单选题For all the remaining items the stated dates of shipment are(),but in no case would these dates be exceeded by ten days.AapproximateBapproximatelyCaboutDsimilar
单选题
For all the remaining items the stated dates of shipment are(),but in no case would these dates be exceeded by ten days.
A
approximate
B
approximately
C
about
D
similar
参考解析
解析:
暂无解析
相关考题:
All of the following are categories of a milestone in a schedule except:A.End date.B.Contract dates.C.Key events scheduled.D.Imposed dates.E.Task duration.
● All of the following are categories of a milestone in a schedule except:A End date.B Contract dates.C Key events scheduled.D Imposed dates.E Task duration.
All the dishes in this menu, otherwise stated, will serve two to three people.A. as B. if C. though D. unless
Studying Wendys menu, I found that many of the items are similar to ____ of McDonalds. A、thoseB、oneC、anyD、all
In project management,a ( ) is a list of a project’s milestones,activities, and deliverables, usually with intended start and finish dates. Those items are often estimated in terms of resource allocation,budget and duration, linked by dependencies and scheduled events.A.scheduleB.WBSC.SOWD.charter
All of our export dangerous cargo is ______ examined before shipment.A.ThoughB.ThroughC.ThoroughD.Thoroughly
Stated more formally,all object is simply______of a class.A.a partB.a componentC.an instanceD.an example
Stated more formally, all object is simply ______ of a class.A.a partB.a componentC.an instanceD.an example
The commodities were all inspected by the bureau before shipment.A:vehiclesB:cartonsC: goodsD: machines
The commodities were all inspected by the bureau before shipment.A:vehicles B:cartonsC:goods D:machines
Which of the items stated is typically the most expensive method of improving QoS across WAN links?()A、 advanced queuingB、 data compressionC、 header compressionD、 increasing link capacity
During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?() A、 All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B、 All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C、 All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D、 All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
For all the remaining items the stated dates of shipment are(),but in no case would these dates be exceeded by ten days.A、approximateB、approximatelyC、aboutD、similar
As usual,we are going to insure against()for 110% of the invoice value.A、orderB、All Risks and War RiskC、youD、shipment
As per UCP600, the words “to”, “till”, “from”, “between” when used to determine a period of shipment include the date or dates mentioned, the words “before” and “after” exclude the date mentioned. ()
()crowded orders;we have sold out all the goods scheduled for shipment with in this year.A、Asa result ofB、In result ofC、With there sult ofD、As result of
How can Service Items be reordered?()A、 The IBM Maximo Asset Management V6.2 (IMAM) administrator can use the Reorder Items action in the Inventory application to reorder all the Service Items required.B、 The IMAM administrator can create a purchase order (PO) for all the Service Items required and use the Issue on Receipt check box for PO Lines related to Service Items.C、 The IMAM administrator can use the Reorder Direct Issue Items and Services action in the Service Item application to reorder all items or services and are issued without being received into inventory.D、 The IMAM administrator can use the Reorder Direct Issue Items and Services action in the Service Item application to reorder items or services that are listed on approved work orders and are issued without being received into inventory.
单选题In project management , a (73) is a listing of a project’s milestones, activities, and deliverables, usually with intended start and finish dates. Those items are often estimated in terms of resource (74) ,budget and duration, linked by dependencies and scheduled events.AscheduleBactivityCplanDcontractor
单选题How can Service Items be reordered?()A The IBM Maximo Asset Management V6.2 (IMAM) administrator can use the Reorder Items action in the Inventory application to reorder all the Service Items required.B The IMAM administrator can create a purchase order (PO) for all the Service Items required and use the Issue on Receipt check box for PO Lines related to Service Items.C The IMAM administrator can use the Reorder Direct Issue Items and Services action in the Service Item application to reorder all items or services and are issued without being received into inventory.D The IMAM administrator can use the Reorder Direct Issue Items and Services action in the Service Item application to reorder items or services that are listed on approved work orders and are issued without being received into inventory.
单选题Safety is dependent on orderliness and cleanlinessOrder may be maintained by ()Astoring all items in an assigned placeBstoring all items in a common storage container except those ready-for-seaCtagging all items according to their age and then storing them togetherDdisposing of worn-out items
判断题As per UCP600, the words “to”, “till”, “from”, “between” when used to determine a period of shipment include the date or dates mentioned, the words “before” and “after” exclude the date mentioned. ()A对B错
单选题Increasing the speed of a centrifugal pump will result in an increase in its capacity Another means of increasing the capacity of a centrifugal pump is to increase the ().Adiameter of the discharge piping, with all other factors remaining the sameBdiameter of the suction piping, with all other factors remaining the sameCwidth of the impeller onlyDdiameter of the impeller
单选题Which of the items stated is typically the most expensive method of improving QoS across WAN links?()A advanced queuingB data compressionC header compressionD increasing link capacity
单选题During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?()A All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
单选题We have come on board to check with you on the main items of repairs as stated in the().Aorder listBrepair listCstore listDspare parts list
单选题Having ______ all the items on the agenda, the meeting was now open for new items, questions and complaints.AcoveredBcoverCcoversDcovering