单选题Fins are installed on the generating tube surfaces in waste heat boilers to ().Aprevent soot fires in the exhaust systemBprevent exhaust gas erosion of the tubesCincrease the velocity of exhaust gas flowDincrease the rate of heat transfer

单选题
Fins are installed on the generating tube surfaces in waste heat boilers to ().
A

prevent soot fires in the exhaust system

B

prevent exhaust gas erosion of the tubes

C

increase the velocity of exhaust gas flow

D

increase the rate of heat transfer


参考解析

解析: 暂无解析

相关考题:

Fusible plugs are installed in fire-tube boilers to _____.A.provide a means of draining the boilerB.warn the engineer of low water levelC.cool the crown sheet at high firing ratesD.open the burners electrical firing circuits

什么是FINS通信协议?如何使用?

以太网中的节点如何从FINS节点地址转换为IP地址?

下列关于Insert Surfaces命令说法正确的是()。A、Insert Surfaces命令可以在曲面与曲面之间生成新的相交曲面B、Insert Surfaces命令可以在曲面与曲面之间生成新的相交曲线C、Insert Surfaces命令不可以得到独立的相交曲线D、Insert Surfaces命令不可以得到曲面曲线

()接头用于Tube管和Tube管之间的连接。

Identify the activities performed as part of the Automatic SQL Tuning process in the maintenance window?()A、generating the SQL profileB、testing and accepting the SQL profileC、generating a list of candidate SQLs for tuningD、adding tuned SQL plans into the SQL plan baselineE、tuning each SQL statement in the order of importanceF、generating baselines that include candidate SQLs for tuning

问答题什么是FINS通信协议?如何使用?

单选题The flash-evaporator is different with the submerged-tube evaporator in that for the former()AWater is heated into vapor on heating surfacesBWater is vaporized by pressure differenceCThere are no heating-transfer surfacesDThere are more heating-transfer surfaces

单选题What is NOT a function of the steam drum of a marine water-tube boiler().AReceives saturated steam from the generating tubesBServes as a reservoir of boiler feed waterCHolds internal fittings for separation of moisture from steamDCollects steam exhausted from the turbines

单选题An exhaust gas bypass is installed on a waste heat boiler in order to ().Abypass exhaust gas at high loads to prevent excessive back pressureBbypass a portion of the exhaust gas at peak loads for better efficiencyCrecycle exhaust gas to the turbochargerDminimize moisture condensation in the boiler gas passages at low loads

单选题The diesel engine exhaust gas bypass, as fitted with some waste heat boilers, is installed to ()Aprevent engine back pressure at heavy loadsBincrease total engine efficiency at low loadsCprevent boiler corrosion at low engine loadsDimprove engine fuel consumption at any load

单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()Anatural circulation of the water in the water tube boiler is better than that in the fire tube boilerBfor the same output the water tube boiler will carry less mass of water compared with the fire tube boilerCthe water tube boiler will cost shorter time for steam raisingDthe water tube boiler require lower skill in operating and maintaining

单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().Aoperating the boiler at less than normal water levelBinstalling fins on the firesides of water-tubesCincreasing the amount of excess air to the burnersDtreating the boiler water with chemical oxygen scavengers

单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()Aremove suspended and precipitated solids from the boiler waterBcompletely drain the boiler in an emergency situationCprevent hardened scale deposits in the water drumDremove floating impurities from the oily water surface

单选题Fusible plugs are installed in fire-tube boilers to ().Aprovide a means of draining the boilerBwarn the engineer of low water levelCcool the crown sheet at high firing ratesDopen the burners electrical firing circuits

单选题Diesel engine waste heat boiler construction is usually of the fire-tube or()Acyclone furnace boiler typeBdry back boiler typeCwater-tube typeDcritical circulation boiler type

单选题Generating tubes in waste heat boilers are finned to ().Areduce gas flow turbulenceBprevent exhaust gas corrosionCincrease the rate of combustionDincrease the rate of heat transfer

单选题Generally the function of lubrication is to form of a film of lubricant between any two surfaces that have relative (), so that surfaces dont get touch with each other.AgravityBmotionCratioDdensity

单选题Exhaust pipes for separate diesel engines can be combined only when ()Aspace limitations prevent separately run pipesBthe engines are small auxiliary unitsCthey are arranged to prevent gas backflow to each engineDa waste heat boiler is installed

单选题Fins are installed on the fireside of water-tubes used in waste boiler to()Adecrease the velocity of gases flowing past the tubesBincrease the rate of heat transferCreduce accumulations carbon depositsDdirect the flow of gases

单选题Fins are installed on the generating tube surfaces in waste heat boilers to ().Aprevent soot fires in the exhaust systemBprevent exhaust gas erosion of the tubesCincrease the velocity of exhaust gas flowDincrease the rate of heat transfer

单选题() will be used to blow away soot and the combustion products from the tube surfaces.AThe blow down valveBThe scum valveCThe air release cockDScot-blower

单选题On which of the following heated surfaces of a flash type evaporator would you be more likely to find soft scale formation?()AFeed-water heater internal tube surfacesBInternal distillate cooler tubesCFlash chamber vertical surfacesDDistilling condenser tubes

单选题What are the most important reasons for using water fog to fight fires?()ASmothers burning surfaces,organically destroys fuelBCools fire and adjacent surfaces,provides protective barrierCReaches areas not protected by steam or CO2 smothering systemsDAllows fire to be attacked from leeward,saturates liquid surfaces

单选题Auxiliary boilers can be classified as()Awater-tube natural circulation boilersBfire-tube boilersCwater-tube forced circulation boilersDall of the above

单选题Auxiliary boilers are divided into several classifications, one of which is()Afire-tube controlled circulationBfire-tube supercritical circulationCwater-tube natural circulationDwater-tube express circulation

单选题The solid waste was charged into the incinerator through ().Athe solid waste dump chuteBan access doorCthe same way for waste oil burnersDa changing opening

单选题A waste heat boiler is installed on some diesel propelled vessels to ().Aprovide steam for emergency propulsionBprovide steam for the turbo-generatorCheat the waste water tanksDsteam for warming engines