements regarding the EMP_ID_SEQ sequence are true? ()AYou cannot use the EMP_ID_SEQ sequence to populate the JOB_ID column.BThe EMP_ID_SEQ sequence is invalidated when you modify the EMPLOYEE_ID column.CThe EMP_ID_SEQ sequence is not affected by modifications to the EMPLOYEES table.DAny other column of NUMBER data type in your schema can use the EMP_ID_SEQ sequence.EThe EMP_ID_SEQ sequence is dropped automatically when you drop the EMPLOYEES table.FThe EMP_ID_SEQ sequence is dropped automatically when you drop the EMPLOYEE_ID column.

问答题Which number should come next in this series?  25, 24, 22, 19, 15, ?

问答题What would be the next number in this series? 0… 5… 1… 4… 2… ?  2 ,3 , -1 , 10

问答题Which number should come next in this series?  3, 5, 8, 13, 21, ?

单选题A number a increased by 20% of a results in a number b. When b is decreased by 33(1/3)% of b, the result is c. The number c is what percent of a?A40%B60%C80%D120%E150%

问答题What is the next number?  65536, 256, 16,?

问答题4 9 6 2 3 4 7 8 2 1 9 6 4 3 2  Multiply by 7 the number of odd numbers which are immediately followed by an even number in the list above. What is the answer?

问答题Which number comes next in this series?  2736,9108,17127,89298,?

单选题What is the next term in the sequence: 2, 8, 32, 128…?A512B510C452D324E550