单选题According to the regulations,to prevent excessive pressure buildup in cargo tanks containing LFG,they are fitted with().Apressure vacuum relief valvesBexcess flow valvesCsafety relief valvesDflame screens

单选题
According to the regulations,to prevent excessive pressure buildup in cargo tanks containing LFG,they are fitted with().
A

pressure vacuum relief valves

B

excess flow valves

C

safety relief valves

D

flame screens


参考解析

解析: 暂无解析

相关考题:

To prevent excessive __ in the transverse girders, the tie bolts are positioned as close to the center of the crankshaft as possibleA.thermal stressesB.bending momentsC.thermal loadsD.surface tensions

Low compressor head pressure in a refrigeration system can be caused by ___.A.insufficient condenser cooling waterB.excessive condenser cooling waterC.air in the refrigeration systemD.excessive refrigerant in the system

Which of the following problems could cause the high pressure cutout switch to shut down the compressor in a refrigeration system?A.A shortage of liquid refrigerant.B.Excessive frost on the evaporator.C.Excessive condenser cooling water.D.Insufficient condenser cooling water flow.

If a diesel engine turned over freely but failed to start, the cause could be ________.A.water in the fuelB.cold lube oilC.excessive starting air pressureD.excessive fuel pressure

If a centrifugal pump is driven by a constant speed electric motor and produces a discharge pressure less than designed, the cause is probably ______.A.excessive pump speedB.excessive suction headC.worn wearing ringsD.gross pump misalignment

According to the regulations,what type of gauging is required for a cargo of butadiene?A.OpenB.RestrictedC.ClosedD.None

When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list

The Database Resource Manager is automatically enabled in the maintenance window that runs the Automated Maintenance Task. What is the reason for this?()  A、 to prevent the creation of an excessive number of scheduler job classesB、 to allow the Automated Maintenance Tasks to use system resources without any restrictionC、 to allow resource sharing only among the Automated Maintenance Tasks in the maintenance windowD、 to prevent the Automated Maintenance Tasks from consuming excessive amounts of system resources

单选题In () pump a closed discharge valve will not cause excessive pressure to build up.AgearBvaneCscrewDcentrifugal

单选题An increase in diesel engine crankcase pressure generally indicates excessive()Acompression pressureBlube oil header pressureCscavenge air pressureDpiston ring blow-by

单选题To avoid excessive surge pressure when bunkering, you should ()Abunker at a normal rateBcheck for kinks in hoseCclose valves slowlyDshut valves before topping off

单选题Excessive diesel engine back pressure may be an indication of ()Acarbon buildup in the exhaust manifoldBovercooling of the exhaust manifoldCeroded muffler baffle platesDhigh injection pressure

单选题Which of the following condition is likely to develop if the thermocouple element of a pyrometer becomes coated with excessive amounts of combustion by-products?()AIndicated exhaust pressure readings will increaseBPyrometer responses will be retardedCIndicated cylinder temperature readings will increaseDIndicated firing pressure readings will increase

名词解释题压力负荷过度(excessive pressure load)

单选题Which of the following will take place if the clearance of the main bearings are excessive?()Abearing knocksBdropping of pressure of LOCnoisesDall the above

单选题Which of the following may take place if the clearance of the main bearings are excessive?()Abearing knocksBdropping of pressure of LOCnoisesDall the above

单选题If the head pressure of a reciprocating refrigeration compressor is excessive, ().Athe relief valve should open before the high pressure cutoutBthe relief valve should open and allow the excess refrigerant to flow to the receiverCthe high pressure cutout switch should operate before the relief valve opensDyou should close in on the suction valve

单选题According to the regulations,what type of gauging is required for a cargo of butadiene? ()AOpenBRestrictedCClosedDNone

单选题Excessive clearances in the main or crank-pin bearings will sometimes be indicated by () before any bearing knock is heard.Aloss of flow in the fuel systemBloss of pressure in the air systemCloss of flow in the lubricating systemDloss of pressure in the lubricating system

单选题An un-loader is installed on an air compressor to ().Abypass the high pressure stage to the low pressure stage on 100% of the air compressors in serviceBprevent excessive inter-stage pressure buildupCcontrol compressor discharge pressureDremove all but the frictional load during starting

单选题A swing check valve is used in a pipeline to ().Amaintain a preset pressure on the lineBclosely regulate the amount of flowCrelieve excessive pressure on the lineDallow flow in one direction only

单选题To prevent excessive () in the transverse girders, the tie bolts are positioned as close to the center of the crankshaft as possible.Athermal stressesBbending momentsCthermal loadsDsurface tensions

单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A5 times the maximum working pressure on the hose during cargo transferBone half the designed working pressureC4 times the pressure of the cargo pump used for transferringD5 times the minimum working pressure on the hose during cargo transfer

单选题The Database Resource Manager is automatically enabled in the maintenance window that runs the Automated Maintenance Task. What is the reason for this?()A to prevent the creation of an excessive number of scheduler job classesB to allow the Automated Maintenance Tasks to use system resources without any restrictionC to allow resource sharing only among the Automated Maintenance Tasks in the maintenance windowD to prevent the Automated Maintenance Tasks from consuming excessive amounts of system resources

单选题According to the ship regulations,the capacity of a liferaft is required to be marked().Aon the station billBon a sign next to the liferaftCon the Certificate of InspectionDin the Operations Manual

单选题To determine the pressure and temperature limitations under which LFG is required to be transported on a barge,you should look at the().ACertificate of InspectionBloading orderCrules and regulations for tankersDtankerman's document

单选题According to the T-Boat regulations the reason for providing adequate ventilation for a battery storage area is to prevent().Aaccumulation of carbon dioxide gas that chokes the batteryBaccumulation of explosive and toxic gases the battery can generateCmildew or dry rot in the battery boxDbattery failure including battery case meltdown caused by excessive heat