单选题Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()ARemoves the requirement for Intelligent PDUsBMonitor and balance disk speeds according to utilization needsCIs a required element for EnergyStar certification of the server/data centerDMonitor and report power and thermal trending to optimize energy consumption
单选题
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()
A
Removes the requirement for Intelligent PDUs
B
Monitor and balance disk speeds according to utilization needs
C
Is a required element for EnergyStar certification of the server/data center
D
Monitor and report power and thermal trending to optimize energy consumption
参考解析
解析:
暂无解析
相关考题:
Which of the following Cool Blue technologies will help energy consumption budgeting of System x servers based upon current actual consumption? ()A、IBM Standalone Solutions Configuration Tool (SSCT)B、IBM Active Energy ManagerC、Rear Door Heat eXchangerD、IBM Power Configurator
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()A、Removes the requirement for Intelligent PDUsB、Monitor and balance disk speeds according to utilization needsC、Is a required element for EnergyStar certification of the server/data centerD、Monitor and report power and thermal trending to optimize energy consumption
It takes a comprehensive strategy to grow data center capabilities while containing power and cooling costs. Which IBM thermal environment solution can best support this strategy with no effect on performance? ()A、IBM Rear Door Heat eXchangerB、IBM Active Energy ManagerC、IBM Calibrated Vector CoolingD、All of the above
Which of the following is included in IBM Systems Director Express Edition?()A、Energy managementB、Virtual image deploymentC、Virtual resource managementD、Networking device management
Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()A、PowerExecutiveB、Active Energy Manager (AEM)C、Tivoli Provisioning Manager (TPM)D、Energy Monitoring and Control (EMC)
What is the name of the IBM solution that helps to monitor power consumption to allow better utilization of available power resources?()A、IBM Capacity ManagerB、IBM Active Energy ManagerC、IBM Remote Deployment ManagerD、IBM Virtualization Manager
A customer who is reducing their technical staff has requested an Intel server proposal from various vendors. Which of the following is most relevant to this proposal?()A、Systems ManagementB、Grid ComputingC、Advanced Energy Manager (AEM)D、Remote KVM
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()A、Redundant power supplies on the serversB、Redundant PDUs in the rackC、edundant power supplies in the servers and redundant PDUs in the rackD、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()A、Removes the requirement for Intelligent PDUsB、Monitor and balance disk speeds according to utilization needsC、Is a required element forEnergyStar certification of the server/data centerD、Monitor and report power and thermal trending to optimize energy consumption "Pass Any Exam. AnyTime." - 14 IBM 000-106: Practice Exam
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A、PowerVM Standard EditionB、VMControl Standard EditionC、Hardware Management ConsoleD、IBM Systems Director Standard Edition
A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()A、Active Energy ManagerB、PowerVM Energy ManagerC、Power and Energy ManagerD、Thermal and Energy Manager
Select 3 features of IBM’s CoolBlue Energy Management Innovation:()A、IBM Active Energy Manager, Calibrated Vectored Cooling, and Water Chilled Door eXchanger B、IBM Active Energy Manager, Front Door Heat eXchanger, and Calibrated Vectored CoolingC、Power Configurator, Calibrated Vectored Cooling, and Rear Door Heat eXchangerD、Thermal Diagnostics, Front Door Heat eXchanger, and Rear Door Heat eXchanger
What are key benefits of IBM Systems Director Standard Edition?()A、Backup data Manage problems Monitor network systemB、Report problems Manage servers and virtual environment Monitor the network C、Monitor system health and network Install and manage AIX and IBM i Manage energy consumption D、Monitor system health and network Manage servers and virtual environment Collect performance data
Which of the following products helps a customer identify a performance bottleneck?()A、Tivoli Storage Manager B、Tivoli Storage Productivity Center for Disk C、Tivoli Storage Productivity Center for Data D、Tivoli Storage Productivity Center for Replication
What is a key ability of IBM Systems Director Enterprise Edition as compared to Standard Edition?()A、Manage multiple operating systems on a serverB、Manage energy consumption and network traffic to increase efficiencyC、Manage LPARs, operating systems and servers to reduce administrationD、Manage workloads across multiple servers to optimize resource utilization
单选题Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()ARemoves the requirement for Intelligent PDUsBMonitor and balance disk speeds according to utilization needsCIs a required element forEnergyStar certification of the server/data centerDMonitor and report power and thermal trending to optimize energy consumption Pass Any Exam. AnyTime. - 14 IBM 000-106: Practice Exam
单选题A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()AActive Energy ManagerBPowerVM Energy ManagerCPower and Energy ManagerDThermal and Energy Manager
单选题A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()ARedundant power supplies on the serversBRedundant PDUs in the rackCedundant power supplies in the servers and redundant PDUs in the rackDRedundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()APowerVM Standard EditionBVMControl Standard EditionCHardware Management ConsoleDIBM Systems Director Standard Edition
单选题It takes a comprehensive strategy to grow data center capabilities while containing power and cooling costs. Which IBM thermal environment solution can best support this strategy with no effect on performance? ()AIBM Rear Door Heat eXchangerBIBM Active Energy ManagerCIBM Calibrated Vector CoolingDAll of the above
单选题A customer who is reducing their technical staff has requested an Intel server proposal from various vendors. Which of the following is most relevant to this proposal?()ASystems ManagementBGrid ComputingCAdvanced Energy Manager (AEM)DRemote KVM
单选题What is the name of the IBM solution that helps to monitor power consumption to allow better utilization of available power resources?()AIBM Capacity ManagerBIBM Active Energy ManagerCIBM Remote Deployment ManagerDIBM Virtualization Manager
单选题Which tool is available for IBM BladeCenter that allows the direct power monitoring by IBM Systems Director 6.2 through the AMM?()APowerExecutiveBActive Energy Manager (AEM)CTivoli Provisioning Manager (TPM)DEnergy Monitoring and Control (EMC)
单选题Select 3 features of IBM’s CoolBlue Energy Management Innovation:()AIBM Active Energy Manager, Calibrated Vectored Cooling, and Water Chilled Door eXchanger BIBM Active Energy Manager, Front Door Heat eXchanger, and Calibrated Vectored CoolingCPower Configurator, Calibrated Vectored Cooling, and Rear Door Heat eXchangerDThermal Diagnostics, Front Door Heat eXchanger, and Rear Door Heat eXchanger
单选题Which of the following products helps a customer identify a performance bottleneck?()ATivoli Storage Manager BTivoli Storage Productivity Center for Disk CTivoli Storage Productivity Center for Data DTivoli Storage Productivity Center for Replication
单选题What is a key ability of IBM Systems Director Enterprise Edition as compared to Standard Edition?()AManage multiple operating systems on a serverBManage energy consumption and network traffic to increase efficiencyCManage LPARs, operating systems and servers to reduce administrationDManage workloads across multiple servers to optimize resource utilization
单选题What are key benefits of IBM Systems Director Standard Edition?()ABackup data Manage problems Monitor network systemBReport problems Manage servers and virtual environment Monitor the network CMonitor system health and network Install and manage AIX and IBM i Manage energy consumption DMonitor system health and network Manage servers and virtual environment Collect performance data