单选题In determining the scope of cable to be used when anchoring,what would NOT be considered?().ADepth of the waterBCharacter of the holding groundCmaintenance cost for the chainDType of anchor cable

单选题
In determining the scope of cable to be used when anchoring,what would NOT be considered?().
A

Depth of the water

B

Character of the holding ground

C

maintenance cost for the chain

D

Type of anchor cable


参考解析

解析: 暂无解析

相关考题:

In which of the following scope management processes are subject matter experts used?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification

140 In which of the following scope management processes are subject matter experts used? A. InitiationB. Scope planningC. Scope DefinitionD. Scope change controlE. Scope verification

● A work breakdown structure (WBS) is a tool used to define and group a project's discrete work elements in a way that helps organize and define the total work scope of the project. A WBS is most useful for(72) .(72)A.identifying individual tasks for a projectB.scheduling the start of tasksC.scheduling the end of tasksD.determining potential delays

An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()A. Straight-through cable is used to connect both switchesB. Loopback plug is connectedC. Crossover cable is used to connect both switchesD. Cable is a rollover cable

When the BGP path selection process is being performed on a Cisco router, which BGP attribute is used first when determining the best path?() A. local preferenceB. MEDC. weightD. or iginE. next - hopF. AS - path

You are anchoring in 16 fathoms of water.On a small to medium size vessel,the ______.A.Anchor may be dropped from the hawse pipeB.Anchor should be lowered to within 2 fathoms of the bottom before being droppedC.Scope should always be at least ten times the depth of the waterD.Scope should always be less than 5 times the depth of the water

For determining the amount of chains used in anchoring operation, which one of the following factors would’t be considered?______.A.selection of landmarksB.character of sea bottomC.strength of current and wind forceD.radius of ship swing to wind or tide

If you shorten the scope of anchor cable, your anchor’s holding power ______.A.decreasesB.increasesC.remains the sameD.has no relation to the scope

In determining the scope of cable to be used when anchoring, what would NOT be considered__________.A.Depth of the waterB.Character of the holding groundC.maintenance cost for the chainD.Type of anchor cable

In determining the scope of anchor line to pay out when anchoring a small boat, one must consider the ______.A.charted depth of water onlyB.depth of water, including tidal differencesC.time and date of anchoringD.type of anchor being used

When the BGP path selection process is being performed on a Cisco router, which BGP attribute is used first when determining the best path?()A、local preferenceB、MEDC、weightD、or iginE、next - hopF、AS - path

An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()A、Straight-through cable is used to connect both switchesB、Loopback plug is connectedC、Crossover cable is used to connect both switchesD、Cable is a rollover cable

When is an implicit anchor created?()A、When an object is enclosed by another object. B、When a page break after pagination property is enabled. C、When a link is created between two objects. D、When a keep with anchoring object pagination property is enabled.

单选题For determining the amount of chains used in anchoring operation,which one of the following factors wouldn’t be considered?().Aselection of landmarksBcharacter of sea bottomCstrength of current and wind forceDradius of ship swing to wind or tide

单选题A grapnel is a().Adevice for securing a chain topping liftBhook to prevent the anchor cable from slippingCdevice used to drag for a submerged cable or lineDtype of clam bucket used for discharging bulk cargo

单选题Which statement concerning the navigation of a vessel in ice is FALSE?()AAnchoring in the presence of ice is not recommended except in an emergencyBTowing a vessel through an ice field is not recommended except in an emergencyCThe Free and Proceed system of escorting a beset vessel cuts down on the number of freeing operationsDWhen anchoring in ice,it is advisable to increase the scope of the chain over what is normally used for non-icing conditions

单选题When can routine communications be resumed when radio silence has been imposed?()AAfter determining that the frequency or channel appears to be no longer in useBAfter determining that geographic distance from the distress situation will prohibit any other signal from interfering with emergency communicationsCRoutine communications can resume after the Rescue Coordination Center transmits a message on the frequency or channel being used for emergency communications stating that such traffic has concludedDIf,in the Master's opinion,communications on that frequency will interfere with emergency communications

单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().Athe vessel has enough room to swing while at anchorBthe anchor flukes bite into the ocean bottomCthere is a sufficient scope of chain to keep the anchor on the bottomDthere is more chain out than there is in the chain locker

单选题If you shorten the scope of anchor cable,your anchor’s holding power().AdecreasesBincreasesCremains the sameDhas no relation to the scope

单选题A “Mediterranean moor” should be used when().Awhen anchoring in the MediterraneanBwhen docking stern to a berthCwhen docking bow to a berthDwhen anchoring in a strong current

单选题The holding power of an anchor at a given scope of cable increases when the().Aamount of chain lying along the bottom increasesBlength of the catenary is reducedCmooring line tension is increasedDamount of chain lying along the bottom decreases

单选题To safely anchor a vessel there must be sufficient scope in the anchor cable. Scope is the ratio of().Aweight of cable to weight of vesselBweight of cable to weight of anchorClength of anchor to depth of waterDlength of cable to depth of water

单选题When determining a customer’s technical requirements for a Cisco Unified Communications solution, which important tool can be used to determine the bandwidth used by different codecs with various protocols over different media?()ANetwork Codec Aggregator ToolBBandwidth Estimator ToolCUnified Communication Bandwidth ToolDVoice Bandwidth CalculatorEVoice Codec Bandwidth Calculator

单选题An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()AStraight-through cable is used to connect both switchesBLoopback plug is connectedCCrossover cable is used to connect both switchesDCable is a rollover cable

单选题What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()AOne shot of chain for every ten feet of waterBOne shot of chain for every fifteen feet of waterCOne shot of chain for every thirty feet of waterDOne shot of chain for every ninety feet of water

单选题In determining the scope of anchor line to pay out when anchoring a small boat,one must consider the().Acharted depth of water onlyBdepth of water,including tidal differencesCtime and date of anchoringDtype of anchor being used

单选题When anchoring a vessel under normal conditions,which scope of chain is recommended? ()AFour times the depth of waterBTwo and one-half times the depth of waterCFive to seven times the depth of waterDFifteen times the depth of water