单选题The PSCO would be justified in making a detailed inspection of all life-saving appliances, if he sees that ().Athe survival craft launching equipment have never been usedBthe pivot points are seizedCthe lashing or stowing of deck cargo is improperDAll of the above signs are evident

单选题
The PSCO would be justified in making a detailed inspection of all life-saving appliances, if he sees that ().
A

the survival craft launching equipment have never been used

B

the pivot points are seized

C

the lashing or stowing of deck cargo is improper

D

All of the above signs are evident


参考解析

解析: 暂无解析

相关考题:

● A comprehensive definition of scope management would be:A Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.B Approval of the scope baseline.C Approval of the detailed project charter.D Configuration control.E Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.

Directions: Translate the following into Chinese: (20 marks)Mr. Graber believed, therefore, that it might be advisable to consider setting up some research into these inspection methods. Several important sales campaigns were about to be launched, and, in addition, it was hoped that a number of trade delegations visiting Switzerland in the near future would place large orders for office equipment with Schweibeur and its associates. So there was a need to reduce poor quality as soon as possible. (7marks)Mr. Graber referred to a trip round the world that he would be making within the next twelve months. He would be visiting many Schweibeur associates and subsidiary companies and look forward to seeing all those present once again, in their own countries. (3 marks)In the discussion that followed, Mr. Aguirre said that he had also had reports about poor quality in some items. He thought that research into this problem could be very beneficial, and considered that it would probably show that a majority of supervisors were not flexible enough in their methods. Mr. Fox agreed that there was a case for looking into the whole problem in detail, and confirmed that many inspection staff might be rather conservative in their methods. Perhaps because they tended to be older employees. Miss Lachenal agreed that this opinion was probably correct, and suggested some aspects of the problem that might be examined by the research team. Some detailed discussion of these followed. (10 marks)

-Can we discuss the question of commodity inspection? - ________ A OK. As an integral part of the contract, the inspection of goods is particularly important. ;B We would prefer to re-inspect goods at the unloading port. ;C But there might be some dispute over the results of inspection.

No bike would have had a prayer of passing a modern inspection. It’s ___. A、just as wellB、as wellC、just okD、just well

Either way, a permit and inspection would be required. (英译汉)

Albert Szent-Gy?rgyi would most likely agree that[A] scientific claims will survive challenges.[B]discoveries today inspire future research.[C] efforts to make discoveries are justified.[D]scientific work calls for a critical mind.

Various security measures are recommended EXCEPT ________.[A] turning off network services[B] employing a full-inspection firewall[C] making sure that servers and applications are patched[D] eliminating all unneeded programs

If the PSCO from general impressions or observations on board has _____ for believing that the ship, its equipment or its crew do not substantially meet the requirements, the PSCO should proceed to a more detailed inspection.A.clean reportB.serious deficienciesC.clear groundD.detention report

Commodity inspection may serve as the basic evidence for ( ) trade disputes.A. testing B. inspectingC. resolving D. making

While creating a job class using the DBMS_SCHEDULER package, you set the logging level to LOGGING_RUNS. What would be the impact of this setting?()A、 Oracle Scheduler would write detailed information to the job log for each run of each job in the job class.B、 Oracle Scheduler would write detailed information to the job log for the first run of each job in the job class.C、 Oracle Scheduler would write detailed information to the job log for each run of only the first job in the job class.D、 Oracle Scheduler would write detailed information for all operations performed on all jobs in the job class.

They will ()out a more detailed inspection.A、carriedB、carryingC、to carryD、carry

Commodity inspection may serve as the basic evidence for()tradedisputes.A、testingB、inspectingC、resolvingD、making

单选题If the PSCO from general impressions or observations on board has () for believing that the ship, its equipment or its crew do not substantially meet the requirements, the PSCO should proceed to a more detailed inspection.Aclean reportBserious deficienciesCclear groundsDdetention report

单选题If the PSCO has clear grounds for carrying out a more detailed inspection, ()should be immediately informed of these grounds.Athe masterBthe chief engineerCthe owner of the shipDthe manager who assumes the responsibility for operation of the ship

单选题Which one is NOT the ‘clear grounds’ for a more detailed inspection?()Aabsence of engine log bookBserious corrosion on the hullCone page missing in the oil record bookDpaint peeling off some tailings in engine rooms

单选题While creating a job class using the DBMS_SCHEDULER package, you set the logging level to LOGGING_RUNS. What would be the impact of this setting?()A Oracle Scheduler would write detailed information to the job log for each run of each job in the job class.B Oracle Scheduler would write detailed information to the job log for the first run of each job in the job class.C Oracle Scheduler would write detailed information to the job log for each run of only the first job in the job class.D Oracle Scheduler would write detailed information for all operations performed on all jobs in the job class.

单选题During inspection of oil and oily mixtures from machinery spaces, which of the following factors should be taken into account by the PSCO? ()AThe quantity of oil residues generatedBThe capacity of sludge and bilge water holding tankCThe capacity of the oily water separatorDAll of the above

单选题进行安全检查。()ACarry out safety inspection.BCarry out more detailed inspection.CCarry out important inspection.DCarry out relevant inspection.

单选题If (),the PSCO should proceed to a more detailed inspection.Athe PSCO’s general impression confirm a good standard of maintenanceBthe certificates are validCthe PSCO believes the ship doesn’t meet the requirementsDthe PSCO can’t find deficiencies at first glance

单选题If the PSCO has clear grounds for carrying out a more detailed inspection,()Athe master should be immediately informedBthe master will be prohibited from contacting the Administration or other organizationChe will carry out the inspection after the master be informed and be readyDhe will carry out the inspection without informing the master

单选题Which one is NOT the ‘clear grounds’ for a more detailed inspection?()Athe master and the chief engineer are unable to communicate effectivelyBserious corrosion on the hullCdamaged sanitary pumpDone page missing in the oil record book

单选题Which one is NOT the ‘clear grounds’ for a more detailed inspection?()Ano operation procedures for the oil separatorsBengine log book missingCthe master and the chief engineer are unable to communicate effectivelyDabsence of an up-date muster list

单选题Which one is the ‘clear grounds’ for a more detailed inspection?()Apaint peeling off the uptakeBno operation procedures for the oil separatorsCone of ship’s certificates required is invalidDdamaged sanitary pump

单选题They will ()out a more detailed inspection.AcarriedBcarryingCto carryDcarry

单选题When the PSCO would like to witness a fire drill carried out by the crew, he should consult ()to locate a simulated fire.Athe manager of the companyBthe surveyor of the Classification SocietyCthe master of the vesselDthe chief engineer of the vessel

单选题During PSC inspection related to the ISM Code, of the Safety Management System (SMS) should be carried out if clear grounds are established()Aa less favorable inspectionBa more favorable inspectionCa less detailed inspectionDa more detailed inspection

单选题In deciding to detain a ship or not, the PSCO would better not()Amake his decision independentlyBrequest the owner’s representative to provide proposalsCcooperate with the flag State Administration’s representativesDconsult the organization responsible for issuing the relevant certificates