After riveting is completed, the joints on the shell of a vessel are generally made watertight by________.A.fayingB.caulkingC.felt or canvas packingD.red lead

After riveting is completed, the joints on the shell of a vessel are generally made watertight by________.

A.faying

B.caulking

C.felt or canvas packing

D.red lead


相关考题:

Allowances may be made for the expansion and contraction in piping by the use of expansion joints or ().A.UnionsB.Retractable flangesC.Union bulkhead fittingsD.Bends or loops in the line

______ of the following statements is INCORRECT regarding a fire and boat drill on board your cargo vessel.A.At least one fire and boat drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedB.The Master is responsible in seeing that each lifeboat is lowered to the water at least once in each 6 months.C.Lifeboat equipment shall be examined at least once each month to insure that it is completeD.An entry shall be made in the vessel's Official Logbook relative to each fire and boat drill

Your vessel has completed an inspection for certification and is issued a Temporary Certificate of Inspection. The Temporary Certificate ______.A.has the full force of the regular Certificate of InspectionB.expires six months after it is issuedC.must be exchanged for a regular Certificate of Inspection within 3 monthsD.is retained in the custody of the Master

Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure?A.Tearing through the member is more likely in this type connectionB.The weld may be broken by the stresses caused by rivetingC.The weld increases the tensile stress on the rivet headsD.The welding must be completed before the riveting commences

A complaint of unseaworthiness by a majority of crew members to the American Consul is found to be justified after a survey is completed.Who must pay the cost of the survey?A.Crew members requesting the surveyB.American ConsulC.MasterD.Vessel's owners

What is(are) standard operating procedure(s) used on a Ro-Ro vessel?A.Periodic inspection and retensioning of lashings as required during voyageB.Lashings may be completed after the vessel leaves portC.One QMED assigned to oversee the initial loading and lashingD.All of the above

After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or______.A.within 4 days after the seaman's dischargeB.prior to the vessel's departure on the next voyageC.prior to loading any out-bound cargoD.prior to any change of Master

Maritime Declaration of Health is generally prepared by the Master ______.A.when his vessel is arriving at a foreign portB.when his vessel is leaving a foreign portC.after his vessel has left a foreign portD.after his vessel has arrived at a port

Deck beams on a vessel are generally spaced at equal intervals and run ______.A.longitudinallyB.verticallyC.transverselyD.intermittently

The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe

When a vessel changes course from one cardinal heading to another cardinal heading while adjusting the compass,which action should be taken ________.A.The course change should be made rapidly to prevent transient induced magnetism while passing the intercardinal headingsB.After the new heading is reached,the vessel should steam on that course for at least two minutes before the adjustmentC.During the course change,you should gently tap the compass to remove any error caused by friction on the pivot bearingD.After steadying on the new heading,the compass card should be slewed by a magnet and allowed to oscillate freely to remove any gaussin error

船舶由船体和上层建筑组成。()A、A vessel is made up of the hull and the superstructure.B、A vessel is made up of the hull and the bridge.C、A vessel is made up of the hull and the forecastle.

单选题Generally,you can best keep a vessel under steering control when the vessel has().AHeadwayBSternwayCNo way on,with engines stoppedDNo way on,with engines full ahead

单选题What is(are) standard operating procedure(s) used on a Ro-Ro vessel? ()APeriodic inspection and retensioning of lashings as required during voyageBLashings may be completed after the vessel leaves portCOne QMED assigned to oversee the initial loading and lashingDAll of the above

单选题A vessel is()when she is not at anchor,made fast to the shore,or aground.AunderwayBmaking wayCdead in the waterDa power driven vessel

单选题After riveting is completed, the joints on the shell of a vessel are generally made watertight by().AfayingBcaulkingCfelt or canvas packingDred lead

单选题Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()ATearing through the member is more likely in this type connectionBThe weld may be broken by the stresses caused by rivetingCThe weld increases the tensile stress on the rivet headsDThe welding must be completed before the riveting commences

单选题船舶由船体和上层建筑组成。()AA vessel is made up of the hull and the superstructure.BA vessel is made up of the hull and the bridge.CA vessel is made up of the hull and the forecastle.

单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().AstringBstandCjointDstandpipe

单选题Deck beams on a vessel are generally spaced at equal intervals and run().AlongitudinallyBverticallyCtransverselyDintermittently

单选题Your vessel has completed an inspection for certification and is issued a Temporary Certificate of Inspection. The Temporary Certificate().Ahas the full force of the regular Certificate of InspectionBexpires six months after it is issuedCmust be exchanged for a regular Certificate of Inspection within 3 monthsDis retained in the custody of the Master

单选题The bearing shell generally has () for location and oil grooves round the center of its axial length.AtipsBtagsClipsDkeys

单选题After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().Awithin 4 days after the seaman's dischargeBprior to the vessel's departure on the next voyageCprior to loading any out-bound cargoDprior to any change of Master

单选题A continuous sounding of a fog-signal apparatus indicates().Athe vessel is in distressBthe vessel has completed loading dangerous cargoCit is safe to passDthe vessel is anchored

单选题A current perpendicular to a vessel’s track has the greatest effect on the vessel’s course made good().Aat high vessel speedsBat low vessel speedsCin shallow waterDin deep water

单选题A breeches buoy is being rigged from the shore to a stranded vessel. The initial shot line passed to the vessel is normally made fast to a().Ahawser which is used to pass a tail-block and whip to the vesselBhawser with breeches buoy and harness attachedChawser which should be made fast to the vessel below the intended location of the tail-blockDtail-block and whip which may be used to pass a hawser to the vessel

单选题A “liner” in riveted construction of a vessel is a(n) ().Asmall plate which fills the aperture between riveted strakes and the vessel framingBbacking plate which is used to level the strakes while riveting,and then removedCinternal frame to which the side shell is rivetedDseam that is welded after riveting is completed